NO. URAIAN PEKERJAAN VOLUME SAT
HARGA
A KEBUTUHAN MATERIAL ALAM
1 Pasir Pasang kapasitas 8m3 3.00 Truck 1,550,000
2 pasir cor (pasir Kediri )8m3/truck 2.00 Truck 1,850,000
4 Tenslah/ batu koral 1x2 kapasitas 5,5m3 1.00 Truck 1,400,000
5 Bata ringan 24.00 m3 650,000
6 Semen perekat 26.00 zak 65,000
7 Pc. Semen 40 kg 400.00 zak 45,000
8 adibon 6.00 klg 75,000
9 aditon 6.00 klg 75,000
10 loster 20x20 290.00 bh 22,000
SUB TOTAL
B MATERIAL BESI
1 Paku 10 cm 1.00 duss 450,000
2 paku 7 cm 1.00 duss 450,000
3 paku 5Cm 1.00 duss 450,000
4 Paku 2 cm 1.00 duss 450,000
5 Paku Beton 5 cm 6.00 duss 65,000
6 paku beton 3cm 4.00 duss 55,000
7 paku beton 2 cm 4.00 duss 45,000
8 Paku Eternite/secrup gibsum 4.00 pak 175,000
9 Paku Eternite/secrup gibsum ( Putih ) 5.00 pak 175,000
10 Besi Ø6" 83.00 Btg 28,000
11 besi Ø8" 75.00 Btg 45,000
12 Besi Ø10" 18.00 Btg 75,000
13 Besi Ø12" 32.00 Btg 90,000
14 Besi Ø13" 48.00 Btg 130,000
15 benrat 2.00 roll 350,000
SUB TOTAL
C PEKERJAAN PENGECATAN
1 semen Putih 3 Roda 5.00 zak 88,500
2 Lem Vock (Rajawali ) 2.00 box 450,000
3 Kalsium GM 800 18.00 zak 29,000
4 Alkali solitex 20 kg/pel 4.00 pell 488,750
5 Alkasit 6.00 duss 11,500
6 Amplas 240 50.00 m' 9,500
7 Amplas no.120 50.00 m' 10,500
8 Amplas No. 80 50.00 m' 11,000
9 Cat Interior nipon paint 4.00 pell 1,450,000
10 Cat Exterior nipon paint 6.00 pell 1,200,000
11 Cat Plafond catilac 3.00 pell 500,000
12 Cat Genteng nipon paint 2.00 pell 600,000
14 waterprofing 2.00 gln 650,000
16 Dempu kayu Alfaglos /Galon 15.00 gln 95,000
18 Epoxsi 15.00 kg 50,000
20 Cat Finis Duco 20.00 kg 57,000
22 Tiner A spesial 85.00 ltr 17,000
24 Coating batu candi ex. Propand 17.00 klg 45,000
26 kuas 4 10.00 bh 17,000
28 kuas 3 10.00 bh 15,000
30 kuas 2,5 7.00 bh 12,000
32 kuas roll 6.00 bh 35,000
34 refile roll 6.00 bh 25,000
36 roll mate kecil 4.00 bh 28,000
SUB TOTAL
D PEKERJAAN SANITAIR ( PIPA )
1 Pipa PVC 4" 8.00 Btg 143,000
2 Pipa PVC 3" 14.00 Btg 90,000
3 Pipa PVC 2" 6.00 Btg 750,000
4 Pipa 3/4" 15.00 Btg 29,000
5 Pipa 1/2" 6.00 Btg 24,000
6 Pipa Flexsibel Water Hider ( air Panas ) 45.00 m' 40,000
7 Sambungan air panas 3.00 bh 15,000
knie wespek 10.00 bh 18,000
tee wspek 7.00 bh 18,000
dobel nepel air panas 5.00 bh 7,000
8 Knie Drat Dalam Lapis Kuniangan 1/2" 3.00 bh 9,000
9 Sock 3/4 - 1/2 10.00 bh 3,500
10 Selatip 5.00 bh 5,000
11 Knie 1/2 12.00 bh 3,500
12 Knie 3/4 12.00 bh 3,500
13 Knie 2" 3.00 bh 19,000
14 Knie 3" 3.00 bh 24,000
15 Knie 4" 3.00 bh 35,000
16 Tee 1/2 6.00 bh 3,500
17 Tee 1/3 6.00 bh 3,500
18 Tee 2" 3.00 bh 19,000
19 Tee 3" 3.00 bh 24,000
20 Tee 4" 2.00 bh 35,000
21 Pluq sock 1/2 7.00 bh 1,500
23 Stop Kran 3/4 3.00 bh 20,000
24 Lem PVC 3.00 Klg 55,000
25 klem pvc 3/4-1/2 1.00 slop 55,000
31 Avor Lantai 6.00 bh 20,000
SUB TOTAL
E PEKERJAAN PENGGANTUNG PLAFOND Dan ATAP
1 Ctruss 75 180.00 bj 55,000
2 a Truss 35 205.00 bj 27,000
3 Baut drailing C tuss 8.00 duss 145,000
4 Baut dreling A truss 4.00 duss 145,000
5 Dinabol 8-8cm 3.00 duss 85,000
6 Calsiboard 110 x220 x 2.5mm 25.00 Lbr 55,000
7 Gibsum 120x240 320.00 lbr 55,000
8 Lis Gipsum R. 12 cm 6+6cm 900.00 m' 15,000
8 Compon gibsum 12.00 Zak 66,000
9 Lak Ban 18.00 Pak 13,000
12 Resplank GRC 210x30x9mm 14.00 Lbr 55,000
13 Talang Galfalum 60 x 2,4mm 54.00 m' 40,000
14 Jorongan Talang PVC 10.00 bh 7,000
15 holo galfalum 40x40 418.00 btg 22,000
16 holo galfalum 40x20 298.00 btg 17,000
19 kawat 2mm 2.00 pak 115,000
24 genteng beton stok gudang 3,876.00 bj 27,000
25 wuwung beton stok gudang 195.00 bj 35,000
26 talang galfalum T.0,4x90 20.00 m' 8,000
27 baut sekrup gibsum 8.00 duss 135,000
28 baut sekrup gibsum 4.00 duss 135,000
SUB TOTAL
F MATERIAL PENANGKAL PETIR
1 Pas Konekto sleeve 3.00 bh
2 pas Box sambunga/test box 1.00 set
3 pas TGC ( tancient ground clamp ) 12.00 bh
4 pas kabel BC 20.00 m
5 Pas Grond rood 2.00 m
6 pas stik jarum penangkal petir kap 10 m 3.00 bh
7 Kemsambunga kabl BC
SUB TOTAL
G PEKERJAAN INSTALANSI LISTRIK
1 Kabel NYA 2x2,5x100m 4.00 roll 950,000
2 Kabel NYM 3x2,5mm 2.00 roll 1,350,000
3 KabelInduk10A 5x4m 25.00 mtr
4 isolasi Listrik 5.00 Pak 17,500
5 Paralon Listrik 20.00 Btg 2,200
6 Pipa Sepiral 17.00 bh 1,500
7 Embo Doss 3.00 pak 35,000
8 Tee doss 1.00 pak 35,000
9 konextor antena tanah philip 3.00 bh 26,000
10 Saklar Seri philip 12.00 bh 26,000
11 Saklar Tunggal philip 15.00 bh 26,500
12 Stop Kontak philip 35.00 bh 22,000
13 Box MCB ex. Presto 2.00 bh 30,000
14 MC 3 Fase 2.00 bh
15 MCB 6A 4.00 bh 40,000
16 Downlight 4" philip 47.00 bh 55,000
18 Box downlight luar 19.00 bh 78,000
19 lampu LED 1.50 roll
20 konektor trafo lampu lide 6.00 bh
21 Breket 1.00 bh 150,000
22 Hande Panel 1.00 bh 250,000
SUB TOTAL
H MATERIAL KAYU
1 kayu 5x7 meranti stok gudang 3.80 m3 11,700,000
2 kayu 3x5 meranti stok gudang 1.70 m3 11,700,000
3 triplek 9mm 55.00 lbr 117,000
SUB TOTAL
I ALAT KERJA
1 Bor magnet besar ( makita ) 1.00 bh 4,500,000
2 bor mesin kecil ( makaita ) 1.00 bh 550,000
3 mata setrous D 25cm 1.00 bh 500,000
4 Kerekan ( roda benang ) 1.00 bh 75,000
5 Tambang putih ( UBG ) 1cm 20.00 m 6,500
6 timba cor 30.00 bh 9,000
7 Ject bress sewa 20.00 bh
8 U brase sewa 20.00 set
9 Rescafolding sewa 45.00 set
10 Jidar/ holo galfalum 30x60 2.00 btg 150,000
11 gunting besi duduk 1.00 bh 700,000
12 gunting tangan besi 1.00 bh 350,000
13 sepry gon spet 1.00 set 250,000
14 slang angin 15.00 m 4,500
15 klem pipa 10.00 bh 2,500
16 alat ukur ( tripot waterpas ) 1.00 set 7,500,000
17 bak ukur 1.00 bh 300,000
18 slang timbang 20.00 m 1,500
19 kabel serabut 2x1,5 50.00 m 4,500
20 ject ( steker )+ abe power 10 m 4.00 bh 25,000
21 stopkontak singgle 3.00 bh 25,000
22 Pompa air ( nasional ) 1.00 bh 450,000
23 kawat ayak pasir 8.00 m2 12,000
24 kabel las 15.00 m 45,000
25 Stamper 1.00 bh 7,500,000
26 Arco 2.00 bh
27 cangkul 4.00 bh
28 sekrop 3.00 bh
29 Ganco 2.00 bh
30 Kubut Besi 19 4.00 bh
31 Bodem 2-3 k 2.00 bh
32 Sepatu Bot 5.00 set
33 Sarung tangan 6.00 pak
34 betel besar 4"3",2",1.5 4.00 bh
35 Jeck hamer Beton 2.00 bh
SUB TOTAL
J MATERIAL KUSEN PINTU ( accesoris )

