erection modules start from 13 to 24.

STOCK STOCK STOCK STOCK STOCK STOCK


YARD YARD YARD YARD YARD YARD

Incoming material will be placed behind erection area.

Factory I : Workshop Bekasi Bantar Gebang Jl. Pangkalan II, Kota Bekasi, Jawa Barat 17152
Factory II : Workshop Cileungsi Jl. Raya Narogong KM 18 Limununggal Pasir Angin Kec. Cileungsi Bogor

Client : PT. ADHI KARYA (PERSERO) TBK

Drawing No : -
Project : HEAVY MAINTENANCE BUILDING DEPO LRT
Approved by : -
PT WIRYA KRENINDO PERKASA
Title : ERECTION FLOW
ERECTION FLOW HEAVY MAINTENANCE

Drawing by : Checked by : Approved by : Scale : 1 : 600


GT NN DA
Date : 24.12.2021 Date : 24.12.2021 Date : 24.12.2021 Revisi No :
Acces area

Erection area
Laydown Area

Factory I : Workshop Bekasi Bantar Gebang Jl. Pangkalan II, Kota Bekasi, Jawa Barat 17152
Factory II : Workshop Cileungsi Jl. Raya Narogong KM 18 Limununggal Pasir Angin Kec. Cileungsi Bogor

Client : PT. ADHI KARYA (PERSERO) TBK

Drawing No : -
Project : HEAVY MAINTENANCE BUILDING DEPO LRT
Approved by : -
PT WIRYA KRENINDO PERKASA
Title : WORKING LOAD CRANE ON CONCRETE SLAB
ERECTION METHOD HEAVY MAINTENANCE

Drawing by : Checked by : Approved by : Scale : 1 : 600


GT NN DA
Date : 24.12.2021 Date : 24.12.2021 Date : 24.12.2021 Revisi No :