SPECCONv1_01 calculates the dissipation of excess pore water pressures in a


multilayer soil system subject to vertical and radial drainage. Soil properties are
constant. Loading is a single ramp load uniform with depth.

SPECCON was developed as part of the PhD thesis of Walker (2006) at the
University of Wollongong under the supervision of Prof. Buddhima Indraratna

This version of SPECCON was developed in response to reviewer comments for


the paper: Walker, R., Indraratna, B., and Sivakugan, N. "Vertical and radial
consolidation analysis of multi layered soil using the spectral method."
Submitted to Journal of Geotechnical and Geoenvironmental Engineering,
ASCE.

The Visual Basic for Applications (VBA) Excel version of SPECCON was made
possible through the free availability of eigenvalue/eigenvector extraction
subroutines by Volpi (2005)

The VBA code can be accessed through the VBA editor (Tools…Macro…Visual
Basic Editor)

MAKE SURE THAT MACROS HAVE BEEN ENABLED. (Tools… Macro…Security. You may
need to restart Excel.)
1 Copy Template sheet.
2 To prevent calculation during parameter input set the "Calculation?" cell (C132) to
FALSE.
3 Output times can be varied to suit though usually it is only necessary to alter the
final time increment and the intermediate times will be calculated based on linear or
logarithmic interpolation as chosen in cell C133.
4 Enter material/geometry properties in the appropriate yellow cells.
5
Choose a reference layer to which all properties will be normalised to. Note if
vertical drains are included then the reference layer must contain vertical drains.
6 Set the "Calculation?" cell (C132) to TRUE and wait.

Other:
Verification worksheets may be deleted to reduce file size.
Input units are usually m, kN, and years. The Excel goal seek tool can easily be
used to ensure an appropriate value in another unit system is achieved
Default output is average excess pore pressure vs time for each layer plus an
average over the whole soil profile. Pore pressure vs depth is also calculated at
the specified output times.

SPECCON Instructions Page 1 of 19


Note that the default pore pressure output at depth is calculated at four points
within a each layer. To achieve more output points within a layer in may be
necessary to subdivide the layer.
SPECCON is implemented as an ARRAY function. See excel help menu for
information on entering and editing array functions.
The greater the number of series terms used, the greater the accuracy of the
solution. But more series terms results in longer computation times.
Pore pressure vs depth does not look like a sine curve (Terzaghi 1D
consolidation)=more series terms
Problem dominated by radial drainage = more series terms
If pore pressure distribution in the short term is important=more series terms
If long term average pore pressure is more important=less series terms
Suitability of solution can be assessed by how much the pore pressure distribution
changes when including an extra series term.
A "time factor multiplier" has been included to quickly increase/decrease all c v and
ch values. This is useful in back analysing problems.
No error catching procedures have been written into the SPECCON code. If an
error occurs, try turning calculations on/off, and check input.
SPECCON was implemented as a function to allow use of Excel's Goal seek and
Solver tools.
The template was set up to print two A3 sheets.
If the calulations are taking too long, try pressing ESC or Break muliple times.

References
Volpi, L. (2005). MATRIX - Matrix and Linear Algebra addin for EXCEL. Piombini,
Italy, Foxes Team. Available online at: http://digilander.libero.it/foxes/
Walker, R. (2006) "Analytical solutions for modeling soft soil consolidation by
vertical drains". PhD Thesis, University of Wollongong, NSW AUSTRALIA.

Smear zone m equations:


Hansbo, S. (1981). "consolidation of fine-grained soils by prefabricated vertical
drains." Proc. 10th International Conference on Soil Mechanics and foundation
engineering, Stockholm, 677-682.
Walker, R and Indraratna, B, (2007) "Vertical drain consolidation with overlapping
smear zones", Geotechnique, 57(5), 463-467.
Walker, R and Indraratna, B, (2006) "Vertical Drain Consolidation with Parabolic
Distribution of Permeability in Smear Zone", Journal of Geotechnical and
Geoenvironmental Engineering, 132, 937