SUB TOTAL
K MATERIAL SANITARY
1 pas klosed duduk ex.toto 3.00 set
2 Pas wastafel ex.toto 2.00 set
3 Pas shower panas dingin + handle ex.toto 3.00 set
4 Jet shower ex.toto 3.00 set
5 Kran wastafel panas dingin ex.toto 2.00 set
6 Kicensing ex.toto 1.00 set
7 Karan kicent ex.toto 1.00 set
8 Hanger handuk 3.00 set
9 Tandan air 1200 stenlis 2.00 bh

SUB TOTAL
L MATERIAL LANTAI
1 Keramik dinding kamar mandi lantai 1 79.00 m²
2 Keramik lantai kamar mandi lantai 1 22.20 m²
3 kolkolan/plin lantai 10 cm lantai 1 178.00 m'
4 keramik dapur lantai 1 3.00 m²
5 keramik lantai dapur lantai 1 11.00 m²
6 Penambahan lantai geranit lantai 1 pintu masuk 30.00 m²
7 Keramik Area cuci lantai 2 Unpolish 6.00 m²
8 Keramik dinding kamar mandi lantai 2 79.00 m²
9 Keramik lantai kamar mandi lantai 2 22.20 m²
10 Keramik ART lantai 2 8.00 m²
11 kolkolan/plint lantai 10 cm lantai 2 118.00 m'
SUB TOTAL
TOTAL KOMULATIF
IPIL
. UNIMAS WAHANAINDO NIAGA 287.5
JL. Pepelegi, Waru - Sidoarjo 61258

Telp. 031 8531995

Email. Unimasgroup&yahoo.com

SEPTEMBER OCTOBER
TOTAL BIAYA Distrib
usi QTY pembelian QTY pembelian QTY pembelian QTY

4,650,000 3 1 1,550,000 - 1 1,550,000


3,700,000 2 1 1,850,000 - 1 1,850,000
1,400,000 1 1 1,400,000 - -
15,600,000 2 12 7,800,000 12 7,800,000 -
1,690,000 2 13 845,000 13 845,000 -
18,000,000 4 100 4,500,000 100 4,500,000 - 100
450,000 2 3 225,000 3 225,000 -
450,000 2 3 225,000 3 225,000 -
6,380,000 1
45,940,000

450,000 1 1.00 450,000 - -


450,000 1 1.00 450,000 - -
450,000 1 1.00 450,000 - -
450,000 1 1.00 450,000 - -
390,000 1 6.00 390,000 - -
220,000 3 2 110,000 1 55,000 1 55,000
180,000 3 2 90,000 1 45,000 1 45,000
700,000 2 2 350,000 2 350,000 -
875,000 3 2 350,000 2 350,000 1 175,000
2,324,000 3 30 840,000 30 840,000 23 644,000
3,375,000 3 15 675,000 20 900,000 40 1,800,000
1,350,000 2 9.00 675,000 9.00 675,000 -
2,880,000 2 16.00 1,440,000 16 1,440,000 -
6,240,000 2 24 3,120,000 24 3,120,000 -
700,000 1 - - 1 350,000
21,034,000

442,500 2 - - -
900,000 2 - - -
522,000 2 - - -
1,955,000 2 - - -
69,000 2 - - -
475,000 2 - - -
525,000 2 - - -
550,000 2 - - -
5,800,000 2 - - -
7,200,000 2 - - -
1,500,000 1 - - -
1,200,000 1 - - -
1,300,000 1 - - -
1,425,000 3 - - - 8
750,000 1 - - -
1,140,000 2 - - -
1,445,000 2 - - -
765,000 1 - - -
170,000 4 2 34,000 - 2 34,000
150,000 3 - - 3 45,000
84,000 3 - - 2 24,000
210,000 2 - - -
150,000 2 - - -
112,000 2 - - -
28,839,500

1,144,000 2 4 572,000 4 572,000


1,260,000 2 7 630,000 7 630,000
4,500,000 2 3 2,250,000 3 2,250,000
435,000 1 - 15 435,000 -
144,000 1 - 6 144,000 -
1,800,000 1 45 1,800,000 - -
45,000 1 3 45,000 - -
180,000 1 10 180,000 - -
126,000 1 7 126,000 - -
35,000 1 5 35,000 - -
27,000 1 3 27,000 - -
35,000 1 10 35,000 - -
25,000 1 5 25,000 - -
42,000 1 12 42,000 - -
42,000 1 12 42,000 - -
57,000 1 3 57,000 - -
72,000 1 3 72,000 - -
105,000 1 3 105,000 - -
21,000 1 6 21,000 - -
21,000 1 6 21,000 - -
57,000 1 3 57,000 - -
72,000 1 3 72,000 - -
70,000 1 2 70,000 - -
10,500 1 - - 7.00 10,500
60,000 1 3 60,000 - -
165,000 1 3 165,000 - -
55,000 1 1 55,000 - -
120,000 1 - - 5 100,000
10,725,500 - - -
- - -
9,900,000 1 - - 180 9,900,000
5,535,000 1 - - - 205
1,160,000 1 - - 8 1,160,000
580,000 1 - - - 4
255,000 1 - - - 3
1,375,000 1 - - -
17,600,000 2 - - -
13,500,000 - - -
792,000 - - -
234,000 - - -
770,000 - - -
2,160,000 - - -
70,000 - - -
9,196,000 2 - 209 4,598,000 - 209
5,066,000 2 - 149 2,533,000 - 149
230,000 1 - 2.00 230,000 -
104,652,000 - - -
6,825,000 - - -
160,000 - - -
1,080,000 8 1,080,000
540,000 4 540,000
162,630,000 - - -
- - -
1 - 3.00 - -
1 - 1.00 - -
1 - 12.00 - -
1 - 20.00 - -
1 - 2.00 - -
1 - 3.00 - -
- - -
- - -
- - -
3,800,000 2 2.00 1,900,000 2.00 1,900,000 -
2,700,000 2 1.00 1,350,000 1.00 1,350,000 -
1 - 1.00 - -
87,500 2 2.50 43,750 2.50 43,750 -
44,000 2 10.00 22,000 10.00 22,000 -
25,500 2 8.50 12,750 8.50 12,750 -
105,000 2 1.50 52,500 1.50 52,500 -
35,000 2 0.50 17,500 0.50 17,500 -
78,000 1 - - 3.00 78,000
312,000 1 - - 12.00 312,000
397,500 1 - - 15.00 397,500
770,000 1 - - 35.00 770,000
60,000 1 - - 2.00 60,000
1 - - 2.00 -
160,000 1 - - 4.00 160,000
2,585,000 1 - - 47.00 2,585,000
1,482,000 1 - - 19.00 1,482,000
1 1.50
1 6.00
150,000 1 - 1.00 150,000 -
250,000 1 - 1.00 250,000 -
12,641,500 - - -
- - -
1 - - -
1 - - -
6,435,000 3 - 10 1,170,000 20 2,340,000 25
6,435,000 - - -
- - - -
1 1.00 4,500,000 - -
550,000 1 1.00 550,000 - -
500,000 1 1.00 500,000 - -
75,000 1 1.00 75,000 - -
130,000 1 20.00 130,000 - -
270,000 1 30.00 270,000 - -
- 1 20.00 - - -
- 1 20.00 - - -
- 1 45.00 - - -
300,000 1 2.00 300,000 - -
700,000 1 1.00 700,000 - -
350,000 1 1.00 350,000 - -
250,000 1 1.00 250,000 - -
67,500 1 15.00 67,500 - -
25,000 1 10.00 25,000 - -
1 1.00 7,500,000 - -
1 1.00 300,000 - -
30,000 1 20.00 30,000 - -
225,000 1 50.00 225,000 - -
100,000 1 4.00 100,000 - -
75,000 1 3.00 75,000 - -
450,000 1 1.00 450,000 - -
96,000 1 8.00 96,000 - -
675,000 1 15.00 675,000 - -
7,500,000 1 1.00 7,500,000 - -
- 1 2.00 - - -
- 1 4.00 - - -
- 1 3.00 - - -
- 1 2.00 - - -
- 1 4.00 - - -
- 1 2.00 - - -
- 1 5.00 - - -
- 1 6.00 - - -
- 1 4.00 - - -
- 1 2.00 - - -
12,368,500 - - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
300,614,000
CTOBER NOVEMBER

pembelian QTY pembelian QTY pembelian

1 1,550,000
- - -
- - -
- - -
- - -
4,500,000 - 100 4,500,000
- - -
- - -
290 6,380,000

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - - 45
- - -
- - -
- - -
- - -

- 3 265,500 2 177,000
- 1 450,000 1 450,000
- 9 261,000 9 261,000
- 2 977,500 2 977,500
- 3 34,500 3 34,500
- 25 237,500 25 237,500
- 25 262,500 25 262,500
- 25 275,000 25 275,000
- 2 2,900,000 2 2,900,000
- 3 3,600,000 3 3,600,000
- 2 1,000,000 1 500,000
- 2 1,200,000 -
- 2 1,300,000 -
760,000 - 7 665,000
- - -
- - -
- - -
- - -
- 6 102,000 -
- 4 60,000 3 45,000
- 3 36,000 2 24,000
- 3 105,000 3 105,000
- 3 75,000 3 75,000
- 2 56,000 2 56,000

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
5,535,000 - -
- - -
580,000 - -
255,000 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
4,598,000 - -
2,533,000 - -
- - -
- 3,876 104,652,000 -
- 195 6,825,000 -
- 20 160,000 -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
-
-
- - -
- - -
- - -
- - -
- - -
- - -
2,925,000 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
ESTIMATE JASA TENAGA EXTERIOR ,STRUKTUR, ATAP
Pekerjaan : REHABILITASI DAN NORMALISAI BANGUNAN RUMAH PT. UNIMAS WAHANA INDO NIAGA
Lokasi : Perum UNIMAS GARDEN JL. Pepelegi, Waru - Sidoarjo 61258
Block. f.01 Type 5 Telp. 031 8531995
Anggaran : AGUSTUS 2020 Email. Unimasgroup&yahoo.com
SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT TOTAL BIAYA PROSEN Agustus September October November
HARGA 25-04 7-18 21-02 05-16 19-30 02- 13 16-28

A PEKERJAAN PERSIAPAN
1 Pembongkaran Kusen pintu + Jendela Bopenlis + Kaca 12.00 bh 25,000 300,000 0.181 0.181
2 Pembongkaran Dinding bata Merah 126.00 m² 17,500 2,205,000 1.330 0.665 0.665
3 Kupas dan kerok cat dinding lama 75.00 m² 5,000 375,000 0.226 0.113 0.113
4 Bongkar Joglo 9.00 m² 250,000 2,250,000 1.357 1.357
5 bongkar balok balok penghubung 17.00 m 35,000 595,000 0.359 0.179 0.179
6 bngkar resplank beton 11.00 m² 35,000 385,000 0.232 0.116 0.116
7 Bogkar nok dan genten 220.00 m² 12,000 2,640,000 1.592 1.592
8 bongkar rengusuk + resplank kayu 220.00 m² 17,500 3,850,000 2.322 1.161 1.161
9 bongkar balok dan kuda2 kayu 220.00 m² 35,000 7,700,000 4.644 2.322 2.322
10 Pembersihan Bak Kontrol + Bak Saluran Air Bersih 1.00 ls 500,000 500,000 0.302
SUB TOTAL 20,800,000
B PEKERJAAN TANAH
1 Galian pondasi setempat 100x100x100cm 7.00 ttk 45,000.00 315,000 0.190 0.190
2 Galian Setrous D 25 - 400 cm 14.00 ttk 90,000.00 1,260,000 0.760 0.760
3 Galian Sloff 25x400 21.00 m 35,000.00 735,000 0.443 0.443
4 Urug Pasir bawah pondasi 16.00 m2 5,000.00 80,000 0.048 0.048
5 Urug Tanah kembali 17.00 m 5,000.00 85,000 0.051 0.051
6 Pemadatan Urugan ( Vibrator ) 20.40 m2 5,000.00 102,000 0.062 0.062
SUB TOTAL 2,577,000
C PEKERJAAN SETRUCTUR BETON lantai 1
1 Rabat Lantai kerja T.5cm 16.80 m2 27,500 462,000 0.279 0.279
- Cor setrous D 25 - 400 cm 14.00 ttk 50,000 700,000 0.422 0.422
2 Pekerjaan Sloff 25x30
- Begisting Sloff 25x 30 12.60 m² 26,000 327,600 0.198 0.198
- Pembesian Slof 6Ø13 < Ø8-20cm 153.30 kg 4,000 613,200 0.370 0.370
- Pek cor sloff 25x30 + Pembongkaran begisting 21.00 m 45,000 945,000 0.570 0.570
3 PekerjaanKolom 15x30 0.000
- Begisting kolom 15x30 21.00 m² 26,000 546,000 0.329 0.329
- Pembesian Kolom 6Ø13 < Ø6-20cm 245.00 kg 4,000 980,000 0.591 0.591
- Pek cor kolom 15x30 + Pembongkaran begisting 28.00 m 45,000 1,260,000 0.760 0.760
4 Pekerjaan Balok 25x30 0.000 0.000
- Begisting Balok 20x 30 21.00 m² 26,000 546,000 0.329 0.329
- Pembesian balok 6Ø13 < Ø6-20cm 226.80 kg 4,000 907,200 0.547 0.547
- Pek cor Balok 15x30 + Pembongkaran begisting 21.00 m 45,000 945,000 0.570 0.570
5 Pek cor Balok latai 15x15 include begisting+ pembesian 48.00 m 75,000 3,600,000 2.171 2.171
SUB TOTAL 11,832,000
D PEKERJAAN SETRUCTUR BETON lantai 2
1 PekerjaanKolom 20x25
- Begisting kolom 20x25 37.00 m² 26,000 962,000 0.580 0.580
- Pembesian Kolom 6Ø13 < Ø8-20cm 385.00 kg 4,000 1,540,000 0.929 0.929
- Pek cor kolom 25x30 + Pembongkaran begisting 44.00 m 35,000 1,540,000 0.929 0.929
2 Pekerjaan Balok 25x30 -
- Begisting Balok 25x 30 73.20 m² 26,000 1,903,200 1.148 1.148
- Pembesian balok 6Ø13 < Ø8-20cm 1,275.00 kg 4,000 5,100,000 3.076 3.076
- Pek cor Balok 25x30 + Pembongkaran begisting 61.00 m 35,000 2,135,000 1.288 1.288
3 Pekerjaan Cor Plat T.12 cm -
- Begisting Plat lantai kayu 5x7 + triplek 9mm 20.00 m² 80,000 1,600,000 0.965 0.965
- Pembesian plat lantai doble Ø08-20cm 700.00 kg 4,000 2,800,000 1.689 1.689
- pek cor Plat Lantai K. 250+ fibrator 20.00 m² 175,000 3,500,000 2.111 2.111
- pek. bongkaran begisting + perapian rongga cor 20.00 m² 9,000 180,000 0.109 0.109
5 Pekerjaan Cor Plat Kanopi ( over stex) + Resplank T.8 cm -
- Begisting Plat lantai kayu 5x7 + triplek 9mm 6.00 m² 80,000 480,000 0.290 0.290
- Pembesian plat lantai doble Ø08-20cm 270.00 kg 4,000 1,080,000 0.651 0.651
- pek cor Plat Lantai K. 250+ fibrator 6.00 m² 175,000 1,050,000 0.633 0.633
- pek. bongkaran begisting + perapian rongga cor 6.00 m² 9,000 54,000 0.033 0.033
2 Pekerjaan Balok Gantung25x30 -
- Begisting Balok 25x 30 38.00 m² 45,000 1,710,000 1.031 1.031
- Pembesian balok 6Ø13 < Ø8-20cm 1,330.00 kg 4,000 5,320,000 3.209 3.209
- Pek cor Balok 25x30 + Pembongkaran begisting 38.00 m 90,000 3,420,000 2.063 2.063
6 Pek cor Balok latai 15x15 include begisting+ pembesian 27.00 m 75,000 2,025,000 1.221 0.611 0.611
7 Pemasangan resplank beton cetakan ( tempel )+ cor sambungan 75.00 m 60,000 4,500,000 2.714 1.357 1.357
8 Pemasangan resplank beton cetakan ( tempel )+ cor sambungan 165.00 m 45,000 7,425,000 4.479 2.239 2.239
SUB TOTAL 48,324,200
E PEKERJAAN PASANGAN
1 Pek Pasang Dinding bata merah 1: 6 lantai 1 84.00 m² 35,000 2,940,000 1.773 1.773
2 Pek Pasang Dinding bata merah 1: 2 lantai 2 100.80 m² 35,000 3,528,000 2.128 2.128
2 Pekerjaan Plesteran + acian lantai 1 184.80 m² 25,000 4,620,000 2.787 1.393 1.393
3 Pekerjaan Plesteran + acian lantai 2 221.76 m² 25,000 5,544,000 3.344 1.672 1.672
3 Pek Plesteran comprot ( kasar ) 17.00 m² 45,000 765,000 0.461
4 Pekerjaan plesteran kolom + balok 72.00 m² 35,000 2,520,000 1.520 1.520
6 Pekerjaan Benangan 528.00 m 7,500 3,960,000 2.389 1.194 1.194
8 Ps kasiplang onamen dinding 23.10 m² 65,000 1,501,500 0.906 0.906
SUB TOTAL 25,378,500
G PEKERJAAN PASANG ATAP DAN PLAFOND
1 Pek Greet Lantai Talang Beton EXISTING T. 3cm ( Mimbran bakar ) 72.00 m² 45,000 3,240,000 1.954 1.954
2 Pas Rangka Resplank + Calsiboard Resiplank P.30cm 47.00 m 35,000 1,645,000 0.992 0.992
2 Pas rangka kuda-kuda sestem kremona baja ringan 280.00 m² 90,000 25,200,000 15.200 5.067 5.067 5.067
5 Pas Genteng Beton 280.00 m² 15,000 4,200,000 2.533 2.533
6 Nok Bumbungan Genteng 72.00 m' 45,000 3,240,000 1.954 1.954
SUB TOTAL 37,525,000
H PEMASANGAN SANITAIR
3 Pas Saluran air Kotor Dan tranfer Pembuangan -
- Pipa PVC aw 4" 24.00 m' 20,000 480,000 0.290 0.145 0.145
- Pipa PVC aw 3" 45.00 m' 20,000 900,000 0.543 0.271 0.271
- Pipa PVC aw 2" 20.00 m' 20,000 400,000 0.241 0.121 0.121
SUB TOTAL 1,780,000
H PEMASANGAN INSTALANSI LISTRIK AN ENANGKAL PETIR
1 Pemasagan peangal petir
- Pas Konekto sleeve 3.00 bh 50,000 150,000 0.090 0.090
- pas Box sambunga/test box 5.00 set 15,000 75,000 0.045 0.045
- pas TGC ( tancient ground clamp ) 12.00 bh 7,500 90,000 0.054 0.054
- pas kabel BC 20.00 m 35,000 700,000 0.422 0.422
- Pas Grond rood galian 2.00 m 45,000 90,000 0.054 0.054
- pas stik jarum penangkal petir kap 10 m 3.00 bh 75,000 225,000 0.136 0.136
SUB TOTAL 1,330,000
I PEKERJAAN FINISING DAN PENGECATAN DAN FINISING
1 Pek Cat Genteng dan Bumbungan genteng 280.00 m² 17,500 4,900,000 2.956 2.956
2 Pek water Profing 118.30 m² 15,000 1,774,500 1.070 1.070
SUB TOTAL 6,674,500
K PEKERJAAN SAPTITENG kapasitas 3 m3
1 Galian tanah padas 7.50 m3 120,000 900,000 0.543 0.543
2 urug pasir bawah pondasi 3.75 m2 17,000 63,750 0.038 0.038
3 urugan tanah kembali 1.10 ls 45,000 49,500 0.030 0.030
4 cor lantai kerja 3.75 m2 45,000 168,750 0.102 0.102
5 pas bata umpak ( doble bata ) 9.50 m 55,000 522,500 0.315 0.315
6 pas kolom 15x15 16.00 m 55,000 880,000 0.531 0.531
7 pas balok beton 15x15 9.50 m 55,000 522,500 0.315 0.315
8 pas tutup plat beton saptitenk T.10 cm + pembesia, begisting 3.75 m2 250,000 937,500 0.565 0.565
9 istalansi resapan pipa 4" 1.00 ls 250,000 250,000 0.151 0.151
10 Pengadaan biutenk kapasitas 2.5m3 galian dan pemasangan 1.00 bh 1,200,000 1,200,000 0.724 0.724
11 Pembuatan resapan biotank 1.00 bh 450,000 450,000 0.271 0.271
SUB TOTAL 5,944,500
L PEKERJAAN LAIN_LAIN
1 Buang Puing Bongkaran ( Gragal ) 1.00 ls 2,500,000 2,500,000 1.508 0.503 0.503 0.503
2 Normalisasi saluran pembuangan air hujan 75.00 m 15,000 1,125,000 0.679 0.679
SUB TOTAL 3,625,000
Terbilang: TOTAL RENCANA 165,790,700 100 7.69 8.26 11.29 18.94 19.26 16.00 17.80
LUASAN BANGUNAN 514 322,550.00 - 7.69 15.95 27.23 46.17 65.43 81.43 99.24
KOMULATIF REALISASI -

Sidoarjo, 19 Agustus 2020


Diperiksa Oleh: Dibuat Oleh:

Leopold S,T,S Abd, Mufid


ESTIMATE JASA TENAGA INTERIOR KM/KT/PLAFOND/ASESORIS
Pekerjaan : REHABILITASI DAN NORMALISAI BANGUNAN RUMAH PT. UNIMAS WAHANA INDO NIAGA
Lokasi : Perum UNIMAS GARDEN JL. Pepelegi, Waru - Sidoarjo 61258
Block. f.01 Type 5 Telp. 031 8531995
Anggaran : AGUSTUS 2020 Email. Unimasgroup&yahoo.com
SATUAN September October November December
NO. URAIAN PEKERJAAN VOLUME SAT TOTAL BIAYA PROSEN
HARGA 7-18 21-02 05-16 19-30 02- 13 16-28 30-11 14-25

