Field Notes Station # (m) Elevation (m)
Starting Point (Previous Survey) 0 0.00 817.05
1 28.93 817.41
2 42.55 817.66
FLOODline (Right Bank) 3 47.40 817.66
4 53.68 816.99
5 61.30 816.01
6 64.77 815.95
7 73.91 815.00
8 80.31 814.64
9 89.46 814.46
10 99.52 814.43
11 109.58 814.76
12 114.15 815.95
13 115.03 815.98
14 117.35 817.11
FLOODline point (Left Bank) 15 118.20 817.66
16 118.29 817.72
17 130.06 818.17
18 133.78 818.11
19 171.39 817.53
20 204.98 817.11
Ending point 21 242.47 817.63
Distance
Field Notes Station # (m) Elevation (m)
Starting Point 0 0 816.80304
FLOODline (Right Bank) 1 27.37104 817.1688
2 38.74008 816.4068
3 41.66616 816.102
4 42.18432 815.76672
5 42.91584 815.70576
6 47.48784 815.06568
7 56.63184 814.85232
8 65.77584 814.51704
9 77.66304 814.66944
10 88.63584 814.79136
11 95.95104 814.94376
12 101.43744 815.70576
13 102.47376 815.7972
14 103.84536 816.7116
FLOODline (Left Bank) 15 104.42 817.1688
16 105.33888 817.4736
17 110.12424 818.11368
18 112.9284 818.44896
19 121.58472 818.81472
Ending Point 19 139.26312 817.22976
CABEZOTES DE ALCANTARILLAS
CONCRETO DE 3000 PSI VALOR UNITARIO CANTIDAD TOTALES
818.50
817.50
0.00 816.50
Elevation (m)
0.67 815.50
1.65
814.50
1.71
2.65 813.50
3.02 812.50
3.20
811.50
3.23 0.00 50.00 100.00 150.0
2.90 Distance (m)
1.71
1.68 Table 3:
0.55 Manning's Calculations
0.00 Average Bankfull Elevation (m)
P: Total Wetted Perimeter (m)
A: Total Cross Sectional Area (m2)
S: Channel Slope (m/m)
R: Hydraulic Radius (m)
C: Constant
n: Manning's Roughness Coefficient
Q: Discharge (m3/s)
Q: Discharge (cfs)
Bankfull Cross
Water Depth Sectional 52.11 River cross section
(m) Wetted Perimeter (m) Area (m2) 820.0
819.5
819.0
818.5
818.0
817.5
817.0
Elevation (m)
816.5
816.0
815.5
815.0
814.5
814.0
813.5
813.0
812.5
812.0
818.0
817.5
817.0
Elevation (m)
816.5
816.0
815.5
815.0
814.5
814.0
813.5
813.0
812.5
812.0
811.5
0 50 100 150
Distance (m)
Table 4
Manning's Calculations (DOWNStream Cross-section)
Average Bankfull Elevation (m)
P: Total Wetted Perimeter (m)
A: Total Cross Sectional Area (m2)
S: Channel Slope (m/m)
R: Hydraulic Radius (m)
C: Constant
n: Manning's Roughness Coefficient
Q: Discharge (m3/s)
Q: Discharge (cfs)
Figure 1: 52.26 River Cross Section
Calculations
WNStream Cross-section)
Channel Slope Calculations
Respuesta a pregunta b:
Respuesta a pregunta c: