Professional Documents
Culture Documents
1500.00
14 1994.32 34 1778.51 14
15 2088.48 35 1729.52 15
1000.00
16 2182.78 36 1683.25 16
17 2235.94 37 1637.63 500.00 17
18 2268.07 38 1592.36 18
19 2282.55 39 1549.39 0.00 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 3+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
14 1933.16 34 1829.79 1500 14
15 2004.95 35 1781.12 15
1000
16 2090.25 36 1733.62 16
17 2164.12 37 1687.36 17
500
18 2217.70 38 1641.69 18
19 2251.98 39 1597.51 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 5+000
5+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
14 1927.79 34 1834.28 1500 14
15 1998.00 35 1785.64 15
1000
16 2082.24 36 1738.05 16
17 2157.83 37 1691.73 17
500
18 2213.26 38 1646.04 18
19 2249.27 39 1601.70 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 6+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Date Created : 25/01/2019 Hydrograph by HEC-RAS Date Created
Starting Flow Time : 0 h 52 m Starting Flow Time
Discharge (m3/s)
14 1924.26 34 1837.22 1500 14
15 1993.43 35 1788.58 15
1000
16 2076.98 36 1740.11 16
17 2153.63 37 1693.75 17
500
18 2210.26 38 1648.80 18
19 2247.43 39 1604.41 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 7+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Date Created : 25/01/2019 Hydrograph by HEC-RAS Date Created
Starting Flow Time : 0 h 52 m Starting Flow Time
Discharge (m3/s)
1500
14 1921.35 34 1839.66 14
15 1989.72 35 1791.05 1000
15
16 2072.75 36 1743.30 16
17 2150.26 37 1696.90 500 17
18 2207.89 38 1651.18 18
19 2245.97 39 1606.74 0 19
0 10 20 30 40 50
Note: Time (hours) Note:
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 8+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
14 1918.8693 34 1841.7361 1500 14
15 1986.5576 35 1793.1447 15
16 2069.1338 36 1745.3401 1000 16
17 2147.3557 37 1698.9182 17
500
18 2205.8308 38 1653.2035 18
19 2244.7014 39 1608.7253 19
0
Note: 0 10 20 30 40 50 Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 9+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
14 1918.869 34 1841.736 1500 14
15 1986.558 35 1793.145 15
1000
16 2069.134 36 1745.34 16
17 2147.356 37 1698.918 17
500
18 2205.831 38 1653.204 18
19 2244.701 39 1608.725 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 10+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
14 1912.961 34 1846.624 1500 14
15 1979.08 35 1798.071 15
1000
16 2060.507 36 1750.145 16
17 2140.202 37 1703.602 17
500
18 2200.626 38 1657.832 18
19 2241.449 39 1613.264 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 11+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
14 1911.015 34 1848.25 1500 14
15 1976.626 35 1799.721 15
1000
16 2057.699 36 1751.755 16
17 2137.911 37 1705.188 500
17
18 2198.969 38 1659.417 18
19 2240.418 39 1614.825 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 12+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
10 1588.929 30 2042.331 50 1210.341 10
FLOW HYDROGRAPH
11 1691.448 31 1995.579 51 1181.47 2500 11
12 1777.518 32 1947.023 52 1153.934 12
2000
13 1848.44 33 1898.303 13
14 1909.214 34 1849.737 1500
14
15 1974.37 35 1801.224 15
16 2055.143 36 1753.228 1000 16
17 2135.817 37 1706.639 17
500
18 2197.453 38 1660.855 18
19 2239.474 39 1616.254 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 13+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
1500
15 1972.721 35 1802.256 15
16 2053.41 36 1754.241 1000 16
17 2134.364 37 1707.627 17
500
18 2196.405 38 1661.836 18
19 2238.815 39 1617.227 0
19
Note: 0 10 20 30 40 50 Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
700 M TO DOWNSTREAM POSO-
BASED ON HEC-RAS 5.0.6 ANALYSIS 14+000 1
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
14 2309.269 34 1742.183 2000 14
15 1638.815 35 1564.659 15
1500
16 2407.786 36 2447.742 16
1000
17 1769.779 37 1405.891 17
18 1897.911 38 1467.545 500 18
19 3091.043 39 2238.013 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 15+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
4000
14 1169.651 34 3245.259 14
15 3256.038 35 1500.814 3000 15
16 432.973 36 361.863 2000 16
17 4718.786 37 3500.414 17
1000
18 1129.175 38 1512.626 18
19 506.4 39 355.595 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 16+000 DAM POSO 1 + 2.5 KM
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
2000
14 1667.521 34 1747.55 14
15 2164.566 35 1997.576 1500 15
16 1889.061 36 1621.044 1000 16
17 2217.964 37 1668.422 17
500
18 2340.783 38 1841.298 18
19 1914.671 39 1520.341 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 17+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
2000
14 2025.501 34 1830.701 14
15 1808.485 35 1882.626 1500 15
16 2053.702 36 1378.913 1000 16
17 2235.133 37 1898.132 17
500
18 2125.127 38 1816.738 18
19 1965.799 39 1652.892 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 18+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
4000
14 1900.083 34 72.9 14
15 2319.333 35 2713.817 3000 15
16 1716.771 36 64.74 2000 16
17 1788.566 37 1030.367 17
1000
18 5072.085 38 564.961 18
19 5368.125 39 2831.674 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 19+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