E PEKERJAAN PASANG ATAP DAN PLAFOND


1 Pasang rangka plafond sisi luar 54.00 m² 45,000 2,430,000 2.432 2.432
2 Pas Rangka atap Plafond dop silink + 2 R. Tidur 1 lantai 1 30.00 m² 55,000 1,650,000 1.651 0.826 0.826
3 Pas Rangka atap Plafond dop silink ± 2 R. Tidur 4 lantai 1 19.00 m² 55,000 1,045,000 1.046 0.523 0.523
4 Pas Rangka atap Plafond dop silink ± 2 R. Tidur 4 lantai 1 30.00 m² 55,000 1,650,000 1.651 0.826 0.826
5 Pas Rangka atap Plafond lantai 1 147.00 m² 35,000 5,145,000 5.150 2.575 2.575
6 Pas ranga atap plafond teras lantai 1 45.00 m² 35,000 1,575,000 1.576 0.788 0.788
7 Pas Rangka atap Plafond dop silink ± 2 R. Tidur 2 lantai 1 30.00 m² 55,000 1,650,000 1.651 0.826 0.826
8 Pas Rangka atap Plafond dop silink ± 2 R. Tidur 3 lantai 1 19.00 m² 55,000 1,045,000 1.046 0.523 0.523
9 Pas Rangka atap Plafond dop silink ± 1 R. Keluarga lantai 2 30.00 m² 55,000 1,650,000 1.651 0.826 0.826
10 Ruang Balkon 19.50 m² 35,000 682,500 0.683 0.342 0.342
11 Pas ranga atap plafond lantai 2 115.00 m² 35,000 4,025,000 4.029 2.014 2.014
12 Pas Lis lafond R.12 214.00 m 3,500 749,000 0.750 0.375 0.375
13 Pas Lis lafond R.10 175.00 m 3,500 612,500 0.613 0.613 0.613
14 Pas Lis lafond Drop siling 260.00 m 3,500 910,000 0.911 0.455 0.455
SUB TOTAL 24,819,000
PEMASANGAN KERAMIK /GRANIT
1 Pas Keramik dinding kamar mandi lantai 1 79.00 m² 45,000 3,555,000 3.558 1.779 1.779
2 Pas Keramik lantai kamar mandi lantai 1 22.20 m² 35,000 777,000 0.778 0.778
3 Pas kolkolan/plin lantai 10 cm lantai 1 178.00 m' 20,000 3,560,000 3.563 1.782 1.782
4 Pas keramik dapur lantai 1 3.00 m² 45,000 135,000 0.135 0.135
5 Pas keramik lantai dapur lantai 1 11.00 m² 35,000 385,000 0.385 0.385
6 Pas Penambahan lantai geranit lantai 1 pintu masuk 30.00 m² 55,000 1,650,000 1.651 1.651
7 Pas Keramik Area cuci lantai 2 Unpolish 6.00 m² 55,000 330,000 0.330
8 Pas Keramik dinding kamar mandi lantai 2 79.00 m² 45,000 3,555,000 3.558 0.389 0.389
9 Pas Keramik lantai kamar mandi lantai 2 22.20 m² 35,000 777,000 0.778 0.778
10 Pas Keramik ART lantai 2 8.00 m² 35,000 280,000 0.280 0.280
11 Pas kolkolan/plint lantai 10 cm lantai 2 118.00 m' 20,000 2,360,000 2.362 1.181 1.181
SUB TOTAL 17,364,000
PEMASANGAN SANITAIR
1 Pipa PVC aw 1/2 65.00 m' 17,500 1,137,500 1.139 0.569 0.569
2 Pipa PVC aw 3/5 275.00 m' 17,500 4,812,500 4.817 1.606 1.606 1.606
3 Pas Pipa air panas 340.00 m' 17,500 5,950,000 5.955 1.489 1.489 1.489 1.489
4 pas klosed duduk 3.00 m' 250,000 750,000 0.751 0.751
5 Pas wastafel 2.00 m' 150,000 300,000 0.300 0.300
6 Pas shower panas dingin 3.00 m' 55,000 165,000 0.165 0.165
SUB TOTAL 13,115,000
I PEKERJAAN FINISING DAN PENGECATAN DAN FINISING
1 Pek Cat Plafond 454.50 m² 17,500 7,953,750 7.961 2.654 2.654 2.654
2 Pek Cat Resplank + Resplank Beton 72.00 m² 17,500 1,260,000 1.261 1.261
4 Pek. Cat Interior Lantai 2 393.60 m 17,500 6,888,000 6.894 3.447 3.447
5 Pek. Cat Exterior Lantai 2 322.00 m² 17,500 5,635,000 5.640 2.820 2.820
6 Pek Lasur Casiplank 35.00 m' 35,000 1,225,000 1.226 1.226
7 Pek. Cat Interior Lantai 1 472.35 m² 17,500 8,266,125 8.274 4.137 4.137
8 Pek. Cat Exterior Lantai 1 334.56 m² 17,500 5,854,800 5.860 2.930 2.930
SUB TOTAL 37,082,675
I PEKERJAAN INSTALANSI LISTRIK
1 Pas Instalansi jalur kabel lantai 1 185.00 m' 17,500 3,237,500 3.240 1.620 1.620
2 Pas Saklar seri lantai 1 3.00 bh 5,000 15,000 0.015 0.015
3 pasa saklar tunggal lantai 1 9.00 bh 5,000 45,000 0.045 0.045
4 pas stop kontak lantai 1 26.00 bh 5,000 130,000 0.130 0.130
5 Pas Breket panel lantai 1 2.00 bh 6,000 12,000 0.012 0.012
6 Pas box panel lantai 1 1.00 bh 17,500 17,500 0.018 0.018
7 pas fiting 4" donlide lantai 1 25.00 bh 10,000 250,000 0.250 0.250
8 Pas Instalansi jalur kabel lantai 2 176.00 m' 17,500 3,080,000 3.083 1.541385 1.541385
9 Pas Saklar seri lantai 2 4.00 bh 5,000 20,000 0.020 0.020
10 pasa saklar tunggal lantai 2 2.00 bh 5,000 10,000 0.010 0.010
11 pas stop kontak lantai 2 22.00 bh 5,000 110,000 0.110 0.110
12 Pas Breket panel lantai 2 2.00 bh 5,000 10,000 0.010 0.010
13 Pas box panel lantai 2 1.00 bh 17,500 17,500 0.018 0.018
14 MCB 3 fase 1.00 bh 15,000 15,000 0.015 0.015
15 MCB 1 Fase 2.00 bh 10,000 20,000 0.020
16 Lampu Gantung 1.00 bh 200,000 200,000 0.200
17 pas fiting" lantai 2 34.00 bh 10,000 340,000 0.340 0.340
SUB TOTAL 7,529,500
TOTAL RENCANA 99,910,175 7.596 10.252 10.591 15.065 18.900 13.756 9.884 8.806
LUASAN BANGUNAN 514 194,377.77
KOMULATIF REALISASI
Sidoarjo, 19 Agustus 2020
Diperiksa Oleh: Dibuat Oleh:

Leopold S,T,S Abd, Mufid


ESTIMATE JASA TENAGA EXTERIOR , STRUKTUR, ATAP
Pek: REHABILITASI DAN NORMALISAI BANGUNAN RUMAH PT. UNIMAS WAHANA INDO NIAGA
Lok: Perum UNIMAS GARDEN JL. Pepelegi, Waru - Sidoarjo 61258
Block. f.01 Type 5 Telp. 031 8531995
Ang: AGUSTUS 2020 Email. Unimasgroup@yahoo.com

NO. URAIAN PEKERJAAN VOLUME SAT PROSEN Agustus September October November
MG3 MG4 MG1 MG2 MG3 MG4 MG1 MG2 MG3 MG4 MG1 MG2 MG3 MG4

A PEKERJAAN PERSIAPAN
1 Pembongkaran Kusen pintu + Jendela Bopenlis + Kaca 12.00 bh 0.188
2 Pembongkaran Dinding bata Merah 126.00 m² 1.379
3 Kupas dan kerok cat dinding lama 75.00 m² 0.235
4 Bongkar Joglo 9.00 m² 1.408
5 bongkar balok balok penghubung 17.00 m 0.372
6 bongkar resplank beton 11.00 m² 0.241
7 Bogkar nok dan genteng 220.00 m² 1.652
8 bongkar rengusuk + resplank kayu 220.00 m² 2.409
9 bongkar balok dan kuda2 kayu 220.00 m² 4.817
10 Pembersihan Bak Kontrol + Bak Saluran Air Bersih 1.00 ls 0.313

B PEKERJAAN TANAH
1 Galian pondasi setempat 100x100x100cm 7.00 ttk 0.197
2 Galian Strauss D 25 - 400 cm 14.00 ttk 0.788
3 Galian Sloff 25x400 21.00 m 0.460
4 Urug Pasir bawah pondasi 16.00 m2 0.050
5 Urug Tanah kembali 17.00 m 0.053
6 Pemadatan Urugan ( Vibrator ) 20.40 m2 0.064

C PEKERJAAN STRUKTUR BETON LANTAI 1


1 Rabat Lantai kerja T.5cm 16.80 m2 0.289
- Cor strauss D 25 - 400 cm 14.00 ttk 0.438
2 Pekerjaan Sloff 25x30
- Begisting Sloff 25x 30 12.60 m² 0.205
- Pembesian Slof 6Ø13 < Ø8-20cm 153.30 kg 0.384
- Pek cor sloff 25x30 + Pembongkaran begisting 21.00 m 0.591
3 Pekerjaan Kolom 15x30
- Begisting kolom 15x30 21.00 m² 0.342
- Pembesian Kolom 6Ø13 < Ø6-20cm 245.00 kg 0.613
- Pek cor kolom 15x30 + Pembongkaran begisting 28.00 m 0.788
4 Pekerjaan Balok 25x30 0.000
- Begisting Balok 20x 30 21.00 m² 0.342
- Pembesian balok 6Ø13 < Ø6-20cm 226.80 kg 0.568
- Pek cor Balok 15x30 + Pembongkaran begisting 21.00 m 0.591
5 Pek cor Balok latai 15x15 include begisting+ pembesian 48.00 m 2.252