SPECCON Instructions Page 2 of 19


Version updates

VERSION Date Modified by Comment


Various unofficial versions of SPECCON (in
SPECCON 2005, 2006 Rohan Walker VBA Excel and Mathematica) were pieced
together towards the end of my PhD thesis.
1st official version. 20 layers. Vertical and
SPECCONv1_01 4/14/2008 Rohan Walker radial drainage. Various smear zone
configurations. Single ramp load.
SPECCONv1_01
by Rohan Walker
Parameter Symbol Unit
# of series terms 30
Total stress change Ds kPa 100
Drainage condition 1=one way, 2=two way 1
Reference layer 3
Unit weight of water gw kN/m3 10
yr 0.4
Construction time tc days 146.096
seconds 12622694
Pseudo vertical time factor (/t) dTv=cv/H2 yr-1 1.00E+00
Pseudo horizontal time factor (/t) dTh=2ch/re m 2
yr-1 #VALUE!
Depth of profile H m 5
Time factor multiplier 1
Layer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Layer thickness m 1 1 1 1 1
Volume compressibility mv m2/kN 0.1 0.1 0.1 0.1 0.1
Vertical permeability kv m/yr 25 25 25 25 25
Horizontal permeability kh m/yr 200 200 200 1 1
Include drains TRUE/FALSE 1 1 1 0 0
Drain Pattern TRIANGLE or SQUARE TRI TRI TRI TRI TRI
Drain Spacing Sp m 1.5 1.5 1.5 1.5 1.5
Drain radius rw m 0.025 0.025 0.025 0.025 0.025
Ratio of smear to drain radius s=rs/rw 5 5 5 5 5
Ratio of undisturbed horizontal
permeability to smear zone permeability at k =kh/k0 5 5 5 5 5
drain soil interface
Type of smear zone* I,C,L,P,LX C C C C C
Influence radius re m 0.788 0.788 0.788 0.788 0.788
Smear zone radius rs m 0.125 0.125 0.125 0.125 0.125
Ratio of influence to drain radius n=re/rw 31.5 31.5 31.5 31.5 31.5
Smear zone and geometry parameter m #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
m/day 0.0684481 0.0684481 0.0684481 0.0684481 0.0684481
Vertical permeability kv
m/s 7.922E-07 7.922E-07 7.922E-07 7.922E-07 7.922E-07
m/day 0.5475851 0.5475851 0.5475851 0.0027379 0.0027379
Horizontal permeability kh
m/s 6.338E-06 6.338E-06 6.338E-06 3.169E-08 3.169E-08
Ratio of horizontal to vertical permeability kh/kv 8 8 8 0.04 0.04
m /yr
2
25 25 25 25 25
Vertical coeficent of consolidation cv m2/day 0.0684481 0.0684481 0.0684481 0.0684481 0.0684481
m2/s 7.922E-07 7.922E-07 7.922E-07 7.922E-07 7.922E-07
m2/yr 200 200 200 1 1
Horizontal coeficent of consolidation ch m2/day 0.5475851 0.5475851 0.5475851 0.0027379 0.0027379
m2/s 6.338E-06 6.338E-06 6.338E-06 3.169E-08 3.169E-08
Ratio of horizontal to vertical consolidation ch/cv
coefficient 8 8 8 0.04 0.04
Lumped drain parameter h=kh/re2m m-1yr-1 #VALUE! #VALUE! #VALUE! 0 0
kv/kvREF 1 1 1 1 1
h/hREF #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
mv/mvREF 1 1 1 1 1

*I=Ideal(no smear), C=constant permeability, L=linear perm., P=parabolic perm., LX=linear overlapping drawn client:
approved project: Pacific Highway Upgrade Ballina Bypass
date 22-December-2008 title:
title
scale NTS
Page 1 of 2 original size A3 project no: 1234 figure no: FIGURE 1a
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$TEMPLATE
120 0 10 20 30 40 50 60 70 80 90
0

100
1

80
2
Average excess pore pressure (kPa)

Depth (m)
60
3
10

40 4

20 5

0 6
0 0.2 0.4 0.6 0.8 1 1.2
Pore Pressure (kPa)
Time (yr)

Layer: 0.001 0.034 0.068 0.101 0.134 0.167 0.201 0.234


Load ALL 1 2 3 4 time: 0.267 0.300 0.334 0.367 0.400 0.423 0.446 0.469
5 6 7 8 9 10 0.492 0.515 0.538 0.562 0.585 0.608 0.631 0.654
11 12 13 14 15 16 0.677 0.700 0.723 0.746 0.769 0.792 0.815 0.838
17 18 19 20 0.862 0.885 0.908 0.931 0.954 0.977 1.000
Average excess pore pressure for each layer Excess pore pressure vs depth

drawn client:
approved project: Pacific Highway Upgrade Ballina Bypass
date 22 December 2008 title:
title
scale NTS
Page 2 of 2 original size A3 project no: 1234 figure no: FIGURE 1b
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$TEMPLATE
SPECCONv1_01
by Rohan Walker
Parameter Symbol Unit
# of series terms 12
Total stress change Ds kPa 1
Drainage condition 1=one way, 2=two way 1
Reference layer 1
Unit weight of water gw kN/m3 10
yr 0.2
Construction time tc days 73.048
seconds 6311347.2
Pseudo vertical time factor (/t) dTv=cv/H2 yr-1 1.00E+00
Pseudo horizontal time factor (/t) dTh=2ch/re m 2
yr-1 #VALUE!
Depth of profile H m 1
Time factor multiplier 1
Layer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Layer thickness m 0.25 0.25 0.25 0.25
Volume compressibility mv m2/kN 0.1 0.1 0.1 0.1
Vertical permeability kv m/yr 1 1 1 1
Horizontal permeability kh m/yr 1 1 1 1
Include drains TRUE/FALSE 1 1 1 1
Drain Pattern TRIANGLE or SQUARE TRI TRI TRI TRI
Drain Spacing Sp m 0.952381 0.952381 0.952381 0.952381
Drain radius rw m 0.03 0.03 0.03 0.03
Ratio of smear to drain radius s=rs/rw 5 5 5 5
Ratio of undisturbed horizontal
permeability to smear zone permeability at k=kh/k0 5 5 5 5
drain soil interface
Type of smear zone* I,C,L,P,LX I I I I
Influence radius re m 0.5 0.5 0.5 0.5
Smear zone radius rs m 0.15 0.15 0.15 0.15
Ratio of influence to drain radius n=re/rw 16.667 16.667 16.667 16.667
Smear zone and geometry parameter m #VALUE! #VALUE! #VALUE! #VALUE!
m/day 0.0027379 0.0027379 0.0027379 0.0027379
Vertical permeability kv
m/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08
m/day 0.0027379 0.0027379 0.0027379 0.0027379
Horizontal permeability kh
m/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08
Ratio of horizontal to vertical permeability kh/kv 1 1 1 1
m /yr
2
1 1 1 1
Vertical coeficent of consolidation cv m2/day 0.0027379 0.0027379 0.0027379 0.0027379
m2/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08
m2/yr 1 1 1 1
Horizontal coeficent of consolidation ch m2/day 0.0027379 0.0027379 0.0027379 0.0027379
m2/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08
Ratio of horizontal to vertical consolidation ch/cv
coefficient 1 1 1 1
Lumped drain parameter h=kh/re2m m-1yr-1 #VALUE! #VALUE! #VALUE! #VALUE!
kv/kvREF 1 1 1 1
h/hREF #VALUE! #VALUE! #VALUE! #VALUE!
mv/mvREF 1 1 1 1

*I=Ideal(no smear), C=constant permeability, L=linear perm., P=parabolic perm., LX=linear overlapping drawn RW client: -
approved project: -
date 06-April-2008 title:
SPECCON verification: Tang and Onitsuka (2001)
scale NTS
Page 1 of 2 original size A3 project no: - figure no: FIGURE 1a
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri1
1.2 0 10 20 30 40 50 60 70 80 90
0

1 0.2

0.4
0.8
Average excess pore pressure (kPa)

Depth (m)
0.6
0.6 10

0.8

0.4

0.2

1.2

Pore Pressure (kPa)


0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 0.001 0.018 0.034 0.051 0.067 0.084 0.101 0.117
time: 0.134 0.150 0.167 0.183 0.200 0.231 0.262 0.292
Layer: Time (yr)
0.323 0.354 0.385 0.415 0.446 0.477 0.508 0.538
0.569 0.600 0.631 0.662 0.692 0.723 0.754 0.785
Load ALL Tang and Onitsuka (2000) 0.815 0.846 0.877 0.908 0.938 0.969 1.000
Average excess pore pressure for each layer Excess pore pressure vs depth

drawn RW client: -
approved project: -
date 6 April 2008 title:
SPECCON verification: Tang and Onitsuka (2001)
scale NTS
Page 2 of 2 original size A3 project no: - figure no: FIGURE 1b
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri1
SPECCONv1_01
by Rohan Walker
Parameter Symbol Unit
# of series terms 35
Total stress change Ds kPa 1
Drainage condition 1=one way, 2=two way 1
Reference layer 3 H/rw 200
Unit weight of water gw kN/m3 10 h2/h1 1
yr 0 kv2/kv1 2
Construction time tc days 0 cv2/cv1 1
seconds 0 ch2/ch1 5
Pseudo vertical time factor (/t) dTv=cv/H2 yr-1 1.00E-02
Pseudo horizontal time factor (/t) dTh=2ch/re2m yr-1 #VALUE!
Depth of profile H m 10
Time factor multiplier 1
Layer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Layer thickness m 1 1 1 1 1 1 1 1 1 1
Volume compressibility mv m2/kN 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2
Vertical permeability kv m/yr 1 1 1 1 1 2 2 2 2 2
Horizontal permeability kh m/yr 1 1 1 1 1 10 10 10 10 10
Include drains TRUE/FALSE 1 1 1 1 1 1 1 1 1 1
Drain Pattern TRIANGLE or SQUARE TRI TRI TRI TRI TRI TRI TRI TRI TRI TRI
Drain Spacing Sp m 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381
Drain radius rw m 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Ratio of smear to drain radius s=rs/rw 1 1 1 1 1 1 1 1 1 1
Ratio of undisturbed horizontal
permeability to smear zone permeability at k=kh/k0 1
drain soil interface 1 1 1 1 1 1 1 1 1
Type of smear zone* I,C,L,P,LX I I I I I I I I I I
Influence radius re m 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Smear zone radius rs m 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Ratio of influence to drain radius n=re/rw 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
Smear zone and geometry parameter m #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
m/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0054759 0.0054759 0.0054759 0.0054759 0.0054759
Vertical permeability kv
m/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 6.338E-08 6.338E-08 6.338E-08 6.338E-08 6.338E-08
m/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0273793 0.0273793 0.0273793 0.0273793 0.0273793
Horizontal permeability kh
m/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-07 3.169E-07 3.169E-07 3.169E-07 3.169E-07
Ratio of horizontal to vertical permeability kh/kv 1 1 1 1 1 5 5 5 5 5
m2/yr 1 1 1 1 1 1 1 1 1 1
Vertical coeficent of consolidation cv m2/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379
m2/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08
m2/yr 1 1 1 1 1 5 5 5 5 5
Horizontal coeficent of consolidation ch m2/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0136896 0.0136896 0.0136896 0.0136896 0.0136896
m2/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 1.584E-07 1.584E-07 1.584E-07 1.584E-07 1.584E-07
Ratio of horizontal to vertical consolidation ch/cv
coefficient 1 1 1 1 1 5 5 5 5 5
Lumped drain parameter h=kh/re2m m-1yr-1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
kv/kvREF 1 1 1 1 1 2 2 2 2 2
h/hREF #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
mv/mvREF 1 1 1 1 1 2 2 2 2 2