14 802.218 34 1993.963 3000 14
15 2481.342 35 1546.086 2500 15
2000
16 1604.082 36 573.907 16
1500
17 2731.527 37 1617.747 17
1000
18 691.412 38 1552.861 500 18
19 398.621 39 1271.029 0 19
0 10 20 30 40 50
Note: Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is pro
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RA
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RA
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 20+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
8000
1031.448 34 2127.14 14
6000
2135.058 35 1186.063 15
1062.447 36 1210.19 4000 16
1523.037 37 2952.056 17
2000
2265.802 38 2539.531 18
1193.413 39 1658.922 0 19
0 10 20 30 40 50
Time (hours)
Note:
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 29+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
2000
1956.273 34 2963.952 14
1364.546 35 2264.955 1500 15
1523.121 36 1356.052 1000 16
1730.711 37 1088.343 17
500
2539.781 38 1076.583 18
0
2127.556 39 1828.831 0 10 20 30 40 50 19
Time (hours) Note:
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 30+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
5000
767.104 34 389.302 14
4000
294.864 35 1302.481 15
3000
298.22 36 388.85 16
2000
315.642 37 331.038 17
1000
6586.523 38 3372.234 18
4464.643 39 657.355 0 19
0 10 20 30 40 50
Time (hours) Note:
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
31+000
BASED ON HEC-RAS 5.0.6 ANALYSIS 31+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
5000
4319.323 34 1687.568 14
4000
3150.63 35 514.151 15
3000
2094.657 36 1128.443 16
2000
1759.783 37 3373.98 17
1000
6399.763 38 1565.783 18
0
1188.567 39 4456.02 0 10 20 30 40 50 19
Time (hours) Note:
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 32+000
32+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
4832.02 34 4003.714 4000 14
1031.89 35 846.336 15
3000
492.456 36 118.995 16
2000
151.377 37 130.15 17
1877.631 38 1016.444 1000 18
169.092 39 23.457 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 35+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
5000
137.267 34 609.61 14
7236.162 35 1585.963 4000 15
7546.568 36 203.337 3000 16
303.228 37 169.541 2000 17
5537.362 38 821.133 1000 18
465.461 39 160.191 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 36+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
6000
438.821 34 444.391 5000
14
1828.13 35 2031.528 4000
15
1733.705 36 585.899 3000 16
1095.043 37 521.708 2000 17
413.978 38 1897.194 1000 18
1143.034 39 474.714 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 37+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
4000
848.146 34 743.8 14
2496.538 35 2987.306 3000 15
2530.456 36 1039.051 2000 16
2002.64 37 978.489 17
1000
1368.151 38 2192.389 18
2017.003 39 887.219 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 38+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
3000
1418.934 34 1189.627 2500
14
1352.805 35 2223.068 2000
15
1494.583 36 1566.819 1500 16
2490.075 37 1553.878 1000 17
1299.71 38 1613.719 500 18
2959.737 39 1412.064 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 39+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
4000
1640.075 34 1374.378 14
1375.164 35 1832.039 3000 15
1527.132 36 1741.146 2000 16
2477.738 37 1754.583 17
1000
1460.045 38 1507.962 18
3130.487 39 1599.244 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 40+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
1905.486 34 1640.274 2000 14
1626.359 35 1675.42 15
1500
1779.889 36 1859.998 16
1000
2118.509 37 1930.472 17
1772.236 38 1622.963 500 18
2809.917 39 1757.748 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 41+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
1995.359 34 1759.162 2000 14
1749.511 35 1697.605 15
1500
1896.867 36 1873.828 16
1000
1941.024 37 1965.978 17
1912.185 38 1709.588 500 18
1912.185 39 1788.971 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 42+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
2500
2015.385 34 1865.104 14
1847.248 35 1781.722 2000 15
1983.672 36 1846.679 1500 16
1826.158 37 1934.015 1000 17
2037.048 38 1791.052 500 18
2314.257 39 1765.874 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 43+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
3000
1970.433 34 1916.465 2500
14
1877.264 35 1847.015 2000
15
2005.068 36 1815.018 1500 16
1809.54 37 1874.136 1000 17
2097.982 38 1819.513 500 18
2189.298 39 1723.78 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 44+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
3000
1938.287 34 1933.56 2500
14
1881.271 35 1873.192 2000
15
2003.953 36 1800.746 1500 16
1814.045 37 1842.914 1000 17
2117.484 38 1824.146 500 18
2155.439 39 1702.118 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 45+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
1897.478 34 1944.784 3000 14
1876.467 35 1893.629 2500 15
2000
1991.247 36 1788.624 16
1500
1826.995 37 1812.126 17
1000
2129.983 38 1820.749 500 18
2142.827 39 1681.787 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 46+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