D PEKERJAAN STRUKTUR BETON LANTAI 2


1 Pekerjaan Kolom 20x25
- Begisting kolom 20x25 37.00 m² 0.602
- Pembesian Kolom 6Ø13 < Ø8-20cm 385.00 kg 0.963
- Pek cor kolom 25x30 + Pembongkaran begisting 44.00 m 0.963
2 Pekerjaan Balok 25x30
- Begisting Balok 25x 30 73.20 m² 1.191
- Pembesian balok 6Ø13 < Ø8-20cm 1,275.00 kg 3.191
- Pek cor Balok 25x30 + Pembongkaran begisting 61.00 m 1.336
3 Pekerjaan Cor Plat T.12 cm
- Begisting Plat lantai kayu 5x7 + triplek 9mm 20.00 m² 1.001
- Pembesian plat lantai doble Ø08-20cm 700.00 kg 1.752
- pek cor Plat Lantai K. 250+ fibrator 20.00 m² 2.190
- pek. bongkaran begisting + perapian rongga cor 20.00 m² 0.113
4 Pekerjaan Cor Plat Kanopi ( over stex) + Resplank T.8 cm
- Begisting Plat lantai kayu 5x7 + triplek 9mm 6.00 m² 0.300
- Pembesian plat lantai doble Ø08-20cm 270.00 kg 0.676
- pek cor Plat Lantai K. 250+ fibrator 6.00 m² 0.657
- pek. bongkaran begisting + perapian rongga cor 6.00 m² 0.034
5 Pekerjaan Balok Gantung25x30
- Begisting Balok 25x 30 38.00 m² 1.070
- Pembesian balok 6Ø13 < Ø8-20cm 1,330.00 kg 3.328
- Pek cor Balok 25x30 + Pembongkaran begisting 38.00 m 2.140
6 Pek cor Balok latai 15x15 include begisting+ pembesian 27.00 m 1.267
7 Pemasangan resplank beton cetakan ( tempel )+ cor sambungan 75.00 m 2.815
8 Pemasangan resplank beton cetakan ( tempel )+ cor sambungan 165.00 m 4.645

E PEKERJAAN PASANGAN
1 Pek Pasang Dinding bata merah 1: lantai 1 84.00 m² 1.839
2 Pek Pasang Dinding bata merah 1: lantai 2 100.80 m² 2.207
3 Pekerjaan Plesteran + acian lantai 1 184.80 m² 2.890
4 Pekerjaan Plesteran + acian lantai 2 221.76 m² 3.468
5 Pek Plesteran comprot ( kasar ) 17.00 m² 0.479
6 Pekerjaan plesteran kolom + balok 72.00 m² 1.577
7 Pekerjaan Benangan 528.00 m 2.477
8 Ps kasiplang onamen dinding 23.10 m² 0.939
F PEKERJAAN PASANG ATAP DAN PLAFOND
1 Pek Greet Lantai Talang Beton EXISTING T. 3cm ( Mimbran bakar ) 72.00 m² 2.027
2 Pas Rangka Resplank + Kalsiboard Resiplank P.30cm 47.00 m 1.029
3 Pas rangka kuda-kuda sestem kremona baja ringan 280.00 m² 15.765
4 Pas Genteng Beton 280.00 m² 2.628
5 Nok Bumbungan Genteng 72.00 m' 2.027

G PEMASANGAN SANITAIR
1 Pas Saluran air Kotor Dan tranfer Pembuangan
- Pipa PVC aw 4" 24.00 m' 0.300
- Pipa PVC aw 3" 45.00 m' 0.563
- Pipa PVC aw 2" 20.00 m' 0.250

H PEMASANGAN INSTALANSI LISTRIK AN ENANGKAL PETIR


1 Pemasagan peangal petir
- Pas Konekto sleeve 3.00 bh 0.094
- pas Box sambunga/test box 5.00 set 0.047
- pas TGC ( tancient ground clamp ) 12.00 bh 0.056
- pas kabel BC 20.00 m 0.438
- Pas Grond rood galian 2.00 m 0.056
- pas stik jarum penangkal petir kap 10 m 3.00 bh 0.141

I PEKERJAAN FINISING DAN PENGECATAN DAN FINISING


1 Pek Cat Genteng dan Bumbungan genteng 280.00 m² 3.065
2 Pek water Profing 118.30 m² 1.110

J PEKERJAAN SEPTIC TANK kapasitas 3 m3


1 Galian tanah padas 7.50 m3 0.563
2 urug pasir bawah pondasi 3.75 m2 0.040
3 urugan tanah kembali 1.10 ls 0.031
4 cor lantai kerja 3.75 m2 0.106
5 pas bata umpak ( doble bata ) 9.50 m 0.327
6 pas kolom 15x15 16.00 m 0.551
7 pas balok beton 15x15 9.50 m 0.327
8 pas tutup plat beton saptitenk T.10 cm + pembesian, begisting 3.75 m2 0.587
9 istalansi resapan pipa 4" 1.00 ls 0.156
10 Pengadaan biutenk kapasitas 2.5m galian dan pemasangan 1.00 bh 0.751
11 Pembuatan resapan biotank 1.00 bh 0.282
SUB TOTAL
K PEKERJAAN LAIN_LAIN
1 Buang Puing Bongkaran ( Gragal ) 1.00 ls 1.564
2 Normalisasi saluran pembuangan air hujan 75.00 m 0.704
SUB T
Terbilang: TOTAL RENCANA 104

Sidoarjo, 19 Agustus 2020


Diperiksa Oleh: Dibuat Oleh:

Leopold S,T,S Abd, Mufid


ESTIMATE JASA TENAGA INTERIOR KM/KT/PLAFOND/ASESORIS
Peke: REHABILITASI DAN NORMALISAI BANGUNAN RUMAH PT. UNIMAS WAHANA INDO NIAGA
Loka: Perum UNIMAS GARDEN JL. Pepelegi, Waru - Sidoarjo 61258
Block. f.01 Type 5 Telp. 031 8531995
Ang: AGUSTUS 2020 Email. Unimasgroup@yahoo.com

NO. URAIAN PEKERJAAN VOLUME SAT PROSEN September October November Desember
MG3 MG4 MG1 MG2 MG3 MG4 MG1 MG2 MG3 MG4 MG1 MG2 MG3 MG4

A PEKERJAAN PASANG ATAP DAN PLAFOND


1 Pasang rangka plafond sisi luar 54.00 m² 2.630
2 Pas Rangka atap Plafond dop silink + 2 R. Tidur 1 lantai 1 30.00 m² 1.786
3 Pas Rangka atap Plafond dop silink ± 2 R. Tidur 4 lantai 1 19.00 m² 1.131
4 Pas Rangka atap Plafond dop silink ± 2 R. Tidur 4 lantai 1 30.00 m² 1.786
5 Pas Rangka atap Plafond lantai 1 147.00 m² 5.569
6 Pas ranga atap plafond teras lantai 1 45.00 m² 1.705
7 Pas Rangka atap Plafond dop silink ± 2 R. Tidur 2 lantai 1 30.00 m² 1.786
8 Pas Rangka atap Plafond dop silink ± 2 R. Tidur 3 lantai 1 19.00 m² 1.131
9 Pas Rangka atap Plafond dop silink ± 1 R. Keluarga lantai 2 30.00 m² 1.786
10 Ruang Balkon 19.50 m² 0.739
11 Pas rangka atap plafond lantai 2 115.00 m² 4.357
12 Pas Lis plafond R.12 214.00 m 0.811
13 Pas Lis plafond R.10 175.00 m 0.663
14 Pas Lis plafond Drop ceiling 260.00 m 0.985

B PEMASANGAN KERAMIK /GRANIT


1 Pas Keramik dinding kamar mandi lantai 1 79.00 m² 3.848
2 Pas Keramik lantai kamar mandi lantai 1 22.20 m² 0.841
3 Pas kolkolan/plin lantai 10 cm lantai 1 178.00 m' 3.854
4 Pas keramik dapur lantai 1 3.00 m² 0.146
5 Pas keramik lantai dapur lantai 1 11.00 m² 0.417
6 Pas Penambahan lantai geranit lantai 1 pintu masuk 30.00 m² 1.786
7 Pas Keramik Area cuci lantai 2 Unpolish 6.00 m² 0.357
8 Pas Keramik dinding kamar mandi lantai 2 79.00 m² 3.848
9 Pas Keramik lantai kamar mandi lantai 2 22.20 m² 0.841
10 Pas Keramik ART lantai 2 8.00 m² 0.303
11 Pas kolkolan/plint lantai 10 cm lantai 2 118.00 m' 2.555