*I=Ideal(no smear), C=constant permeability, L=linear perm., P=parabolic perm., LX=linear overlapping drawn RW client: -
approved project: -
date 06-April-2008 title:
SPECCON verification: Nogami and Li (2003), CASE 1
scale NTS
Page 1 of 2 original size A3 project no: - figure no: FIGURE 1a
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri2a
1.2 0 10 20 30 40 50 60 70 80 90
0

1
2

0.8 4
Average excess pore pressure (kPa)

Depth (m)
0.6 6
10

0.4 8

0.2 10

12
0
0 Load ALL
0.05 1 0.1 2 0.15 3 40.2 0.25
Layer: Pore Pressure (kPa)
5 6 7 8 9 10
11 12 13 Time 14
(yr) 15 16
17 18 19 20 time: 0.0200 0.200 Nogami and Li (2003)
Average excess pore pressure for each layer Excess pore pressure vs depth

drawn RW client: -
approved project: -
date 6 April 2008 title:
SPECCON verification: Nogami and Li (2003), CASE 1
scale NTS
Page 2 of 2 original size A3 project no: - figure no: FIGURE 1b
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri2a
SPECCONv1_01
by Rohan Walker
Parameter Symbol Unit
# of series terms 35
Total stress change Ds kPa 1
Drainage condition 1=one way, 2=two way 1
Reference layer 3 H/rw 200
Unit weight of water gw kN/m3 10 h2/h1 1
yr 0 kv2/kv1 2
Construction time tc days 0 cv2/cv1 1
seconds 0 ch2/ch1 1
Pseudo vertical time factor (/t) dTv=cv/H2 yr-1 1.00E-02
Pseudo horizontal time factor (/t) dTh=2ch/re2m yr-1 #VALUE!
Depth of profile H m 10
Time factor multiplier 1
Layer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Layer thickness m 1 1 1 1 1 1 1 1 1 1
Volume compressibility mv m2/kN 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2
Vertical permeability kv m/yr 1 1 1 1 1 2 2 2 2 2
Horizontal permeability kh m/yr 1 1 1 1 1 2 2 2 2 2
Include drains TRUE/FALSE 1 1 1 1 1 1 1 1 1 1
Drain Pattern TRIANGLE or SQUARE TRI TRI TRI TRI TRI TRI TRI TRI TRI TRI
Drain Spacing Sp m 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381
Drain radius rw m 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Ratio of smear to drain radius s=rs/rw 1 1 1 1 1 1 1 1 1 1
Ratio of undisturbed horizontal
permeability to smear zone permeability at k=kh/k0 1
drain soil interface 1 1 1 1 1 1 1 1 1
Type of smear zone* I,C,L,P,LX I I I I I I I I I I
Influence radius re m 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Smear zone radius rs m 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Ratio of influence to drain radius n=re/rw 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
Smear zone and geometry parameter m #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
m/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0054759 0.0054759 0.0054759 0.0054759 0.0054759
Vertical permeability kv
m/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 6.338E-08 6.338E-08 6.338E-08 6.338E-08 6.338E-08
m/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0054759 0.0054759 0.0054759 0.0054759 0.0054759
Horizontal permeability kh
m/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 6.338E-08 6.338E-08 6.338E-08 6.338E-08 6.338E-08
Ratio of horizontal to vertical permeability kh/kv 1 1 1 1 1 1 1 1 1 1
m2/yr 1 1 1 1 1 1 1 1 1 1
Vertical coeficent of consolidation cv m2/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379
m2/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08
m2/yr 1 1 1 1 1 1 1 1 1 1
Horizontal coeficent of consolidation ch m2/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379
m2/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08
Ratio of horizontal to vertical consolidation ch/cv
coefficient 1 1 1 1 1 1 1 1 1 1
Lumped drain parameter h=kh/re2m m-1yr-1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
kv/kvREF 1 1 1 1 1 2 2 2 2 2
h/hREF #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
mv/mvREF 1 1 1 1 1 2 2 2 2 2

