You are on page 1of 32

TYPE 22 + MEZZANINE CLUSTER ALIFIA

BMW SEKTOR IV
MANAKIB REALTY

DRAWING FOR ARCHITECTURE QUANTITY SURVEYOR CONSTRUCTION MANAGER GENERAL MANAGER NOTE
F F

E E

D D

C C

B B

A A

1 2 3 4
DENAH PARSIAL LT. DASAR
E E

D D

B B

A A

1 2 4
DENAH PARSIAL LT. MEZZANINE
F F

E E

D D

C C

B B

A A

1 2 3 4
DENAH PARSIAL ATAP
RING BALOK 2 +5.000

LT. MEZZANINE +2.850

PAGAR BELAKANG +1.800

1 2 4

TAMPAK DEPAN PARSIAL


RING BALOK 2 +5.000

LT. MEZZANINE +2.850

PAGAR BELAKANG +1.800

4 2 1

TAMPAK BELAKANG
RING BALOK 2 +5.000

LT. MEZZANINE +2.850

PAGAR BELAKANG +1.800

A B E F G

TAMPAK SAMPING KANAN


RING BALOK 2 +5.000

LT. MEZZANINE +2.850

PAGAR BELAKANG +1.800

G F B A

TAMPAK SAMPING KIRI


RING BALOK 2 +5.000

LT. MEZZANINE +2.850

PAGAR BELAKANG +1.800

A B C E F G

POTONGAN A-A
RING BALOK 2 +5.000

LT. MEZZANINE +2.850

PAGAR BELAKANG +1.800

G F E D B A

POTONGAN C-C
RING BALOK 2 +5.000

LT. MEZZANINE +2.850

PAGAR BELAKANG +1.800

G F E D C B A

POTONGANB-B
RING BALOK 2 +5.000

LT. MEZZANINE +2.850

PAGAR BELAKANG +1.800

1 2 3 4

POTONGAN E-E
RING BALOK 2 +5.000

LT. MEZZANINE +2.850

PAGAR BELAKANG +1.800

1 2 4

POTONGAN D-D
1 2 3 4

G G

F F

E E

D D

C C

B B

A A

1 2 3 4

DENAH KUSEN LT. DASAR


1 2 4

G G

E E

D D

B B

A A

1 2 4

DENAH KUSEN LT. MEZZANINE


TAMPAK

TAMPAK POT. A TAMPAK POT. A TAMPAK POT. A TAMPAK POT. A POT. A POT. B POT. A

POT. A POT. B
PINTU BUKA KE DALAM
POTONGAN ATAS POTONGAN ATAS

POTONGAN SAMPING

DETAIL PINTU ENGINEERING DOOR


PINTU BUKA KE KM/WC & TERAS

POTONGAN BAWAH POTONGAN BAWAH


DETAIL KUSEN ALUMINIUM (JENDELA SWING) DETAIL KUSEN ALUMINIUM (JENDELA FIXED)
1 2 3 4 1 2 4

G G G G
KODE MATERIAL PLAFOND

F F

E E E E

D D D D

C C

B B B B

A A A A

1 2 3 4 1 2 4
DENAH PLAFOND LT. DASAR DENAH PLAFOND LT. MEZZANINE
1 2 3 4 1 2 3 4

G G G G

F F F F

E E E E

D D D D

C C C C

B B B B

A A

A A A A

1 2 3 4 1 2 3 4
DENAH PLAFOND TRITISAN LT. DASAR DENAH PLAFOND TRITISAN LT. MEZZANINE
DETAIL PLAFOND C1 DETAIL PLAFOND C3

1 1

DETAIL PLAFOND C2
DETAIL PLAFOND POTONGAN A
1 2 3 4 1 2 4

G G G G

F F

E E E E

D D D D

C C
1

B B B B
2

A A A A

1 2 3 4 1 2 4
DENAH POLA LANTAI LT. DASAR DENAH POLA LANTAI LT. MEZZANINE
DETAIL POTONGAN - 01 DETAIL POTONGAN - 02 DETAIL POTONGAN - 03

DETAIL POTONGAN - 04
1 2 3 4 1 2 4

G G G G

F F

E E E E

D D D D

C C

B B B B

A A A A

1 2 3 4 1 2 4
DENAH RENCANA LISTRIK LT. DASAR DENAH RENCANA LISTRIK LT. MEZZANINE
1 2 3 4 1 2 3 4

G G G G

F F F F

KETERANGAN :
E E E E

DENAH BAK KONTROL

D D D D

C C C C

B B B B

A A A A

1 2 3 4 1 2 3 4
POTONGAN A
DENAH INSTALASI AIR BERSIH DENAH INSTALASI AIR KOTOR
1 2 3 4 1 2 3 4

SL-2 (15X20) SL-2 (15X20) RB-1 (13X17) RB-1 (13X17)


G G G G
(T.O.B +1.800) (T.O.B +1.800)
SL-2 (15X20)

SL-2 (15X20)
P4

(T.O.B +1.800)
(T.O.B +1.800)

RB-1 (13X17)
RB-1 (13X17)
P4 P4

F F F F

SL-2 (15X20)
P4

SL-1 (15X25) SL-2 (15X20) SL-2 (15X20)


