Professional Documents
Culture Documents
BESI 10
BESI
TRIPLEX 5 mm COR
PAPAN COR
PASIR
KAWAT BENDRAT
PAKU
KASO 5X5
7,200,000
86,400,000
259,200,000
LANTAI DAK BALOK
500 BTG panjang cor 220 m
120
besi 12 126 btg
besi 8 behel 110 btg
236
736 BESI 23,600,000 236 BTG
73,600,000 SEMEN 8,250,000 110 SAK
BENDRAT 875,000 25 KG
28800 PAKU 1,100,000 2 DOS
2,250,000 PASIR 6,600,000 11 RIT
78
15,625,000 40,425,000
3 KUBIK
6,000,000
110
150 225
22,500,000 150
30
18,000,000
50 KG
1,750,000
4 DOS
2,200,000
3 KUBIK
6,000,000
145,675,000
225
RENCANA ANGGARAN BIAYA
REHAB ATAP/KAP MASJID JAMI AL MUJAHIDIN
DESA AHUHU KEC. MELUHU KAB. KONAWE
HARGA
NO URAIAN VOL SAT JUMLAH
SATUAN
A KUBAH MASJID
1 Kubah Induk Enamel 1 Bh 350,000,000 350,000,000
JUMLAH 350,000,000
B COR RING BALOK
1 Besi 12 126 Btg 100,000 12,600,000
2 Besi 10 110 Btg 100,000 11,000,000
3 Semen 110 Zak 75,000 8,250,000
4 Kawat Bendrat 25 Kg 35,000 875,000
5 Pasir Cor 11 Rit 600,000 6,600,000
6 Paku 2 Doz 550,000 1,100,000
JUMLAH 40,425,000
B COR ATAP/DAK
1 Besi 10 500 Btg 100,000 50,000,000
2 Triplex 5 mm Cor 78 Lbt 200,000 15,600,000
3 Papan Cor 3 M3 2,000,000 6,000,000
4 Kaso 5X5 3 M3 2,000,000 6,000,000
5 Semen 150 Zak 75,000 11,250,000
6 Pasir Cor 25 Rit 600,000 15,000,000
7 Kawat Bendrat 25 Kg 35,000 875,000
8 Paku 2 Doz 550,000 1,100,000
JUMLAH 105,825,000
JUMLAH TOTAL I+II+III 496,250,000