*I=Ideal(no smear), C=constant permeability, L=linear perm., P=parabolic perm., LX=linear overlapping drawn RW client: -
approved project: -
date 06-April-2008 title:
SPECCON verification: Nogami and Li (2003), CASE 2
scale NTS
Page 1 of 2 original size A3 project no: - figure no: FIGURE 1a
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri2b
1.2 0 10 20 30 40 50 60 70 80 90
0

1 2

4
0.8
Average excess pore pressure (kPa)

Depth (m)
6
0.6 10

0.4

10

0.2

12

Load ALL 1 2 3 4
Pore Pressure (kPa)
5 6 7 8 9 10
0
11 12 13 14 15 16
0 0.05 0.1 0.15 0.2 0.25
0.0200 0.200 Nogami and Li (2003)
La 17 18 19 Time20
(yr)
ti
yer m
: Average excess pore pressure for each layer
e: Excess pore pressure vs depth

drawn RW client: -
approved project: -
date 6 April 2008 title:
SPECCON verification: Nogami and Li (2003), CASE 2
scale NTS
Page 2 of 2 original size A3 project no: - figure no: FIGURE 1b
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri2b
SPECCONv1_01
by Rohan Walker
Parameter Symbol Unit
# of series terms 35
Total stress change Ds kPa 1
Drainage condition 1=one way, 2=two way 1
Reference layer 3 H/rw 200
Unit weight of water gw kN/m3 10 h2/h1 1
yr 0 kv2/kv1 2
Construction time tc days 0 cv2/cv1 1
seconds 0 ch2/ch1 0.2
Pseudo vertical time factor (/t) dTv=cv/H2 yr-1 1.00E-02
Pseudo horizontal time factor (/t) dTh=2ch/re2m yr-1 #VALUE!
Depth of profile H m 10
Time factor multiplier 1
Layer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Layer thickness m 1 1 1 1 1 1 1 1 1 1
Volume compressibility mv m2/kN 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2
Vertical permeability kv m/yr 1 1 1 1 1 2 2 2 2 2
Horizontal permeability kh m/yr 5 5 5 5 5 2 2 2 2 2
Include drains TRUE/FALSE 1 1 1 1 1 1 1 1 1 1
Drain Pattern TRIANGLE or SQUARE TRI TRI TRI TRI TRI TRI TRI TRI TRI TRI
Drain Spacing Sp m 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381 0.952381
Drain radius rw m 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Ratio of smear to drain radius s=rs/rw 1 1 1 1 1 1 1 1 1 1
Ratio of undisturbed horizontal
permeability to smear zone permeability at k=kh/k0 1
drain soil interface 1 1 1 1 1 1 1 1 1
Type of smear zone* I,C,L,P,LX I I I I I I I I I I
Influence radius re m 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Smear zone radius rs m 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Ratio of influence to drain radius n=re/rw 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
Smear zone and geometry parameter m #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
m/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0054759 0.0054759 0.0054759 0.0054759 0.0054759
Vertical permeability kv
m/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 6.338E-08 6.338E-08 6.338E-08 6.338E-08 6.338E-08
m/day 0.0136896 0.0136896 0.0136896 0.0136896 0.0136896 0.0054759 0.0054759 0.0054759 0.0054759 0.0054759
Horizontal permeability kh
m/s 1.584E-07 1.584E-07 1.584E-07 1.584E-07 1.584E-07 6.338E-08 6.338E-08 6.338E-08 6.338E-08 6.338E-08
Ratio of horizontal to vertical permeability kh/kv 5 5 5 5 5 1 1 1 1 1
m2/yr 1 1 1 1 1 1 1 1 1 1
Vertical coeficent of consolidation cv m2/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379
m2/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08
m2/yr 5 5 5 5 5 1 1 1 1 1
Horizontal coeficent of consolidation ch m2/day 0.0136896 0.0136896 0.0136896 0.0136896 0.0136896 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379
m2/s 1.584E-07 1.584E-07 1.584E-07 1.584E-07 1.584E-07 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08
Ratio of horizontal to vertical consolidation ch/cv
coefficient 5 5 5 5 5 1 1 1 1 1
Lumped drain parameter h=kh/re2m m-1yr-1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
kv/kvREF 1 1 1 1 1 2 2 2 2 2
h/hREF #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
mv/mvREF 1 1 1 1 1 2 2 2 2 2

*I=Ideal(no smear), C=constant permeability, L=linear perm., P=parabolic perm., LX=linear overlapping drawn RW client: -
approved project: -
date 06-April-2008 title:
SPECCON verification: Nogami and Li (2003), CASE 3
scale NTS
Page 1 of 2 original size A3 project no: - figure no: FIGURE 1a
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri2c
1.2 0 10 20 30 40 50 60 70 80 90
0

1 2

4
0.8
Average excess pore pressure (kPa)

Depth (m)
6
0.6 10

0.4

10

0.2

12

Load ALL 1 2 3 4 Pore Pressure (kPa)


