Dec., 2012
No: THIA-12018
(A)
PROPRIETARY STATEMENT
I. INTRODUCTION 1
III. SPECIFICATION 4
1 SHIELD MACHINE 4
2 ELECTRIC SYSTEM 9
3 FOLLOWING CARRIAGE 13
4 FACILITIES ON THE BACK-UP 14
5 BELT CONVEYOR 14
6 SIMULTANEOUSLY GROUTING SYSTEM 15
7 INJECTION SYSTEM 16
8 FIRE FIGHTING SYSTEM: 17
9 GAS MONITOR 17
10 CCTV SYSTEM 17
11 INDUSTRY WATER SYSTEM 17
12 HIGH VALTAGE REEL 17
13 SECONDARY VENTILATION 17
14 GREASE LUBURCATION & SEALING SYSEM 17
15 PAINTING 18
16 INSTALLED POWER 17
17 NOT INCLUDED 17
18 DRAWINGS 20
I. Introduction
1 General condition
2 Geological condition
silty sand, sandy silt with kankar, weathered rock, hard rock.
3 Tunnel alignment
Tunnel
Min. turning radius
length
Vasant Vihar Station – Munirka Horizontal:R252m
1213m
Station Vertical:R2500m
Munirka Station – P.K .Puram Horizontal:R415m
1157m
Station Vertical:R4000m
4 Segment lining
5.3 Frequency: 50 Hz
6.7 Standards of ISO and IEC will be applied as possible. Mitsubishi Standards
will be applied for items those are not covered by above mentioned codes
and standards.
1 Shield machine
1.2 Thrust
1.2.3 Extending speed: 80mm/min (In case all thrust cylinders are operated at
1.2.5 Thrust cylinder speed stroke detector Position: Cylinder No.1, 5,9,13.
① Cutter bits
②Disc cutter
1.3.2.10 17" Single disc cutter : 26 sets
1.3.2.11 17" Twin disc cutter : 8 sets
1.4.5 Torque:
1.5.3 Dimension
protection)
1.8.1 Electric motor for hydraulic power unit and main drive
1.9.3 Angle:
2 Electric system
2.1.1 Shield machine will be equipped with electric motor, lightning, electric
2.1.2 Most of electric parts equipped in the shield machine except operation
shall be carried out in accordance with all related laws and regulations
2.2 Power
30 kW up Star-Delta starting
2.3.1 Power board, operation panel, terminal box, and erector operating box
will be provided.
2.3.2 Place of installation: Each device shall be installed as following, for easy
2.4 Lightning
off)
2.5.5 Frequency: 50 Hz
Q’ty
Indicator
Detector
2.7.1 Function
2.7.2 Accuracy
3.2 Quantity: 7
5 Belt conveyor
6.1 System to double mixing liquid simultaneously from four injection ports
6.3.1.2 Power: 30 kW
6.3.2.2 Power: 3 kW
6.3.4.1 Capacity: 1 m3
After grouting, the cleaning system will work automatically to avoid pipe
blocking.
7 Injection system
7.1.6 Power: 22 kW
equipment.
8 Fire Fighting System:
8.1 Fire fighting system including powder and foam extinguishers at different
Fire extinguishers 6 No
Water curtain 1 No
9.1.1 CO2, O2, CH4 combustible gas, and H2S,SO2 harmful gas monitor.
10.1.1 CCTV for monitor installed in screw gate and belt outlet and other
position.
11.1.3 Capacity:25m
11.1.4 No:2sets
12.1 No:1set
13 Secondary ventilation
13.2 Power:22kW
Pressure: max.14MPa
15 Painting
15.4 Electric and hydraulic devices’ color will be as maker’s standard color.
17 Not included
18 Drawings
See attachments: Φ6570 General Assembly Drawing and Φ6570 Main Machine
Drawing )
( lQ' ty)
B B
c c
STIR B
foE-A
CUTTER HEAD FOR SOIL CUTTER HEAD FOR ROCK ( 3Q' ty)
(!PT!IIt, DISC am I:HIIIlABLE FIR SIFT COOJITIOO
E E
GROUTING INJECTION
MARK *
<4Q' ty)
GROUTING INJECTION<SPARE)
MARK -~< <4Q' ty)
F F
PRELIMINARY
DESCRIPTION
~ gAPPROVED_
H
SECT. AA SECT. BB 8J:.:CHECKED - - - EARTH PRESSURE BALANCED
<==>~DRAWN
~-~~E 1/40 MAIN MACHIENE ASSY
""zw DRAWING NO.
"'
D THI12181
1 2 3 4 5 8 9 J. MHI Mechotronlcs systeiOS, ltd. DRAWN ISSUED
L__________________________________________________________________________________________________________________________________________________:____________ ------------7------------------------------------------------------------------------------------------------------------------------------------------------------__j
~------------------------------------------- ---------------------------------------------~
r 1 2 3 4 5 6 7 8 9 10 11 12 1
A A
cable)
B B
~o.fti\RRlAlir( R>--
12657 7ooo
D-D
c c
=== == === === === === === === === === === === === === === === === === === === === === === === === === ===
No.1 CARRIAGE( L> No.2CARRIAGE( L> No.3 CARRIAGE( L> No.4CARRIAGE ( L> No.5 CARRIAGE ( L> No.6 CARRIAGE ( L> No.7 CARRIAGE ( L>
D
E-E
================================================================================
E ~~!§:!==~~===~====--~=---=--~---~-=~-==-=~~=-==J=Li=·'"m;,,!=J;k=1 S="lct=tc]=)u=y==~'J='lc=fJ=~~=C)·=--==-=-=-=-==---=-==--===--==-= E
PRELIMINARY
DESCRIPTION REMARKS
2250 3000
~~APPROVE De___ __
H
EARTH PRESSURE BALANCED
A-A B-B [-[
i:j:.:CHECKED
~ THI12180 A
~- --~-M-HI-~:c_hQt-ron~c-s_s_yst:~_s_.
2 3 4 5 9