C PEMASANGAN SANITAIR
1 Pipa PVC aw 1/2 65.00 m' 1.231
2 Pipa PVC aw 3/5 275.00 m' 5.209
3 Pas Pipa air panas 340.00 m' 6.441
4 pas klosed duduk 3.00 m' 0.812
5 Pas wastafel 2.00 m' 0.325
6 Pas shower panas dingin 3.00 m' 0.179

D PEKERJAAN FINISING DAN PENGECATAN


1 Pek Cat Plafond 454.50 m² 8.610
2 Pek Cat Resplank + Resplank Beton 72.00 m² 1.364
4 Pek. Cat Interior Lantai 2 393.60 m 7.456
5 Pek. Cat Exterior Lantai 2 322.00 m² 6.100
6 Pek Lasur Casiplank 35.00 m' 1.326
7 Pek. Cat Interior Lantai 1 472.35 m² 8.948
8 Pek. Cat Exterior Lantai 1 334.56 m² 6.338

E PEKERJAAN INSTALANSI LISTRIK


1 Pas Instalansi jalur kabel lantai 1 185.00 m' 3.505
2 Pas Saklar seri lantai 1 3.00 bh 0.016
3 pasa saklar tunggal lantai 1 9.00 bh 0.049
4 pas stop kontak lantai 1 26.00 bh 0.141
5 Pas Breket panel lantai 1 2.00 bh 0.013
6 Pas box panel lantai 1 1.00 bh 0.019
7 pas fiting 4" donlide lantai 1 25.00 bh 0.271
8 Pas Instalansi jalur kabel lantai 2 176.00 m' 3.334
9 Pas Saklar seri lantai 2 4.00 bh 0.022
10 pasa saklar tunggal lantai 2 2.00 bh 0.011
11 pas stop kontak lantai 2 22.00 bh 0.119
12 Pas Breket panel lantai 2 2.00 bh 0.011
13 Pas box panel lantai 2 1.00 bh 0.019
14 MCB 3 fase 1.00 bh 0.016
15 MCB 1 Fase 2.00 bh 0.022
16 Lampu Gantung 1.00 bh 0.216
17 pas fiting" lantai 2 34.00 bh 0.368

TOTAL RENCANA

Sidoarjo, 19 Agustus 2020


Diperiksa Oleh: Dibuat Oleh:

Leopold S,T,S Abd, Mufid


LAPORAN MINGGUAN TENAGA EXTERIOR , SETRUKTUR, ATAP
Pekerjaan : REHABILITASI DAN NORMALISAI BANGUNAN RUMAH

Lokasi : Perum UNIMAS GARDEN

Block. f.01 Type 514

Anggaran : AGUSTUS 2020

Agustus 24-04
NO. URAIAN PEKERJAAN VOLUME SAT PROSEN Kemajuan
Mg 3 Komulatif Mg 4 Komulatif

A PEKERJAAN PERSIAPAN
1 Pembongkaran Kusen pintu + Jendela Bopenlis + Kaca 12.00 bh 0.181 - - -
2 Pembongkaran Dinding bata Merah 126.00 m² 1.330 10 0.13 -
3 Kupas dan kerok cat dinding lama 75.00 m² 0.226 10 0.02 -
4 Bongkar Joglo 9.00 m² 1.357 70 0.95 -
5 bongkar balok balok penghubung 17.00 m 0.359 10 0.04 -
6 bngkar resplank beton 11.00 m² 0.232 5 0.01 -
7 Bogkar nok dan genten 220.00 m² 1.592 35 0.56 -
8 bongkar rengusuk + resplank kayu 220.00 m² 2.322 10 0.23 -
9 bongkar balok dan kuda2 kayu 220.00 m² 4.644 - -
10 Pembersihan Bak Kontrol + Bak Saluran Air Bersih 1.00 ls 0.302 - -

B PEKERJAAN TANAH
1 Galian pondasi setempat 100x100x100cm 7.00 ttk 0.190 - -
2 Galian Setrous D 25 - 400 cm 14.00 ttk 0.760 - -
3 Galian Sloff 25x400 21.00 m 0.443 - -
4 Urug Pasir bawah pondasi 16.00 m2 0.048 - -
5 Urug Tanah kembali 17.00 m 0.051 - -
6 Pemadatan Urugan ( Vibrator ) 20.40 m2 0.062 - -

C PEKERJAAN SETRUCTUR BETON lantai 1


1 Rabat Lantai kerja T.5cm 16.80 m2 0.279 - -
- Cor setrous D 25 - 400 cm 14.00 ttk 0.422 - -
2 Pekerjaan Sloff 25x30 - -
- Begisting Sloff 25x 30 12.60 m² 0.198 - -
- Pembesian Slof 6Ø13 < Ø8-20cm 153.30 kg 0.370 - -
- Pek cor sloff 25x30 + Pembongkaran begisting 21.00 m 0.570 - -
3 PekerjaanKolom 15x30 - -
- Begisting kolom 15x30 21.00 m² 0.329 - -
- Pembesian Kolom 6Ø13 < Ø6-20cm 245.00 kg 0.591 - -
- Pek cor kolom 15x30 + Pembongkaran begisting 28.00 m 0.760 - -
4 Pekerjaan Balok 25x30 0.000 - -
- Begisting Balok 20x 30 21.00 m² 0.329 - -
- Pembesian balok 6Ø13 < Ø6-20cm 226.80 kg 0.547 - -
- Pek cor Balok 15x30 + Pembongkaran begisting 21.00 m 0.570 - -
5 Pek cor Balok latai 15x15 include begisting+ pembesian 48.00 m 2.171 - -

D PEKERJAAN SETRUCTUR BETON lantai 2


1 PekerjaanKolom 20x25

- Begisting kolom 20x25 37.00 m² 0.580 - -


- Pembesian Kolom 6Ø13 < Ø8-20cm 385.00 kg 0.929 - -
- Pek cor kolom 25x30 + Pembongkaran begisting 44.00 m 0.929 - -
2 Pekerjaan Balok 25x30 - -
- Begisting Balok 25x 30 73.20 m² 1.148 - -
- Pembesian balok 6Ø13 < Ø8-20cm 1,275.00 kg 3.076 - -
- Pek cor Balok 25x30 + Pembongkaran begisting 61.00 m 1.288 - -
3 Pekerjaan Cor Plat T.12 cm - -
- Begisting Plat lantai kayu 5x7 + triplek 9mm 20.00 m² 0.965 - -
- Pembesian plat lantai doble Ø08-20cm 700.00 kg 1.689 - -
- pek cor Plat Lantai K. 250+ fibrator 20.00 m² 2.111 - -
- pek. bongkaran begisting + perapian rongga cor 20.00 m² 0.109 - -
5 Pekerjaan Cor Plat Kanopi ( over stex) + Resplank T.8 cm - -
- Begisting Plat lantai kayu 5x7 + triplek 9mm 6.00 m² 0.290 - -
- Pembesian plat lantai doble Ø08-20cm 270.00 kg 0.651 - -
- pek cor Plat Lantai K. 250+ fibrator 6.00 m² 0.633 - -
- pek. bongkaran begisting + perapian rongga cor 6.00 m² 0.033 - -
2 Pekerjaan Balok Gantung25x30 - -
- Begisting Balok 25x 30 38.00 m² 1.031 - -
- Pembesian balok 6Ø13 < Ø8-20cm 1,330.00 kg 3.209 - -
- Pek cor Balok 25x30 + Pembongkaran begisting 38.00 m 2.063 - -
6 Pek cor Balok latai 15x15 include begisting+ pembesian 27.00 m 1.221 - -
7 Pemasangan resplank beton cetakan ( tempel )+ cor sambungan 75.00 m 2.714 - -
8 Pemasangan resplank beton cetakan ( tempel )+ cor sambungan 165.00 m 4.479 - -

E PEKERJAAN PASANGAN
1 Pek Pasang Dinding bata merah 1: 6 lantai 1 84.00 m² 1.773 - -
2 Pek Pasang Dinding bata merah 1: 2 lantai 2 100.80 m² 2.128 - -
2 Pekerjaan Plesteran + acian lantai 1 184.80 m² 2.787 - -
3 Pekerjaan Plesteran + acian lantai 2 221.76 m² 3.344 - -
3 Pek Plesteran comprot ( kasar ) 17.00 m² 0.461 - -
4 Pekerjaan plesteran kolom + balok 72.00 m² 1.520 - -
6 Pekerjaan Benangan 528.00 m 2.389 - -
8 Ps kasiplang onamen dinding 23.10 m² 0.906 - -