4000
1847.791 34 1946.36 14
1860.531 35 1899.002 3000 15
1960.455 36 1782.758 2000 16
1850.399 37 1787.937 17
1000
2134.305 38 1801.797 18
2153.84 39 1669.728 0 19
0 10 20 30 40 50
Note:
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6 • Discharge data above is proc
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF • Hydrology data for HEC-RAS
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY • Geometry data for HEC-RAS
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 47+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
20 2190.836 40 1667.75
21 2219.252 41 1631.245
22 2274.231 42 1581.744
23 2225.505 43 1536.649
24 2296.317 44 1523.407
25 2343.619 45 1442.461
26 2228.983 46 1458.107
55.702 27 2301.792 47 1396.468
1776.215 28 2163.187 48 1375.163 Simplified Hydrograph (per Hour)
1439.506 29 2185.075 49 1307.988
1398.662 30 2145.285 50 1300.034 FLOW HYDROGRAPH
2500
1459.029 31 2086.898 51 1269.374
1552.234 32 2030.005 52 1237.788 2000
1691.781 33 2031.86 Discharge (m3/s)
1720.241 34 1954.935 1500
1849.055 35 1898.386
1000
1874.109 36 1909.955
1995.397 37 1784.543 500
2026.73 38 1778.362
2103.428 39 1740.283 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 56+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2184.374 40 1672.053
0 21 2214.558 41 1631.644
0 22 2269.66 42 1583.044
0 23 2219.923 43 1540.733
0 24 2294.334 44 1527.513
0 25 2346.097 45 1444.229
0 26 2238.875 46 1458.231
0 27 2296.167 47 1399.051
1834.595 28 2167.362 48 1374.144 Simplified Hydrograph (per Hour)
1447.784 29 2186.578 49 1312.088
1400.838 30 2146.965 50 1298.577 FLOW HYDROGRAPH
2500
1456.521 31 2084.932 51 1270.71
1545.78 32 2032.279 52 1240.148 2000
1685.363 33 2034.19
Discharge (m3/s)
1842.895 35 1900.085
1000
1873.808 36 1911.086
1989.675 37 1787.665 500
2016.161 38 1781.431
2105.524 39 1742.898 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 57+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(m /s)
3 (Hour) (m /s)
3 (Hour) (m 3/s)
0 20 2175.391 40 1678.627
0 21 2208.851 41 1633.09
0 22 2263.626 42 1585.778
0 23 2212.464 43 1546.819
0 24 2289.46 44 1532.148
0 25 2347.738 45 1447.753
0 26 2253.539 46 1458.296
0 27 2286.13 47 1402.774
1931.64 28 2174.879 48 1373.266 Simplified Hydrograph (per Hour)
1461.876 29 2189.127 49 1318.446
1404.009 30 2149.96 50 1296.925 FLOW HYDROGRAPH
2500
1451.69 31 2082.968 51 1273.163
1536.885 32 2037.114 52 1243.621 2000
1674.704 33 2037.415
Discharge (m3/s)
1714.202 34 1962.185 1500
1832.795 35 1903.461
1000
1871.991 36 1911.356
1978.376 37 1793.788 500
2000.718 38 1785.381
2107.504 39 1746.612 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
58+000
BASED ON HEC-RAS 5.0.6 ANALYSIS 58+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(m /s)
3 (Hour) (m /s)
3 (Hour) (m 3/s)
0 20 2126.083 40 1686.542
0 21 2158.036 41 1634.943
0 22 2203.02 42 1590.531
0 23 2155.704 43 1556.84
0 24 2223.275 44 1538.735
0 25 2279.131 45 1454.593
0 26 2214.335 46 1458.435
0 27 2212.814 47 1409.049
2066.508 28 2139.784 48 1372.565 Simplified Hydrograph (per Hour)
1486.518 29 2146.695 49 1329.322
1409.028 30 2113.708 50 1294.8 FLOW HYDROGRAPH
2500
1442.46 31 2049.482 51 1277.702
1522.215 32 2018.042 52 1249.428 2000
1655.144 33 2015.922
Discharge (m3/s)
1706.183 34 1950.278 1500
1809.839 35 1893.982
1000
1858.646 36 1896.46
1945.417 37 1795.399 500
1962.078 38 1783.519
2079.666 39 1746.967 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 59+000
59+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(m /s)
3 (Hour) (m /s)
3 (Hour) (m 3/s)
0 20 2158.597 40 1693.563
0 21 2199.217 41 1638.112
0 22 2252.904 42 1593.464
0 23 2200.572 43 1560.567
0 24 2277.006 44 1540.846
0 25 2346.664 45 1457.527
0 26 2280.226 46 1458.741
0 27 2265.39 47 1411.372
2141.864 28 2191.127 48 1372.967 Simplified Hydrograph (per Hour)
1493.509 29 2194.785 49 1332.785
1410.208 30 2156.939 50 1294.718 FLOW HYDROGRAPH
2500
1438.946 31 2081.851 51 1279.133
1517.145 32 2048.713 52 1251.067 2000
1649.025 33 2043.668
Discharge (m3/s)
1705.792 34 1973.26 1500
1809.429 35 1942.443
1000
1865.548 36 1910.693
1953.519 37 1808.398 500
1972.671 38 1792.882
2107.586 39 1754.698 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 60+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Date Created : 25/01/2019 Hydrograph by HEC-RAS
Starting Flow Time : 7h 30m
Q Time Q Time Q
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2149.859 40 1700.597
0 21 2193.915 41 1643.366
0 22 2247.425 42 1599.211
0 23 2200.264 43 1566.576
0 24 2270.507 44 1544.236
0 25 2340.242 45 1464.123
0 26 2285.067 46 1460.788
0 27 2260.833 47 1415.947
2185.195 28 2198.273 48 1376.125 Simplified Hydrograph (per Hour)
1486.08 29 2197.791 49 1338.809
1408.37 30 2161.254 50 1297.577 FLOW HYDROGRAPH
2500
1432.774 31 2086.629 51 1282.737
1508.477 32 2055.385 52 1254.801 2000
1634.265 33 2047.153
Discharge (m3/s)
1698.34 34 1980.155 1500
1797.066 35 1918.602
1000
1857.728 36 1912.089
1940.319 37 1817.886 500
1963.403 38 1797.35
2099.17 39 1759.437 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 61+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Date Created : 25/01/2019 Hydrograph by HEC-RAS
