Professional Documents
Culture Documents
BMW SEKTOR IV
MANAKIB REALTY
DRAWING FOR ARCHITECTURE QUANTITY SURVEYOR CONSTRUCTION MANAGER GENERAL MANAGER NOTE
F F
E E
D D
C C
B B
A A
1 2 3 4
DENAH PARSIAL LT. DASAR
E E
D D
B B
A A
1 2 4
DENAH PARSIAL LT. MEZZANINE
F F
E E
D D
C C
B B
A A
1 2 3 4
DENAH PARSIAL ATAP
RING BALOK 2 +5.000
1 2 4
4 2 1
TAMPAK BELAKANG
RING BALOK 2 +5.000
A B E F G
G F B A
A B C E F G
POTONGAN A-A
RING BALOK 2 +5.000
G F E D B A
POTONGAN C-C
RING BALOK 2 +5.000
G F E D C B A
POTONGANB-B
RING BALOK 2 +5.000
1 2 3 4
POTONGAN E-E
RING BALOK 2 +5.000
1 2 4
POTONGAN D-D
1 2 3 4
G G
F F
E E
D D
C C
B B
A A
1 2 3 4
G G
E E
D D
B B
A A
1 2 4
TAMPAK POT. A TAMPAK POT. A TAMPAK POT. A TAMPAK POT. A POT. A POT. B POT. A
POT. A POT. B
PINTU BUKA KE DALAM
POTONGAN ATAS POTONGAN ATAS
POTONGAN SAMPING
G G G G
KODE MATERIAL PLAFOND
F F
E E E E
D D D D
C C
B B B B
A A A A
1 2 3 4 1 2 4
DENAH PLAFOND LT. DASAR DENAH PLAFOND LT. MEZZANINE
1 2 3 4 1 2 3 4
G G G G
F F F F
E E E E
D D D D
C C C C
B B B B
A A
A A A A
1 2 3 4 1 2 3 4
DENAH PLAFOND TRITISAN LT. DASAR DENAH PLAFOND TRITISAN LT. MEZZANINE
DETAIL PLAFOND C1 DETAIL PLAFOND C3
1 1
DETAIL PLAFOND C2
DETAIL PLAFOND POTONGAN A
1 2 3 4 1 2 4
G G G G
F F
E E E E
D D D D
C C
1
B B B B
2
A A A A
1 2 3 4 1 2 4
DENAH POLA LANTAI LT. DASAR DENAH POLA LANTAI LT. MEZZANINE
DETAIL POTONGAN - 01 DETAIL POTONGAN - 02 DETAIL POTONGAN - 03
DETAIL POTONGAN - 04
1 2 3 4 1 2 4
G G G G
F F
E E E E
D D D D
C C
B B B B
A A A A
1 2 3 4 1 2 4
DENAH RENCANA LISTRIK LT. DASAR DENAH RENCANA LISTRIK LT. MEZZANINE
1 2 3 4 1 2 3 4
G G G G
F F F F
KETERANGAN :
E E E E
D D D D
C C C C
B B B B
A A A A
1 2 3 4 1 2 3 4
POTONGAN A
DENAH INSTALASI AIR BERSIH DENAH INSTALASI AIR KOTOR
1 2 3 4 1 2 3 4
SL-2 (15X20)
P4
(T.O.B +1.800)
(T.O.B +1.800)
RB-1 (13X17)
RB-1 (13X17)
P4 P4
F F F F
SL-2 (15X20)
P4
SL-2 (15X20)
P1
SL-2 (15X20)
P1
SL-1 (15X25)
P2
P2
SL-2 (15X20) SL-2 (15X20)
D D D D
SL-1 (15X25)
P1
SL-1 (15X25)
P1
P2
SL-2 (15X20)
SL-2 (15X20)
C C C C
P1
P1 P1
SL-2 (15X20)
P4
SL-2 (15X20)
SL-2 (15X20)
P3
P4
A A A A
1 2 3 4 1 2 3 4
DENAH PONDASI,SLOOF DAN KOLOM DENAH BALOK BETON RB1 (T.O.B +1.800)
1 2 3 4 1 2 4
G G G G
F F
(T.O.W +2.200)
BALOK LATAI (130X150)
D D D D
(T.O.W +2.200)
A A A A
1 2 3 4 1 2 4
DENAH BALOK LATAI KUSEN LT. DASAR DENAH BALOK LATAI KUSEN LT. MEZZANINE
1 2 4 1 2 3 4
G G G G
F F
(T.O.B +3.000)
RB-1 (13X17)
(T.O.B +2.800)
RB-1 (13X17)
(T.O.B +2.800)
(T.O.B +3.000)
(T.O.B +3.000)
RB-1 (13X17)
RB-1 (13X17)
B1 (15X30)
B1 (15X30)
(T.O.B +2.800)
(T.O.B +3.000)
RB-1 (13X17)
B1 (15X30)
B1 (15X30)
C C
A A A A
1 2 4 1 2 3 4
DENAH BALOK BETON (T.O.B +2.800) DENAH RING BALOK RB1 (T.O.B +3.000)
1 2 3 4 1 2 3 4 1 2 3 4
G G G G G G
F F F F F F
(T.O.B +5.000)
RB1 (13X17)
RB-1 (13X17)
RB1 (13X17)
(T.O.B +5.000)
RB-1 (13X17)
C C C C C C
RB-1 (13X17)
B B B B B B
(T.O.B +5.000)
A A A A A A
1 2 3 4 1 2 3 4 1 2 3 4
DENAH RING BALOK RB1 (T.O.B +4.120) DENAH RING BALOK RB1 LT. MEZZANINE (T.O.B +5.000) DENAH BALOK BETON SOPI-SOPI
PEMBESIAN PONDASI TAPAK
1 DENAH PONDASI TAPAK TENGAH (F1) 3 DENAH PONDASI TAPAK TEPI (F2)
S.6 SKALA 1 : 20 S.6 SKALA 1 : 20
DETAIL PONDASI (P3) DETAIL PONDASI (P4)
DETAIL PONDASI (P1) DETAIL PONDASI (P2) SKALA 1 : 20 SKALA 1 : 20
SKALA 1 : 20 SKALA 1 : 20
B1
2 DETAIL POTONGAN CANOPI TERAS (S2)
S.9 SKALA 1 : 20