0 5 6 7 8 9 10
0 11 12
0.05 13 0.1 14 0.1515 16 0.2 0.25 0.0200 0.200 Nogami and Li (2003)
La 17 18 19 20(yr)
Time ti
yer m
: Average excess pore pressure for each layer
e: Excess pore pressure vs depth

drawn RW client: -
approved project: -
date 6 April 2008 title:
SPECCON verification: Nogami and Li (2003), CASE 3
scale NTS
Page 2 of 2 original size A3 project no: - figure no: FIGURE 1b
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri2c
SPECCONv1_01
by Rohan Walker
Parameter Symbol Unit
# of series terms 40
Total stress change Ds kPa 1
Drainage condition 1=one way, 2=two way 1
Reference layer 1
Unit weight of water gw kN/m3 10
yr 0
Construction time tc days 0 ch/cv*(h/re)2 1
seconds 0 kshsh/(re2kv) 5
Pseudo vertical time factor (/t) dTv=cv/H2 yr-1 1.55E-01
Pseudo horizontal time factor (/t) dTh=2ch/re2m yr-1 #VALUE!
Depth of profile H m 2.54
Time factor multiplier 1
Layer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Layer thickness m 0.25 0.25 0.25 0.25 0.02 0.25 0.25 0.25 0.25 0.02 0.25 0.25
Volume compressibility mv m2/kN 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Vertical permeability kv m/yr 1 1 1 1 250 1 1 1 1 250 1 1
Horizontal permeability kh m/yr 1 1 1 1 250 1 1 1 1 250 1 1
Include drains TRUE/FALSE 1 1 1 1 1 1 1 1 1 1 1 1
Drain Pattern TRIANGLE or SQUARE TRI TRI TRI TRI TRI TRI TRI TRI TRI TRI TRI TRI
Drain Spacing Sp m 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619
Drain radius rw m 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Ratio of smear to drain radius s=rs/rw 1 1 1 1 1 1 1 1 1 1 1 1
Ratio of undisturbed horizontal
permeability to smear zone permeability at k=kh/k0 1 1 1 1 1 1 1 1 1 1 1 1
drain soil interface
Type of smear zone* I,C,L,P,LX I I I I I I I I I I I I
Influence radius re m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Smear zone radius rs m 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Ratio of influence to drain radius n=re/rw 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0
Smear zone and geometry parameter m #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
m/day 0.0027379 0.0027379 0.0027379 0.0027379 0.6844814 0.0027379 0.0027379 0.0027379 0.0027379 0.6844814 0.0027379 0.0027379
Vertical permeability kv
m/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 7.922E-06 3.169E-08 3.169E-08 3.169E-08 3.169E-08 7.922E-06 3.169E-08 3.169E-08
m/day 0.0027379 0.0027379 0.0027379 0.0027379 0.6844814 0.0027379 0.0027379 0.0027379 0.0027379 0.6844814 0.0027379 0.0027379
Horizontal permeability kh
m/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 7.922E-06 3.169E-08 3.169E-08 3.169E-08 3.169E-08 7.922E-06 3.169E-08 3.169E-08
Ratio of horizontal to vertical permeability kh/kv 1 1 1 1 1 1 1 1 1 1 1 1
m2/yr 1 1 1 1 250 1 1 1 1 250 1 1
Vertical coeficent of consolidation cv m2/day 0.0027379 0.0027379 0.0027379 0.0027379 0.6844814 0.0027379 0.0027379 0.0027379 0.0027379 0.6844814 0.0027379 0.0027379
m2/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 7.922E-06 3.169E-08 3.169E-08 3.169E-08 3.169E-08 7.922E-06 3.169E-08 3.169E-08
m2/yr 1 1 1 1 250 1 1 1 1 250 1 1
Horizontal coeficent of consolidation ch m2/day 0.0027379 0.0027379 0.0027379 0.0027379 0.6844814 0.0027379 0.0027379 0.0027379 0.0027379 0.6844814 0.0027379 0.0027379
m2/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 7.922E-06 3.169E-08 3.169E-08 3.169E-08 3.169E-08 7.922E-06 3.169E-08 3.169E-08
Ratio of horizontal to vertical consolidation ch/cv
coefficient 1 1 1 1 1 1 1 1 1 1 1 1
Lumped drain parameter h=kh/re2m m-1yr-1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
kv/kvREF 1 1 1 1 250 1 1 1 1 250 1 1
h/hREF #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
mv/mvREF 1 1 1 1 1 1 1 1 1 1 1 1

*I=Ideal(no smear), C=constant permeability, L=linear perm., P=parabolic perm., LX=linear overlapping drawn RW client: -
approved project: -
date 06-April-2008 title:
SPECCON verification: Nogami and Li (2003)
scale NTS
Page 1 of 2 original size A3 project no: - figure no: FIGURE 1a
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri3
1.2 0 10 20 30 40 50 60 70 80 90
0

1
0.5

0.8
1
Average excess pore pressure (kPa)

