You are on page 1of 9

JOSEFINA VILLAGE LOT MONUMENTING

RTK PREPARATION / SETUP


JANUARY 7-8, 2022
JOSEFINA VILLAGE LOT MONUMENTING

LOT MONUMENTING
JANUARY 8-9, 2022
JOSEFINA VILLAGE LOT MONUMENTING

LOT MONUMENTING
JANUARY 8-9, 2022
JOSEFINA VILLAGE LOT MONUMENTING

NOTES AND REMARKS


JANUARY 8-9, 2022

Lower ground level muddy area (not including the


acacia tree area).

Higher ground level area with coconut and mango


trees.

Trees inside the property (need to to cut down)


JOSEFINA VILLAGE SURVEY FOR LOT STATUS

Boundary Verification
JANUARY 22, 2022
JOSEFINA VILLAGE SURVEY FOR LOT STATUS

Boundary Verification
JANUARY 22, 2022

Existing old cylindrical concrete monuments


JOSEFINA VILLAGE SURVEY FOR LOT STATUS

NOTES AND REMARKS


JANUARY 22, 2022

Last set of cylindrical concrete monument. Delivered


at site.

Existing abandoned concrete house inside the proper-


ty (to be demolished)

Muddy areas (need embankment)

Swampy areas (need embankment)


JOSEFINA VILLAGE SURVEY FOR LOT STATUS

NOTES AND REMARKS


JANUARY 22, 2022

Legend:

Corners/lots with Cylindrical Concrete Monument.


JOSEFINA VILLAGE SURVEY FOR LOT STATUS

NOTES AND REMARKS


JANUARY 22, 2022

Legend:

Lower ground level (swampy area)

Lower ground level (muddy area)

Higher ground level (with existing trees)

NOTES AND REMARKS:

LOWER GROUND LEVEL AREA:


*Embankment needed in accordance
with the site development design.

HIGHER GROUND LEVEL AREA:


*Terrain cut needed in accordance with
the site development design.

DRAINAGE:
*Drainage output will be located at
south ground level perimeter.

EXISTING TREES:
*Trees needed to be cut prior to site
development.

AREA NEAR THE OLD TENANTS:


*The old tenants filed a complain on
their tenancy. (They interrupt the survey/
monumenting and ask for certificates )

CYLINDRICAL CONCRETE MONUMENTS:


*Additional concrete monument needed
to continue monumenting.

TEMPORARY SHED & SEATING:


*Cut downed trees will be used for the
Temporary Facilities.