E F1 E E E
F2

SL-2 (15X20)
P1

SL-2 (15X20)
P1
SL-1 (15X25)

P2
P2
SL-2 (15X20) SL-2 (15X20)
D D D D
SL-1 (15X25)

P1
SL-1 (15X25)

P1
P2

SL-2 (15X20)
SL-2 (15X20)
C C C C

P1

SL-1 (15X25) SL-2 (15X20)


B F2 F1 B B B

P1 P1
SL-2 (15X20)

P4
SL-2 (15X20)
SL-2 (15X20)

P3
P4

SL-2 (15X20) SL-2 (15X20)

A A A A

1 2 3 4 1 2 3 4
DENAH PONDASI,SLOOF DAN KOLOM DENAH BALOK BETON RB1 (T.O.B +1.800)
1 2 3 4 1 2 4

G G G G

F F

BALOK BETON B1 (150X300) BALOK LATAI (130X150) BALOK LATAI (130X150)


E E E E
(T.O.B +2.800) (T.O.W +2.200) (T.O.W +2.500)

BALOK LATAI (130X150)

(T.O.W +2.200)
BALOK LATAI (130X150)
D D D D
(T.O.W +2.200)

BALOK LATAI (130X180)


C C
(T.O.W +2.500)

BALOK BETON B1 (150X300) BALOK LATAI (130X200) BALOK LATAI (130X200)


B B B B
(T.O.B +2.800) (T.O.W +2.500) (T.O.W +4.450)

A A A A

1 2 3 4 1 2 4
DENAH BALOK LATAI KUSEN LT. DASAR DENAH BALOK LATAI KUSEN LT. MEZZANINE
1 2 4 1 2 3 4

G G G G

F F

(T.O.B +3.000)
RB-1 (13X17)
(T.O.B +2.800)
RB-1 (13X17)

B1 (15X30) RB-1 (13X17) RB-1 (13X17)


E E E E
(T.O.B +2.800) (T.O.B +3.000) (T.O.B +3.000)
(T.O.B +2.800)

(T.O.B +2.800)

(T.O.B +3.000)

(T.O.B +3.000)
RB-1 (13X17)

RB-1 (13X17)
B1 (15X30)

B1 (15X30)

B1 (15X30) RB-1 (13X17) RB-1 (13X17)


D D D D
(T.O.B +2.800) (T.O.B +3.000) (T.O.B +3.000)
(T.O.B +2.800)

(T.O.B +2.800)

(T.O.B +3.000)
RB-1 (13X17)
B1 (15X30)

B1 (15X30)

C C

B1 (15X30) RB-1 (13X17)


B B B B
(T.O.B +2.800) (T.O.B +3.000)

A A A A

1 2 4 1 2 3 4
DENAH BALOK BETON (T.O.B +2.800) DENAH RING BALOK RB1 (T.O.B +3.000)
1 2 3 4 1 2 3 4 1 2 3 4

G G G G G G

F F F F F F

RB-1 (13X17) RB-1 (13X17)


E E E E E E
(T.O.B +4.120) (T.O.B +5.000)

BALOK BETON SOPI-SOPI

BALOK BETON SOPI-SOPI


BALOK BETON SOPI-SOPI
RB1 (13X17)
D D D D D D

(T.O.B +5.000)

RB1 (13X17)
RB-1 (13X17)

RB1 (13X17)
(T.O.B +5.000)
RB-1 (13X17)
C C C C C C

RB-1 (13X17)
B B B B B B
(T.O.B +5.000)

A A A A A A

1 2 3 4 1 2 3 4 1 2 3 4
DENAH RING BALOK RB1 (T.O.B +4.120) DENAH RING BALOK RB1 LT. MEZZANINE (T.O.B +5.000) DENAH BALOK BETON SOPI-SOPI
PEMBESIAN PONDASI TAPAK

2 POTONGAN PONDASI TAPAK TENGAH 4 POTONGAN PONDASI TAPAK TEPI


S.6 SKALA 1 : 20 S.6 SKALA 1 : 20

1 DENAH PONDASI TAPAK TENGAH (F1) 3 DENAH PONDASI TAPAK TEPI (F2)
S.6 SKALA 1 : 20 S.6 SKALA 1 : 20
DETAIL PONDASI (P3) DETAIL PONDASI (P4)
DETAIL PONDASI (P1) DETAIL PONDASI (P2) SKALA 1 : 20 SKALA 1 : 20
SKALA 1 : 20 SKALA 1 : 20

DETAIL PONDASI (ROLLAG (RL1)


SKALA 1 : 20
K1 K2 K3 K4
RB1
MARK

B1
2 DETAIL POTONGAN CANOPI TERAS (S2)
S.9 SKALA 1 : 20

3 DETAIL POTONGAN CANOPI JENDELA (S3)


S.9 SKALA 1 : 20

1 DETAIL PLAT BETON LANTAI T=120mm (S1)


S.9 SKALA 1 : 20
4 DETAIL POT. BALOK MEJA DAPUR
S.9 SKALA 1 : 20

5 DETAIL POTONGAN CANOPI JENDELA (S4)


S.9 SKALA 1 : 20

You might also like