Starting Flow Time : 7h 34 m
Q Time Q Time Q
(m /s)
3 (Hour) (m /s)
3 (Hour) (m 3/s)
0 20 2143.008 40 1706.256
0 21 2189.691 41 1647.867
0 22 2243.085 42 1604.074
0 23 2200.403 43 1571.503
0 24 2265.546 44 1547.02
0 25 2334.925 45 1469.782
0 26 2288.146 46 1462.614
0 27 2257.861 47 1419.835
2240.865 28 2203.676 48 1378.96 Simplified Hydrograph (per Hour)
1479.289 29 2200.11 49 1343.866
1406.675 30 2164.642 50 1300.16 FLOW HYDROGRAPH
2500
1427.584 31 2090.751 51 1285.825
1501.352 32 2060.529 52 1258.081 2000
1623.478 33 2049.887
Discharge (m3/s)
1691.983 34 1985.574 1500
1786.923 35 1924.136
1000
1851.288 36 1913.363
1930.022 37 1825.292 500
1956.466 38 1800.896
2092.058 39 1763.25 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 62+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(m /s)
3 (Hour) (m /s)
3 (Hour) (m 3/s)
0 20 2121.921 40 1722.986
0 21 2175.612 41 1663.91
0 22 2229.481 42 1620.559
0 23 2203.638 43 1586.325
0 24 2252.366 44 1556.261
0 25 2317.041 45 1489.347
0 26 2291.724 46 1470.759
0 27 2254.219 47 1433.233
2213.565 28 2217.936 48 1391.595 Simplified Hydrograph (per Hour)
1414.02 29 2206.554 49 1359.61
1393.905 30 2174.507 50 1313.463 FLOW HYDROGRAPH
2500
1410.736 31 2106.03 51 1296.746
1478.018 32 2075.721 52 1268.929 2000
1588.567 33 2058.207
Discharge (m3/s)
1667.74 34 2001.503 1500
1755.086 35 1941.43
1000
1828.452 36 1919.375
1900.866 37 1846.909 500
1939.341 38 1812.387
2065.767 39 1775.113 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 63+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
1655.51 34 2009.455 1500
1739.824 35 1950.202
1000
1817.009 36 1922.773
1886.934 37 1857.463 500
1930.992 38 1818.216
2050.488 39 1780.971 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 64+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Discharge (m3/s)
1634.019 34 2022.053 1500
1714.604 35 1964.545
1000
1797.275 36 1929.017
1864.461 37 1874.437 500
1917.903 38 1828.112
2027.004 39 1790.727 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 65+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2083.318 40 1750.539
0 21 2146.748 41 1692.839
0 22 2205.185 42 1649.012
0 23 2210.363 43 1610.599
0 24 2232.903 44 1573.036
0 25 2285.638 45 1522.509
0 26 2292.55 46 1486.564
0 27 2254.083 47 1455.51
1382.66 28 2239.826 48 1414.163 Simplified Hydrograph (per Hour)
1246.101 29 2216.666 49 1383.387
1365.466 30 2190.271 50 1336.43 FLOW HYDROGRAPH
2500
1384.469 31 2133.724 51 1313.377
1440.386 32 2100.447 52 1285.743 2000
1530.587 33 2072.42
Discharge (m3/s)
1622.566 34 2028.271 1500
1701.878 35 1971.828
1000
1786.866 36 1932.618
1853.428 37 1882.798 500
1911.547 38 1833.357
2014.662 39 1795.745 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 66+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2078.253 40 1754.16
0 21 2143.18 41 1696.922
0 22 2201.866 42 1652.897
0 23 2211.233 43 1613.815
0 24 2230.733 44 1575.466
0 25 2281.656 45 1526.948
0 26 2292.229 46 1488.934
0 27 2254.669 47 1458.517
5.332 28 2242.357 48 1417.396 Simplified Hydrograph (per Hour)
1223.758 29 2217.882 49 1386.502
FLOW HYDROGRAPH
1360.375 30 2192.194 50 1339.915 2500
1381.121 31 2137.462 51 1315.728
1435.471 32 2103.538 52 1288.15 2000
1522.921 33 2074.264
Discharge (m3/s)
1500
1616.052 34 2031.675
1694.757 35 1975.859
1000
1780.977 36 1934.693
1847.337 37 1887.396 500
1908.022 38 1836.324
2007.76 39 1798.557 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 67+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2067.177 40 1761.795
0 21 2135.219 41 1705.716
0 22 2194.471 42 1660.926
0 23 2212.947 43 1620.387
0 24 2226.474 44 1580.773
0 25 2273.201 45 1536.107
0 26 2291.151 46 1494.298
0 27 2256.56 47 1464.792
0 28 2247.477 48 1424.402 Simplified Hydrograph (per Hour)
1248.622 29 2220.415 49 1392.842
1346.711 30 2196.18 50 1347.61 FLOW HYDROGRAPH
2500
1374.164 31 2145.574 51 1320.682
1425.226 32 2109.972 52 1293.247 2000
1506.95 33 2078.189
Discharge (m3/s)
1601.875 34 2038.795 1500
1680.107 35 1984.471
1000
1768.02 36 1939.553
1834.596 37 1896.96 500
1900.44 38 1842.92
1992.617 39 1804.647 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 68+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2058.068 40 1767.838
0 21 2128.61 41 1712.591
0 22 2188.339 42 1667.166
0 23 2214.253 43 1625.496
0 24 2223.143 44 1584.999
0 25 2266.362 45 1543.242
0 26 2290.148 46 1498.611
0 27 2258.317 47 1469.703
0 28 2251.536 48 1429.952 Simplified Hydrograph (per Hour)
1322.391 29 2222.464 49 1397.781
1335.079 30 2199.387 50 1353.749 FLOW HYDROGRAPH
2500
1368.692 31 2152.212 51 1324.596
1417.198 32 2115.162 52 1297.277 2000
1494.474 33 2081.39
Discharge (m3/s)
1590.629 34 2044.549 1500
1668.741 35 1991.487
1000
1757.833 36 1943.646
1824.472 37 1904.609 500
1894.29 38 1848.309
1980.204 39 1809.557 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 69+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2053.133 40 1770.92
0 21 2124.839 41 1716.304
0 22 2184.765 42 1670.48
0 23 2214.685 43 1628.208
0 24 2221.49 44 1587.328
