Professional Documents
Culture Documents
Complete Process For Formaldehyde - 27 - May - 2017 - 17264690717OFHVYQPFRFormeldehydeProject
Complete Process For Formaldehyde - 27 - May - 2017 - 17264690717OFHVYQPFRFormeldehydeProject
FOR
100 MT/day Formaldehyde Plant
By M/s Bansal Chemicals industries
At
Plot no. B-12, Focal Point,
MandiGobindgarh,Dist: Fatehgarh Sahib
Punjab. Pin:147301
APPLICANT
M/s Bansal Chemicals industries
Kothi No. 15,22 Acers scheme,
Barnala, Punjab
Pin :148101
ENVIRONMENT CONSULTANT
VARDAN ENVIRONET
(QCI/NABET ACCREDITED NO. NABET/EIA/1619/RA0037)
D-142, SEC. 57 GURGAON (HARYANA)
E-MAIL: vardanenviro165@gmail.com
CONTACT: 0124-4291036, 09899651342
PRE-FEASIBILITY REPORT
CHAPTER-1: INTRODUCTION
a) Plastic Industry in the manufacture of thermo set compounds like U.F;P.F. & M.F. Moulding
Powders
The basic raw material used in the production of formaldehyde is Methanol. The basic process
used for the manufacture of formaldehyde involves oxidation of methanol in the presence of
Silver which works as catalyst. The chemical reaction involve is as follows:
Bansal Chemicals industries is a partnership firm with duly executed partnership deed dated
10.05.2017.The partners of the unit have proposed to set up a Formaldehyde continuous
Process Plant with a installed capacity of 100 MT per day at Focal Point,MandiGobindgarh.
The partners areengaged in plywood business since last 35 years. Satpal Bansal and his son
Bhupinder Bansal are running two industries by name Durga plywood industries situated in
Barnala city and other one is Shiv Shakti Plywood industries situated in Balachaur in Punjab
Indian manufacturing company is a leading Manufacturer & Supplier of Plywood board .
1.2 Need of the Project
Bansal Chemicals Industries have planned to set up an agro wood based project for
manufacturing Particle Board and MDF boards with value added products Management shall
take all necessary clearances related to environment & pollution control including
Environmental Clearance. The manufacturing of Particle board and MDF board requires
glue/adhesive /binder for binding the particles / fibres of wood. The major raw material for
manufacturing glue /binder/adhesive for particle board requires major quantity
of formaldehyde. Further for the quality production of final product particle board and MDF
board the quality of the formaldehyde used for glue/adhesive/binder should be as per the
standards. To achieve the quality production and the uninterrupted supply of the
formaldehyde, the company has proposed to develop their own formaldehyde unit all utilities
and storage within the main unit.
The proposed plant is to be installed at at Plot no. B-12, Focal Point, MandiGobindgarh, Dist:
Fatehgarh Sahib, Punjab on a land measuring 0.418 Ha.
A fixed quantity of methanol and water is introduced in to a mixing vessel from where this
mixture is taken into an evaporator. Air is also introduced into the evaporator. A temperature
of 70o C is maintained which facilitates the evaporation of methanol. The air and methanol
vapour mixture is then further heated to 100 deg in the superheater and then introduced into
the reactor where in presence of silver catalyst maintained at temperature of 650 o C .The
oxidation/Dehydrogenation reaction takes place as per the following chemistry:
3.1.1 ABSORPTION
The Reaction is net Exothermic. In the Reaction 3 itself which is also a waste heat boiler the
temperature of the product gasses is brought down to 180 oCand then further to cooled to
about 95oCin the Reboiler. This is achieved by circulating the Solution in the Evaporator in the
Reboiler which cools down the Product gasses to about 95 oCand itself is heated up to 70 o
Cthus saving on energy.. The product gasses are further cooled to about 75 oCin the condenser
by circulation of cooling water from the cooling tower. Pre-Feasibility Report for Proposed
Formaldehyde Manufacturing Unit at Plot no. B-12, Focal Point, MandiGobindgarh, Dist:
Fatehgarh Sahib, Punjab by M/s Bansal Chemicals Limited .The reaction gas containing
Formaldehyde, unreacted Methanol and water vapour is then directed to Absorption column I
and escaping Formaldehyde gases are absorbed by circulating and cooling the Formaldehyde
solution in Plate Heat Exchanger from the absorber sump. The part of the circulation is taken
out as product.
Mostly the absorber is packed with pall rings. If proper packing size and cooling is maintained
more than 95% absorption is completed in the absorption column - I.
The unabsorbed gas from the absorption column - 1 is absorbed in the absorption column - II
and subsequently in Column III by circulating and cooling absorber sump dilute Formaldehyde
solution in Plate Heat Exchanger. Finally, the gas is washed with pure Chilled DM water at the
upper part of the column - III, provided with bubble cap trays, and then exhausted as tail gas to
the atmosphere.
The Exhaust gasses contain only Nitrogen, Hydrogen, Carbon dioxide, Carbon Monoxide and
traces of Formaldehyde and Methanol.