Depth (m)
0.6 1.5

10

0.4 2

0.2 2.5

0 3
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45
Pore Pressure (kPa)
Time (yr)
0.010 0.100 0.400
Layer:
Nogami and Li (2003) Nogami and Li (2003) Nogami and Li (2003)
Load
5
ALL
6
1
7
2
8
3
9
4
10
ti
11 12 13 14 15 16 m
17 18 19
Average excess pore pressure for each layer
20 e: Excess pore pressure vs depth

drawn RW client: -
approved project: -
date 6 April 2008 title:
SPECCON verification: Nogami and Li (2003)
scale NTS
Page 2 of 2 original size A3 project no: - figure no: FIGURE 1b
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri3
SPECCONv1_01
by Rohan Walker
Parameter Symbol Unit
# of series terms 35
Total stress change Ds kPa 100
Drainage condition 1=one way, 2=two way 1
Reference layer 1
Unit weight of water gw kN/m3 10
yr 0
Construction time tc days 0 H2ch/re2cv 100
seconds 0
Pseudo vertical time factor (/t) dTv=cv/H2 yr-1 1.00E-02
Pseudo horizontal time factor (/t) dTh=2ch/re m 2
yr-1 #VALUE!
Depth of profile H m 10
Time factor multiplier 1
Layer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Layer thickness m 1 1 1 1 1 1 1 1 1 1
Volume compressibility mv m2/kN 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Vertical permeability kv m/yr 1 1 1 1 1 1 1 1 1 1
Horizontal permeability kh m/yr 1 1 1 1 1 1 1 1 1 1
Include drains TRUE/FALSE 1 1 1 1 1 0 0 0 0 0
Drain Pattern TRIANGLE or SQUARE TRI TRI TRI TRI TRI TRI TRI TRI TRI TRI
Drain Spacing Sp m 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619 1.9047619
Drain radius rw m 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Ratio of smear to drain radius s=rs/rw 5 5 5 5 5 5 5 5 5 5
Ratio of undisturbed horizontal
permeability to smear zone permeability at k=kh/k0 5 5 5 5 5 5 5 5 5 5
drain soil interface
Type of smear zone* I,C,L,P,LX I I I I I I I I I I
Influence radius re m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Smear zone radius rs m 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Ratio of influence to drain radius n=re/rw 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
Smear zone and geometry parameter m #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
m/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379
Vertical permeability kv
m/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08
m/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379
Horizontal permeability kh
m/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08
Ratio of horizontal to vertical permeability kh/kv 1 1 1 1 1 1 1 1 1 1
m2/yr 1 1 1 1 1 1 1 1 1 1
Vertical coeficent of consolidation cv m2/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379
m2/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08
m2/yr 1 1 1 1 1 1 1 1 1 1
Horizontal coeficent of consolidation ch m2/day 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379 0.0027379
m2/s 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08 3.169E-08
Ratio of horizontal to vertical consolidation ch/cv
coefficient 1 1 1 1 1 1 1 1 1 1
Lumped drain parameter h=kh/re2m m-1yr-1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 0 0
kv/kvREF 1 1 1 1 1 1 1 1 1 1
h/hREF #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
mv/mvREF 1 1 1 1 1 1 1 1 1 1

*I=Ideal(no smear), C=constant permeability, L=linear perm., P=parabolic perm., LX=linear overlapping drawn RW client: -
approved project: -
date 06-April-2008 title:
title
scale NTS
Page 1 of 2 original size A3 project no: - figure no: FIGURE 1a
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri4
100
120 0 10 20 30 40 50 60 70 80 90
0 90

80

70
100 2
60

Pore pressure
50

40
4
80 30
Average excess pore pressure (kPa)

Depth (m)
20

6 10
10

0
60 0.01 0.1 1 10 100

Time Factor (cht/re2)


8

2 4
6 8
40 10 Runesson et al (1985)

10

20 12

Pore Pressure (kPa)

0.001 0.001 0.001 0.001


0 0.001 0.001 0.001 0.001
0 5 10 15 20 25 30 35 40 45 0.001 0.001 0.001 0.001
time:
0.001 0.002 0.002 0.003
Time (yr) 0.005 0.008 0.012 0.017
0.026 0.039 0.059 0.089
Layer:
Load ALL 1 2 3 4 0.133 0.200 0.301 0.452
5 6 7 8 9 10 0.679 1.021 1.535 2.307
11 12 13 14 15 16 3.468 5.213 7.835 11.777
17 18 19 20 17.703 26.611 40.000
Average excess pore pressure for each layer Excess pore pressure vs depth