0 25 2262.609 45 1546.891
0 26 2289.338 46 1500.968
0 27 2259.554 47 1472.182
0 28 2253.568 48 1432.767 Simplified Hydrograph (per Hour)
1494.398 29 2223.608 49 1400.182
1328.498 30 2201.109 50 1356.777 FLOW HYDROGRAPH
2500
1366.003 31 2155.871 51 1326.468
1413.282 32 2117.894 52 1299.169 2000
1488.193 33 2083.123
Discharge (m3/s)
1584.58 34 2047.524 1500
1662.761 35 1995.16
1000
1752.364 36 1945.981
1819.407 37 1908.436 500
1890.965 38 1851.219
1973.685 39 1812.107 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 70+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2047.914 40 1773.921
0 21 2120.602 41 1719.735
0 22 2180.856 42 1673.049
0 23 2214.403 43 1630.268
0 24 2220.263 44 1589.211
0 25 2259.288 45 1549.439
0 26 2288.404 46 1502.899
0 27 2261.304 47 1473.928
0 28 2255.19 48 1434.858 Simplified Hydrograph (per Hour)
1141.09 29 2224.851 49 1401.908
1321.309 30 2202.727 50 1359.071 FLOW HYDROGRAPH
2500
1363.882 31 2159.459 51 1327.907
1410.479 32 2120.486 52 1300.61 2000
1483.808 33 2084.953
Discharge (m3/s)
1579.931 34 2050.373 1500
1658.456 35 1998.828
1000
1747.525 36 1948.708
1814.289 37 1911.9 500
1887.323 38 1854.337
1967.179 39 1814.746 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 71+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2039.716 40 1778.755
0 21 2113.741 41 1726.034
0 22 2174.583 42 1678.398
0 23 2213.26 43 1634.892
0 24 2218.74 44 1593.734
0 25 2254.583 45 1555.139
0 26 2286.815 46 1507.791
0 27 2264.323 47 1477.988
0 28 2257.261 48 1439.94 Simplified Hydrograph (per Hour)
0 29 2226.849 49 1406.044
1299.229 30 2205.105 50 1364.709 FLOW HYDROGRAPH
2500
1358.258 31 2164.822 51 1331.478
1403.773 32 2124.29 52 1304.12 2000
1473.509 33 2087.825
Discharge (m3/s)
1568.674 34 2054.558 1500
1648.762 35 2004.438
1000
1737.895 36 1953.339
1806.626 37 1917.077 500
1880.848 38 1859.774
1957.021 39 1819.062 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 72+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2029.865 40 1784.306
0 21 2105.374 41 1733.239
0 22 2166.889 42 1684.437
0 23 2211.692 43 1640.094
0 24 2216.946 44 1598.825
0 25 2248.846 45 1561.366
0 26 2284.789 46 1513.173
0 27 2268.152 47 1482.231
0 28 2259.736 48 1445.125 Simplified Hydrograph (per Hour)
0 29 2229.334 49 1410.161
1276.426 30 2208.002 50 1370.269 FLOW HYDROGRAPH
2500
1352.435 31 2171.321 51 1335.026
1397.222 32 2128.855 52 1307.591 2000
1462.997 33 2091.305
Discharge (m3/s)
1556.191 34 2059.544 1500
1637.915 35 2011.117
1000
1726.831 36 1958.898
1797.832 37 1923.088 500
1873.169 38 1866.186
1945.046 39 1824.081 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 73+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2026.406 40 1786.225
0 21 2102.403 41 1735.749
0 22 2164.15 42 1686.537
0 23 2211.034 43 1641.918
0 24 2216.365 44 1600.633
0 25 2246.883 45 1563.498
0 26 2284.062 46 1515.095
0 27 2269.518 47 1483.728
0 28 2260.528 48 1447.025 Simplified Hydrograph (per Hour)
0 29 2230.223 49 1411.698
1266.75 30 2208.999 50 1372.404 FLOW HYDROGRAPH
2500
1350.287 31 2173.576 51 1336.405
1394.739 32 2130.435 52 1308.934 2000
1459.218 33 2092.539
Discharge (m3/s)
1551.81 34 2061.27 1500
1634.144 35 2013.45
1000
1722.933 36 1960.885
1794.804 37 1925.136 500
1870.438 38 1868.446
1940.881 39 1825.834 0
0 10 20 30 40 50
Time (hours)
• Discharge data above is processed by HEC-RAS 5.0.6
• Hydrology data for HEC-RAS Processing is from Rainfall data of Mayoa and Pandayora that have been processed to be Hydrograph of PMF
• Geometry data for HEC-RAS Processing is from combined data of DEMNAS, LIDAR, and SURVEY OF BATHYMETRY
PT POSO ENERGY STA MARKED LOCATION
FLOW HYDROGRAPH OF POSO-1 HEPP DAM BREAK ANALYSIS
BASED ON HEC-RAS 5.0.6 ANALYSIS 74+000
UNSTEADY FLOW : PROBABLE MAXIMUM FLOOD
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 1936.896 40 1788.184
0 21 2099.698 41 1738.378
0 22 2161.516 42 1688.779
0 23 2210.294 43 1643.909
0 24 2215.959 44 1602.674
0 25 2245.225 45 1565.874
0 26 2283.354 46 1517.38
0 27 2270.735 47 1485.472
0 28 2261.055 48 1449.289 Simplified Hydrograph (per Hour)
0 29 2231.074 49 1413.549
1253.721 30 2209.827 50 1375.004
1347.586 31 2175.569 51 1338.114
1391.748 32 2131.787 52 1310.603
1454.76 33 2093.753
1546.752 34 2062.872
1630.033 35 2015.65
1718.792 36 1962.78
1791.723 37 1927.037
1867.646 38 1870.725
1936.896 39 1827.618
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 1763.014 40 1030.89
0 21 1387.655 41 363.512
410.589 22 785.654 42 2120.595
659.318 23 993.139 43 4344.201
526.331 24 3198.819 44 1820.804
366.949 25 1160.184 45 1469.398
411.088 26 449.393 46 534.978
1367.552 27 1192.372 47 1155.133
1412.725 28 6994.941 48 428.46 Simplified Hydrograph (per Hour)
1273.825 29 1769.909 49 2016.484
1193.013 30 5078.637 50 1312.625
1897.773 31 1501.13 51 678.407
7549.215 32 2167.585 52 523.424
1787.594 33 5843.839
647.733 34 623.892
490.704 35 731.744
9388.669 36 2128.347
1094.686 37 1192.142
2497.028 38 1681.73
650.868 39 3089.335
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2224.259 40 1592.325
0 21 2328.203 41 1624.214
0 22 2303.668 42 1606.745
0 23 2230.1 43 1544.185