Table1: The plant and machinery being proposed to be used in the complex is given below:
pH : 3.5-4.0
1. Methanol 460
2. Water(D.M water) 500
3. Air 900
DM water
pH : 7.5 -8.0
Air
Temperature :40-45 o C
The main raw material methanol will be sourced from near by market
Mode of Transport: All the raw materials and products will be transported via road transport.
Approx 75 KLD of Ground Water by tubewell and the rest will be sourced from PSIEC. Process
water is 100 % reused within the process. The complex is zero discharge complex from process.
Consumption & discharge is given below:
Total Water
Requirement
(75 KLD)
Horticulture/Green
Belt
1.2 KLD
Wastewater Proccess
generated
50 KLD Wastewater
generated
5 KLD
1 KLD
Wastewater
generated
Wastewater 2 KLD
generated
10 KLD
Total Wastewater
generated
18 KLD
@90% Hence Zero Liquid
discharge is Achieved
Recycled/Treated water
(16.2 KLD
LIQUID WASTE
Proposed unit shall be a zero discharge unit
It is estimated that from 10 persons around 12 Kg/day of MSW (garbage) shall be generated.
The closed color coded bins for biodegradable & non-biodegradable waste shall be placed in
each section. The waste from these bins will be collect in main bin at the complex. The
biodegradable waste bin shall be sent to approved solid waste management site. The waste
from non-biodegradable waste bin shall be given to recycler for recycling.
Table 3: The solid waste categories and disposal method is given below:
Total Power Requirement of the plant is 160 KWA which will be sourced from Punjab state
power corporation limited.
Particulars
The plant installed is a continuous, automatic plant so labour requirement will be very less.
Overall there will be an employment of 10 manpower which will include the following:
S.No Manpower No
1 Plant Manager 1
2 Purchase office 1
3 Formaldehyde plant operator 2
4 Store keeper 1
5 Labour 2
6 Water treatment plant operator(Equalization 2
tank ,MBBR, Extended Aeration and settling
tank units)
Total manpower 9
Chapter 4
SITE ANALYSIS
The new project is proposed in industrial area and the land is under agreement.
Infrastrure is available for water supply, backup power supply, lab, drinking water ,rest room,
toilets, medial units No additional facilities required.
4.4 Topography
The topography of the district is even. It is mostly a plain of alluvial type. It also has loam to
heavy loam and sand to sandy loam soils in certain parts of the district. Soil is rich in nutrients
and suitable for crops like wheat, Paddy, Oil seeds, Sugar Cane, Potato and vegetables etc.
The district is poor as regards mineral wealth. A few minor minerals are, however, found in the
district like Ordinary Earth and Brick Earth . There is no sand , gravels and other minor minerals
found in this district. Sand and gravel
4.6 Groundwater.
Water bearing formations in the area mainly include fine to medium grained sand or sand with
little admixture of clay. At shallow depth the ground water occurs under unconfined water
table conditions and in deeper aquifers occurs under confined conditions. The depth to ground
water table in the area ranges from 4.05 m below ground level (mbgl) in the central to 18.10
mbgl in the north eastern parts. The quality of ground water in shallow aquifers confirm to
maximum permissible limits for drinking water standards except along western part where high
values of fluoride (1.5 to 2.10 ppm) have been noticed and in central Fatehgarh Sahib showing
high values of sodium, zinc, iron, sulphate, nitrate and chloride. The deeper waters in general
are found to be suitable for irrigation and domestic purposes.
In Distt.Fatehgarh Sahib, the climate is warm and temperate. The summers are much rainier
than the winters. The average annual temperature in Fatehgarh Sahib is 24.03°C. Precipitation
here averages 770 mm. With an average temperature of 33.6°C, June is the warmest month.
The lowest average temperature in the year occur in January, when it is around 13.3°C. The
precipitation varies 252 mm between the driest month and the wettest month. The variation in
temperatures throughout the year is 20.3°C.
Chapter 5 : PLANNING BRIEF
Planning concept (type of Industries, facilities, transportation etc) Town and country
planning/Development authority classification Specification of Utilities
Type of Industry
As per EIA Notification dated 14.09.2006 and as amended from time to time, the project falls in
Cat. ‘B’,S.No.5(f) Synthetic organic chemicals industry (dyes & dye intermediates) as the project
site is located in notified industrial area.
PROPOSED INFRASTRUCTURE
List of Plant & Machinery
1. Air washer
6. Vapour Filter
7. Seperator-I
Seperator-II
Seperator-III
6 PROJECT BENEFITS
The formaldehyde produced will be used as a binder/glue in agro wood based
project set up Bansal chemical Industries for manufacturing Particle Board and MDF
boards at Punjab.
Formaldehyde also finds its uses in other industries like plastic industry,
Pharmaceutical Industry, explosive industry, rubber industry etc.
The plant as designed by us is pollution free since there is no water discharge. So it’s
an eco friendly project
The Formaldehyde market has been growing steadily and an efficient plant is bound
to be a success.