drawn RW client: -
approved project: -
date 6 April 2008 title:
SPECCON verification: Runesson et al (1985)
scale NTS
Page 2 of 2 original size A3 project no: - figure no: FIGURE 1b
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri4
SPECCONv1_01
by Rohan Walker
Parameter Symbol Unit
# of series terms 20
Total stress change Ds kPa 1
Drainage condition 1=one way, 2=two way 2
Reference layer 1
Unit weight of water gw kN/m3 10
yr 0
Construction time tc days 0
seconds 0
Pseudo vertical time factor (/t) dTv=cv/H2 yr-1 2.30E-03
Pseudo horizontal time factor (/t) dTh=2ch/re m 2
yr-1 0
Depth of profile H m 24.38
Time factor multiplier 1
Layer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Layer thickness m 0.7625 0.7625 0.7625 0.7625 1.5225 1.5225 1.5225 1.5225 2.2875 2.2875 2.2875 2.2875 1.5225 1.5225 1.5225 1.5225
Volume compressibility mv m2/kN 6.41E-05 6.41E-05 6.41E-05 6.41E-05 4.07E-05 4.07E-05 4.07E-05 4.07E-05 2.03E-05 2.03E-05 2.03E-05 2.03E-05 4.07E-05 4.07E-05 4.07E-05 4.07E-05
Vertical permeability kv m/yr 0.0008767 0.0008767 0.0008767 0.0008767 0.0026049 0.0026049 0.0026049 0.0026049 0.000369 0.000369 0.000369 0.000369 0.0009272 0.0009272 0.0009272 0.0009272
Horizontal permeability kh m/yr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Include drains TRUE/FALSE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Drain Pattern TRIANGLE or SQUARE
Drain Spacing Sp m
Drain radius rw m
Ratio of smear to drain radius s=rs/rw

Ratio of undisturbed horizontal


permeability to smear zone permeability at k=kh/k0
drain soil interface
Type of smear zone* I,C,L,P,LX
Influence radius re m 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Smear zone radius rs m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Ratio of influence to drain radius n=re/rw #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Smear zone and geometry parameter m 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
m/day 2.4E-06 2.4E-06 2.4E-06 2.4E-06 7.132E-06 7.132E-06 7.132E-06 7.132E-06 1.01E-06 1.01E-06 1.01E-06 1.01E-06 2.538E-06 2.538E-06 2.538E-06 2.538E-06
Vertical permeability kv
m/s 2.778E-11 2.778E-11 2.778E-11 2.778E-11 8.255E-11 8.255E-11 8.255E-11 8.255E-11 1.169E-11 1.169E-11 1.169E-11 1.169E-11 2.938E-11 2.938E-11 2.938E-11 2.938E-11
m/day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Horizontal permeability kh
m/s 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Ratio of horizontal to vertical permeability kh/kv 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
m /yr
2
1.367708 1.367708 1.367708 1.367708 6.4001808 6.4001808 6.4001808 6.4001808 1.8175921 1.8175921 1.8175921 1.8175921 2.2780305 2.2780305 2.2780305 2.2780305
Vertical coeficent of consolidation cv m2/day 0.0037447 0.0037447 0.0037447 0.0037447 0.0175232 0.0175232 0.0175232 0.0175232 0.0049764 0.0049764 0.0049764 0.0049764 0.0062371 0.0062371 0.0062371 0.0062371
m2/s 4.334E-08 4.334E-08 4.334E-08 4.334E-08 2.028E-07 2.028E-07 2.028E-07 2.028E-07 5.76E-08 5.76E-08 5.76E-08 5.76E-08 7.219E-08 7.219E-08 7.219E-08 7.219E-08
m2/yr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Horizontal coeficent of consolidation ch m2/day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
m2/s 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Ratio of horizontal to vertical consolidation ch/cv
coefficient 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lumped drain parameter h=kh/re2m m-1yr-1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
kv/kvREF 1 1 1 1 2.971223 2.971223 2.971223 2.971223 0.4208633 0.4208633 0.4208633 0.4208633 1.057554 1.057554 1.057554 1.057554
h/hREF 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
mv/mvREF 1 1 1 1 0.6349454 0.6349454 0.6349454 0.6349454 0.3166927 0.3166927 0.3166927 0.3166927 0.6349454 0.6349454 0.6349454 0.6349454

*I=Ideal(no smear), C=constant permeability, L=linear perm., P=parabolic perm., LX=linear overlapping drawn RW client: -
approved project: -
date 06-April-2008 title:
SPECCON verification: Schiffman and Stein (1970)
scale NTS
Page 1 of 2 original size A3 project no: - figure no: FIGURE 1a
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri5
1.2 -10 0 10 20 30 40 50 60 70 80 90
0

1
5

0.8
Average excess pore pressure (kPa)

10

0.6

Depth (m)
15

10

0.4

20

0.2

25

0
0 5 10 15 20 25

Time (yr) 30

Layer:
Pore Pressure (kPa)
Load ALL 1 2 3 4
5 6 7 8 9 10
11 12 13 14 15 16 2.027 8.027
time:
17 18 19 20 19.712 Schiffman and stein (1970)
Average excess pore pressure for each layer Excess pore pressure vs depth

drawn RW client: -
approved project: -
date 6 April 2008 title:
SPECCON verification: Schiffman and Stein (1970)
scale NTS
Page 2 of 2 original size A3 project no: - figure no: FIGURE 1b
'file:///conversion/tmp/activity_task_scratch/565547996.xls'#$Veri5

You might also like