0 24 2221.699 44 1439.561
0 25 2213.785 45 1462.593
5505.66 26 2236.925 46 1381.831
2010.751 27 2197.063 47 1338.01
1416.754 28 2263.921 48 1336.791 Simplified Hydrograph (per Hour)
1409.893 29 2154.073 49 1267.404
1405.164 30 2047.742 50 1293.364
1516.864 31 2119.586 51 1249.193
1653.405 32 2121.074 52 1184.355
1672.136 33 1979.442
1765.723 34 1937.106
1834.664 35 1877.152
1873.135 36 1804.364
1920.235 37 1780.231
2134.623 38 1746.276
2160.615 39 1687.381
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m /s)
3 (Hour) (m /s)
3 (Hour) (m 3/s)
0 20 2222.001 40 1654.233
0 21 2250.178 41 1635.367
0 22 2297.703 42 1583.45
0 23 2249.367 43 1526.651
0 24 2286.845 44 1501.052
0 25 2316.3 45 1443.246
0 26 2196.887 46 1453.859
3669.017 27 2305.74 47 1385.717
1614.034 28 2162.286 48 1378.894 Simplified Hydrograph (per Hour)
1427.986 29 2178.658 49 1295.2
1392.619 30 2137.984 50 1306.019
1460.201 31 2099.51 51 1266.71
1576.617 32 2034.771 52 1227.533
1701.219 33 2017.342
1730.425 34 1950.616
1858.933 35 1894.334
1866.571 36 1892.109
1997.939 37 1783.677
2071.165 38 1763.447
2093.795 39 1730.195
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 356.876 40 322.909
0 21 6460.238 41 458.102
0 22 593.45 42 406.909
0 23 698.918 43 984.355
0 24 1985.387 44 1489.586
528.781 25 834.626 45 449.11
429.376 26 471.254 46 1107.811
537.26 27 1220.338 47 607.05
2161.916 28 332.225 48 1503.108 Simplified Hydrograph (per Hour)
8585.017 29 1483.79 49 373.041
1393.786 30 1192.023 50 3212.292
1532.317 31 206.074 51 1009.156
2029.121 32 689.407 52 4714.907
266.675 33 2285.456
239.789 34 373.72
9751.655 35 1574.793
9835.591 36 343.381
593.126 37 291.618
26954.539 38 1304.322
704.466 39 269.593
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2186.466 40 1640.826
0 21 2285.047 41 1525.94
0 22 2061.538 42 1553.057
0 23 2112.668 43 1518.145
0 24 2282.63 44 1396.057
0 25 2130.896 45 1448.438
4198.936 26 2186.458 46 1294.908
1459.393 27 2054.925 47 1307.007
1394.368 28 2339.044 48 1299.363 Simplified Hydrograph (per Hour)
1403.544 29 2187.913 49 1236.098
1452.236 30 1921.255 50 1236.182
1619.564 31 2149.014 51 1238.1
1672.115 32 2020.798 52 1148.657
1804.525 33 2047.503
1938.534 34 1933.473
1881.28 35 1873.043
2004.002 36 1800.835
1813.978 37 1843.127
2117.391 38 1824.148
2155.566 39 1702.268
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m 3/s) (Hour) (m 3/s) (Hour) (m 3/s)
0 20 2065.318 40 1763.069
0 21 2133.874 41 1707.197
0 22 2193.223 42 1662.28
0 23 2213.225 43 1621.499
0 24 2225.782 44 1581.692
0 25 2271.795 45 1537.674
0 26 2290.954 46 1495.241
0 27 2256.906 47 1465.877
0 28 2248.317 48 1425.629 Simplified Hydrograph (per Hour)
1259.092 29 2220.835 49 1393.943
1344.151 30 2196.839 50 1348.978
1372.943 31 2146.932 51 1321.559
1423.441 32 2111.038 52 1294.153
1504.194 33 2078.845
1599.424 34 2039.977
1677.634 35 1985.908
1765.847 36 1940.383
1832.477 37 1898.544
1899.17 38 1844.036
1990.077 39 1805.669
Q Time Q Time Q
(Hour) (Hour)
Time Time
(m /s)
3 (Hour) (m /s)
3 (Hour) (m 3/s)
0 20 2024.303 40 1787.497
0 21 2100.626 41 1737.451
0 22 2162.469 42 1687.987
0 23 2210.571 43 1643.205
0 24 2216.081 44 1601.948
0 25 2245.786 45 1565.031
0 26 2283.611 46 1516.565
0 27 2270.308 47 1484.853
0 28 2260.895 48 1448.483 Simplified Hydrograph (per Hour)
0 29 2230.759 49 1412.889
1258.443 30 2209.546 50 1374.078
1348.554 31 2174.876 51 1337.503
1392.814 32 2131.338 52 1310.005
1456.346 33 2093.312
1548.549 34 2062.314
1631.487 35 2014.879
1720.251 36 1962.13
1792.805 37 1962.382
1868.626 38 1869.928
1938.288 39 1826.991
5000
4000
Sulewana + 2.5 Km
Pandiri
3000 Watuawu
Jembatan Pasar Baru
Jembatan Kota Poso
2000
1000
0
0 10 20 30 40 50
Time (hours)
FLOW HYDROGRAPH PER 10000 M
2500.00
Discharge (m3/s)
2000.00
STA 1+000
STA 10+000
1500.00
STA 50+000
STA 70+000
500.00
0.00
0 10 20 30 40 50
Time (hours)
<smoothed> <edited> FLOW HYDROGRAPH AMONG DAM OF POSO-1
DISCHARGE (m3/s)
3000
DAM POSO-1 + 10 KM
DAM POSO-1 + 20 KM
DAM POSO-1 + 30 KM
2500
DAM POSO-1 + 40 KM
DAM POSO-1 + 50 KM
2000 DAM POSO-1 + 60 KM
1500
1000
500
0
0 10 20 30 40 50
TIME (hours)
<smoothed> FLOW HYDROGRAPH AMONG DAM OF POSO-1
3000
DISCHARGE (m3/s)
DAM POSO-1 + 10 KM
DAM POSO-1 + 20 KM
DAM POSO-1 + 30 KM
2500
DAM POSO-1 + 40 KM
DAM POSO-1 + 50 KM
DAM POSO-1 + 60 KM
2000
NOTE
Shown computation
1500 data is start from 30 km
away from DAM Poso-1 HEPP
to downstream. This due to
the unstable calculation from
HEC-RAS 5.0.6 for closer RS.
1000
DAM POSO-1 + 20 KM
DISCHARGE (
DAM POSO-1 + 30 KM
2500
DAM POSO-1 + 40 KM
DAM POSO-1 + 50 KM
DAM POSO-1 + 60 KM
2000
NOTE
Shown computation
1500 data is start from 30 km
away from DAM Poso-1 HEPP
to downstream. This due to
the unstable calculation from
HEC-RAS 5.0.6 for closer RS.
1000
500
0
0 10 20 30 40 50
TIME (hours)
KOEFISIEN PENGUBAH HIDROGRAF
JARAK
40
50
60
1 10
Time Q Time Q Time Q Time Q Q Time Q
Time (Hour)
(Hour) (Hour) (Hour) (Hour) (Hour)
(m 3/s) (m 3/s) (m 3/s) (m 3/s) (m 3/s) (m 3/s)
0 0.00 20 2294.712 40 1494.25 0 0 20 2266.25 40 1569.683
1 584.19 21 2288.77 42 1414.8 1 506.089 21 2278.393 41 1527.215
2 698.63 22 2273.62 43 1377.94 2 905.265 22 2280.051 42 1485.7
STA 1+000 3 981.21 23 2250.80 44 1341.95 3 852.964 23 2272.317 43 1445.746
4 1308.07 24 2221.63 45 1308.46 4 979.867 24 2256.147 44 1408.05
5 1421.10 25 2187.00 46 1276.05 5 1164.049 25 2232.497 45 1371.498
STA 10+000
6 1465.76 26 2146.81 47 1245.1 6 1296.699 26 2202.343 46 1336.189
7 1485.54 27 2102.89 48 1214.69 7 1379.386 27 2166.686 47 1302.53
STA 50+000 8 1525.37 28 2102.58 49 1184.95 8 1436.415 28 2126.925 48 1270.111
9 1647.55 29 2009.89 50 1158.46 9 1501.282 29 2084.224 49 1238.384
10 1790.16 30 1961.03 51 1132.29 10 1596.116 30 2039.484 50 1208.11
STA 60+000 11 1860.10 31 1910.44 52 1107.88 11 1697.773 31 1992.558 51 1179.335
12 1913.91 32 1860.15 12 1782.579 32 1943.93 52 1151.862
13 1961.30 33 1811.51 13 1852.563 33 1895.214
STA 70+000
14 2014.79 34 1762.67 14 1912.961 34 1846.624
15 2113.89 35 1713.27 15 1979.08 35 1798.071
16 2210.66 36 1666.58 16 2060.507 36 1750.145
17 2258.20 37 1621.19 17 2140.202 37 1703.602
18 2284.05 38 1577.58 18 2200.626 38 1657.832
19 2292.77 39 1534.99 19 2241.449 39 1613.264
EDITED FLOW HYDROGRAPH EDITED FLOW HYDROGRAPH
23 sta 10 33 sta 20
Time Q Time Q Time Q Time Q Q Time Q
Time (Hour)
(Hour) (m /s)
3 (Hour) (m /s)
3 (Hour) (m /s)
3 (Hour) (m /s)
3
(m /s)
3 (Hour) (m 3/s)
0 0 20 2079.258 40 1738.635 0 0 20 1650.806 40 1500
AVERAGE ALL
288629925
Volume Time Discharge Volume Time Discharge Volume Time Discharge Volume
m3 Hour m3/s m3 Hour m3/s m3 Hour m3/s m3
0 0 0.00 0 0 0.00 0 0 0 0
0 1 0.00 0 1 0.00 0 1 0 0
0 2 0.00 0 2 0.00 0 2 0 0
0 3 0.00 0 3 0.00 0 3 0 0
2520000 4 0.00 0 4 0.00 0 4 0 0
3194093 5 0.00 0 5 0.00 0 5 0 0
4278467 6 900.00 3240000 6 0.00 0 6 0 0
4382219 7 1439.72 5182974 7 1000.00 3600000 7 0 0
4840960 8 2260.06 8136225 8 1216.16 4378163.4 8 1000 3600000
4943689 9 2271.05 8175776.4 9 1432.31 5156326.8 9 1375.104 4950374.4
5235404 10 1556.02 5601657.6 10 1446.22 5206399.2 10 1387.303 4994290.8
6510611 11 1602.39 5768589.6 11 1460.13 5256468 11 1403.22 5051592
6660000 12 1676.50 6035414.4 12 1563.14 5627296.8 12 1467.226 5282013.6
7077190 13 1842.09 6631506 13 1697.92 6112494 13 1571.953 5659030.8
7344259 14 1970.43 7093558.8 14 1724.76 6209136 14 1655.51 5959836
7488882 15 1987.75 7155903.6 15 1855.03 6678097.2 15 1739.824 6263366.4
7567682 16 2005.07 7218244.8 16 1871.25 6736482 16 1817.009 6541232.4
7949927 17 1449.17 5217001.2 17 1998.82 7195744.8 17 1886.934 6792962.4
8126237 18 2097.98 7552735.2 18 2047.31 7370308.8 18 1930.992 6951571.2
8196347 19 2189.30 7881472.8 19 2098.08 7553088 19 2050.488 7381756.8
8212043 20 2217.38 7982560.8 20 2205.11 7938403.2 20 2110.016 7596057.6
8320442 21 2249.08 8096673.6 21 2232.48 8036913.6 21 2165.133 7794478.8
8560354 22 2254.57 8116448.4 22 2285.03 8226100.8 22 2222.411 8000679.6
8646419 23 2260.06 8136225 23 0.00 0 23 2234.229 8043224.4
8550983 24 2271.05 8175776.4 24 2293.83 8257777.2 24 2246.047 8085769.2
7923989 25 1506.68 5424044.4 25 2252.96 8110638 25 2307.737 8307853.2
7560961 26 1449.17 5217001.2 26 2212.08 7963498.8 26 2292.794 8254058.4
7214162 27 1381.54 4973554.8 27 2186.26 7870521.6 27 2253.21 8111556
7167154 28 2347.10 8449545.6 28 2160.43 7777544.4 28 2224.89 8009604
7014038 29 2162.59 7785324 29 0.00 0 29 2209.718 7954984.8
7123550 30 1310.42 4717504.8 30 2142.56 7713223.2 30 2179.389 7845800.4
7109543 31 2129.90 7667622 31 2092.64 7533500.4 31 2113.963 7610266.8
6915164 32 2077.87 7480344.6 32 2030.40 7309436.4 32 2083.146 7499325.6
6846761 33 2025.85 7293067.2 33 2026.00 7293585.6 33 2062.382 7424575.2
6669954 34 1916.47 6899274 34 1952.68 7029648 34 2009.455 7234038
6496751 35 1847.02 6649254 35 1928.03 6940897.2 35 1950.202 7020727.2
5766023 36 1817.27 6542155.8 36 1903.37 6852146.4 36 1922.773 6921982.8
5946354 37 1815.02 6534064.8 37 1783.28 6419800.8 37 1857.463 6686866.8
5595682 38 1819.51 6550246.8 38 1771.79 6378436.8 38 1818.216 6545577.6
5227283 39 1723.78 6205608 39 1735.81 6248930.4 39 1780.971 6411495.6
5222747 40 1681.29 6052626 40 1661.52 5981457.6 40 1731.016 6231657.6
5298732 41 1536.92 5532919.2 41 1632.74 5877871.2 41 1671.905 6018858
5157637 42 1508.72 5431399.2 42 1581.85 5694674.4 42 1628.588 5862916.8
5039554 43 1506.68 5424044.4 43 1531.21 5512348.8 43 1593.359 5736092.4
4999165 44 1449.17 5217001.2 44 1513.90 5450054.4 44 1560.837 5619013.2
4863161 45 1381.54 4973554.8 45 1442.07 5191462.8 45 1498.717 5395381.2
4716443 46 1310.42 4717504.8 46 1417.02 5101275.6 46 1474.899 5309636.4
4393282 47 1294.02 4658464.8 47 1391.97 5011088.4 47 1439.585 5182506
4320985 48 1291.62 4649832 48 1377.50 4958989.2 48 1397.746 5031885.6
4016743 49 1244.78 4481215.2 49 1302.99 4690778.4 49 1366.744 4920278.4
3959561 50 1233.41 4440265.2 50 1302.06 4687423.2 50 1319.679 4750844.4
4032400 51 1227.97 4420688.4 51 1268.10 4565142 51 1301.525 4685490
3599280 52 1152.65 4149536.4 52 1233.64 4441111.2 52 1273.731 4585431.6
2.99E+08 2347.10 293936407 2293.83 278144685 2307.74 290116940
-3.52% KR 1.84% 3.63% 0.52%
STA 63+000 DAM POSO 1+50 KM STA 73+000 DAM POSO 1+60 KM
Q Q Q Time Q Time Q Q Time
Time (Hour) Time (Hour) Time (Hour)
(m /s)
3
(m /s)
3
(m /s)
3 (Hour) (m /s)
3 (Hour) (m /s)
3
(m 3/s) (Hour)
(m 3/s)
1786.225
1735.749
1686.537
1641.918
1600.633
1563.498
1515.095
1483.728
1447.025
1411.698
1372.404
1336.405
1308.934
GRAPH
Q
(m 3/s)
1786.225
1735.749
1686.537
1641.918
1600.633
1563.498
1515.095
1483.728
1447.025
1411.698
1372.404
1336.405
1308.934
74
Time Q Time Q Time Q
(Hour) (Hour) (Hour)
(m 3/s) (m 3/s) (m 3/s)
0 0 20 1936.896 40 1788.184
1 0 21 2099.698 41 1738.378
2 0 22 2161.516 42 1688.779
3 0 23 2210.294 43 1643.909
4 0 24 2215.959 44 1602.674
5 0 25 2245.225 45 1565.874
6 0 26 2283.354 46 1517.38
7 0 27 2270.735 47 1485.472
8 0 28 2261.055 48 1449.289
9 0 29 2231.074 49 1413.549
10 1253.721 30 2209.827 50 1375.004
11 1347.586 31 2175.569 51 1338.114
12 1391.748 32 2131.787 52 1310.603
13 1454.76 33 2093.753
14 1546.752 34 2062.872
15 1630.033 35 2015.65
16 1718.792 36 1962.78
17 1791.723 37 1927.037
18 1867.646 38 1870.725
19 1936.896 39 1827.618
<smoothed> <edited> FLOW HYDROGRAPH AMONG DAM OF P
DISCHARGE (m3/s) 2500
2000
1500
1000
500
0
0 10 20 30 40
TIME (hours)
EDITED FLOW HYDROGRAPH
APH AMONG DAM OF POSO-1 STA 23+000 DAM POSO 1 + 10 KM
DAM POSO-1 + 10 Time Q Time Q
KM (Hour) (m /s)
3 (Hour) (m 3/s)
DAM POSO-1 + 15 0 0 20 520.396
KM
DAM POSO-1 + 30 1 0 21 578.679
KM 2 0 22 479.125
DAM POSO-1 + 40 2075.691
3 23 511.137
KM
DAM POSO-1 + 50 4 813.106 24 442.547
KM 5 664.434 25 498.632
6 573.773 26 413.485
7 555.785 27 500.496
8 541.289 28 471.619
9 522.892 29 511.243
10 477.809 30 460.118
11 528.136 31 499.426
12 473.817 32 508.13
13 539.797 33 476.439
14 536.582 34 535.654
15 482.03 35 510.531
16 485.183 36 454.29
40 50 17 460.989 37 517.423
18 532.544 38 524.371
19 443.963 39 476.778
HYDROGRAPH EDITED FLOW HYDROGRAPH
O 1 + 10 KM STA 38+000 DAM POSO 1 + 15 KM
Time Q Time Q Time Q Time Q
(Hour) (m /s)
3 (Hour) (m /s)
3 (Hour) (m /s)
3 (Hour) (m 3/s)
40 511.56 0 0 20 481.036 40 427.567
41 497.152 1 0 21 672.978 41 509.252
42 515.552 2 0 22 555.223 42 600.612
43 564.702 3 0 23 522.876 43 458.993
44 502.125 4 0 24 497.231 44 420.194
45 446.103 5 1725.44 25 474.06 45 507.938
46 485.682 6 977.244 26 495.397 46 507.81
47 529.494 7 777.244 27 469.464 47 500.04
48 478.379 8 550.727 28 514.186 48 511.191
49 480.911 9 500.119 29 569.28 49 534.771
50 476.375 10 442.145 30 503.013 50 485.168
51 477.27 11 524.895 31 473.937 51 430.312
52 522.266 12 477.528 32 525.326 52 436.907
13 516.066 33 482.99
14 477.002 34 467.766
15 526.919 35 517.281
16 525.204 36 429.506
17 474.379 37 407.158
18 544.291 38 571.097
19 603.234 39 453.279
EDITED FLOW HYDROGRAPH EDITED FLOW HYDROGRAPH
STA 43+000 DAM POSO 1 + 30 KM STA 53+000 DAM POSO 1 + 40 KM
Time Q Time Q Time Q Time Q Time
(Hour) (m /s)
3 (Hour) (m /s)
3 (Hour) (m /s)
3 (Hour) (m 3/s) (Hour)
0 0.00 20 497.02 40 488.90 0 0 20
1 0.00 21 487.95 41 509.26 1 0 21
2 0.00 22 474.68 42 487.32 2 0 22
3 0.00 23 509.14 43 523.69 3 0 23
4 0.00 24 513.16 44 491.98 4 0 24
5 0.00 25 473.57 45 503.49 5 0 25
6 1697.33 26 516.34 46 509.34 6 0 26
7 651.22 27 495.38 47 485.15 7 1548.471 27
8 540.30 28 514.22 48 498.82 8 826.086 28
9 531.82 29 489.56 49 498.26 9 592.613 29
10 511.38 30 502.51 50 512.60 10 530.075 30
11 504.99 31 509.47 51 507.08 11 515.384 31
12 502.72 32 525.99 52 496.54 12 514.419 32
13 491.75 33 477.11 13 507.05 33
14 483.90 34 499.83 14 503.52 34
15 501.17 35 520.01 15 499.731 35
16 468.08 36 502.84 16 505.542 36
17 493.99 37 498.83 17 491.542 37
18 502.27 38 497.46 18 504.204 38
19 495.74 39 509.08 19 508.485 39
ITED FLOW HYDROGRAPH EDITED FLOW HYDROGRAPH
DAM POSO 1 + 40 KM STA 63+000 DAM POSO 1+50 KM
Q Time Q Time Q Time Q Time Q
(m /s)
3 (Hour) (m /s)
3 (Hour) (m /s)
3 (Hour) (m /s)
3 (Hour) (m 3/s)
498.51 40 501.36 0 0 20 504.184 40 499.319
503.42 41 493.51 1 0 21 499.756 41 499.584
503.03 42 508.62 2 0 22 499.313 42 499.204
498.25 43 500.15 3 0 23 498.669 43 502.587
502.93 44 495.96 4 0 24 499.975 44 502.122
506.28 45 496.09 5 0 25 503.997 45 497.891
493.80 46 502.95 6 0 26 500.004 46 498.427
502.62 47 501.33 7 0 27 499.334 47 500.882
492.02 48 495.52 8 1224.268 28 499.487 48 499.899
503.63 49 500.79 9 790.401 29 498.083 49 497.727
503.48 50 502.16 10 651.014 30 499.68 50 500.995
503.38 51 501.03 11 584.498 31 501.168 51 501.716
500.92 52 499.77 12 551.852 32 502.012 52 501.395
506.26 13 534.546 33 502.427
493.54 14 521.652 34 500.445
498.82 15 512.774 35 497.007
507.42 16 509.012 36 499.719
498.37 17 504.294 37 503.147
500.72 18 499.751 38 499.919
498.28 19 503.217 39 499.147
EDITED FLOW HYDROGRAPH
STA 73+000 DAM POSO 1+60 KM
Time Q Time Q Time Q
(Hour) (m /s)
3 (Hour) (m /s)
3 (Hour) (m 3/s)
0 0 20 505.004 40 500.686
1 0 21 504.089 41 499.958
2 0 22 503.796 42 499.669
3 0 23 502.171 43 499.333
4 0 24 500.958 44 499.678
5 0 25 499.882 45 500.958
6 0 26 499.971 46 501.186
7 0 27 501.761 47 499.705
8 0 28 501.008 48 499.199
9 0 29 500.211 49 499.935
10 0 30 499.526 50 499.77
11 677.292 31 499.036 51 499.036
12 669.986 32 499.554 52 499.866
13 623.385 33 500.432
14 584.889 34 501.161
15 557.705 35 501.914
16 538.451 36 501.06
17 524.878 37 499.242
18 516.476 38 499.672
19 509.838 39 501.013