G PEKERJAAN PASANG ATAP DAN PLAFOND


1 Pek Greet Lantai Talang Beton EXISTING T. 3cm ( Mimbran bakar 72.00 m² 1.954 - -
2 Pas Rangka Resplank + Calsiboard Resiplank P.30cm 47.00 m 0.992 - -
2 Pas rangka kuda-kuda sestem kremona baja ringan 280.00 m² 15.200 - -
5 Pas Genteng Beton 280.00 m² 2.533 - -
6 Nok Bumbungan Genteng 72.00 m' 1.954 - -

H PEMASANGAN SANITAIR

3 Pas Saluran air Kotor Dan tranfer Pembuangan


- Pipa PVC aw 4" 24.00 m' 0.290 - -
- Pipa PVC aw 3" 45.00 m' 0.543 - -
- Pipa PVC aw 2" 20.00 m' 0.241 - -

H PEMASANGAN INSTALANSI LISTRIK AN ENANGKAL PETIR

1 Pemasagan peangal petir


- Pas Konekto sleeve 3.00 bh 0.090 - -
- pas Box sambunga/test box 5.00 set 0.045 - -
- pas TGC ( tancient ground clamp ) 12.00 bh 0.054 - -
- pas kabel BC 20.00 m 0.422 - -
- Pas Grond rood galian 2.00 m 0.054 - -
- pas stik jarum penangkal petir kap 10 m 3.00 bh 0.136 - -

I PEKERJAAN FINISING DAN PENGECATAN DAN FINISING

1 Pek Cat Genteng dan Bumbungan genteng 280.00 m² 2.956 - -


2 Pek water Profing 118.30 m² 1.070 - -

K PEKERJAAN SAPTITENG kapasitas 3 m3


1 Galian tanah padas 7.50 m3 0.543 - -
2 urug pasir bawah pondasi 3.75 m2 0.038 - -
3 urugan tanah kembali 1.10 ls 0.030 - -
4 cor lantai kerja 3.75 m2 0.102 - -
5 pas bata umpak ( doble bata ) 9.50 m 0.315 - -
6 pas kolom 15x15 16.00 m 0.531 - -
7 pas balok beton 15x15 9.50 m 0.315 - -
8 pas tutup plat beton saptitenk T.10 cm + pembesia, begisting 3.75 m2 0.565 - -
9 istalansi resapan pipa 4" 1.00 ls 0.151 - -
10 Pengadaan biutenk kapasitas 2.5m3 galian dan pemasangan 1.00 bh 0.724 - -
11 Pembuatan resapan biotank 1.00 bh 0.271 - -

L PEKERJAAN LAIN_LAIN

1 Buang Puing Bongkaran ( Gragal ) 1.00 ls 1.508 - -


2 Normalisasi saluran pembuangan air hujan 75.00 m 0.679 - -

TOTAL RENCANA 100 1.94

Sidoarjo, 27 Agustus 2020


Diperiksa Oleh: Dibuat Oleh:
Leopold S,T,S Abd, Mufid

LAPORAN MINGGUAN JASA TENAGA INTERIOR KM/KT/PLAFOND/ASESORIS


Pekerjaan : REHABILITASI DAN NORMALISAI BANGUNAN RUMAH

Lokasi : Perum UNIMAS GARDEN

Block. f.01 Type 5

Anggaran : AGUSTUS 2020

Agustus 24-04
NO. URAIAN PEKERJAAN VOLUME SAT PROSEN Kemajuan
Mg 3 Komulatif Mg 4 Komulatif

E PEKERJAAN PASANG ATAP DAN PLAFOND

1 Pasang rangka plafond sisi luar 54.00 m² 2.432 - - -


2 Pas Rangka atap Plafond dop silink + 2 R. Tidur 1 lantai 1 30.00 m² 1.651 - -
3 Pas Rangka atap Plafond dop silink ± 2 R. Tidur 4 lantai 1 19.00 m² 1.046 - -
4 Pas Rangka atap Plafond dop silink ± 2 R. Tidur 4 lantai 1 30.00 m² 1.651 - -
5 Pas Rangka atap Plafond lantai 1 147.00 m² 5.150 - -
6 Pas ranga atap plafond teras lantai 1 45.00 m² 1.576 - -
7 Pas Rangka atap Plafond dop silink ± 2 R. Tidur 2 lantai 1 30.00 m² 1.651 - -
8 Pas Rangka atap Plafond dop silink ± 2 R. Tidur 3 lantai 1 19.00 m² 1.046 - -
9 Pas Rangka atap Plafond dop silink ± 1 R. Keluarga lantai 2 30.00 m² 1.651 - -
10 Ruang Balkon 19.50 m² 0.683 - -
11 Pas ranga atap plafond lantai 2 115.00 m² 4.029

12 Pas Lis lafond R.12 214.00 m 0.750

13 Pas Lis lafond R.10 175.00 m 0.613 - -


14 Pas Lis lafond Drop siling 260.00 m 0.911 - -
- -
PEMASANGAN KERAMIK /GRANIT - -
1 Pas Keramik dinding kamar mandi lantai 1 79.00 m² 3.558 - -
2 Pas Keramik lantai kamar mandi lantai 1 22.20 m² 0.778 - -
3 Pas kolkolan/plin lantai 10 cm lantai 1 178.00 m' 3.563
4 Pas keramik dapur lantai 1 3.00 m² 0.135
5 Pas keramik lantai dapur lantai 1 11.00 m² 0.385 - -
6 Pas Penambahan lantai geranit lantai 1 pintu masuk 30.00 m² 1.651 - -
7 Pas Keramik Area cuci lantai 2 Unpolish 6.00 m² 0.330 - -
8 Pas Keramik dinding kamar mandi lantai 2 79.00 m² 3.558 - -
9 Pas Keramik lantai kamar mandi lantai 2 22.20 m² 0.778 - -
10 Pas Keramik ART lantai 2 8.00 m² 0.280 - -
11 Pas kolkolan/plint lantai 10 cm lantai 2 118.00 m' 2.362 - -
- -
PEMASANGAN SANITAIR - -
1 Pipa PVC aw 1/2 65.00 m' 1.139 - -
2 Pipa PVC aw 3/5 275.00 m' 4.817 - -
3 Pas Pipa air panas 340.00 m' 5.955 - -
4 pas klosed duduk 3.00 m' 0.751 - -
5 Pas wastafel 2.00 m' 0.300 - -
6 Pas shower panas dingin 3.00 m' 0.165 - -

I PEKERJAAN FINISING DAN PENGECATAN DAN FINISING

1 Pek Cat Plafond 454.50 m² 7.961

2 Pek Cat Resplank + Resplank Beton 72.00 m² 1.261 - -


4 Pek. Cat Interior Lantai 2 393.60 m 6.894 - -
5 Pek. Cat Exterior Lantai 2 322.00 m² 5.640 - -
6 Pek Lasur Casiplank 35.00 m' 1.226 - -
7 Pek. Cat Interior Lantai 1 472.35 m² 8.274 - -
8 Pek. Cat Exterior Lantai 1 334.56 m² 5.860 - -
- -
I PEKERJAAN INSTALANSI LISTRIK - -
1 Pas Instalansi jalur kabel lantai 1 185.00 m' 3.240 - -
2 Pas Saklar seri lantai 1 3.00 bh 0.015 - -
3 pasa saklar tunggal lantai 1 9.00 bh 0.045 - -
4 pas stop kontak lantai 1 26.00 bh 0.130 - -
5 Pas Breket panel lantai 1 2.00 bh 0.012 - -
6 Pas box panel lantai 1 1.00 bh 0.018 - -
7 pas fiting 4" donlide lantai 1 25.00 bh 0.250 - -
8 Pas Instalansi jalur kabel lantai 2 176.00 m' 3.083 - -
9 Pas Saklar seri lantai 2 4.00 bh 0.020 - -
10 pasa saklar tunggal lantai 2 2.00 bh 0.010 - -
11 pas stop kontak lantai 2 22.00 bh 0.110 - -
12 Pas Breket panel lantai 2 2.00 bh 0.010 - -
13 Pas box panel lantai 2 1.00 bh 0.018 - -
14 MCB 3 fase 1.00 bh 0.015 - -
15 MCB 1 Fase 2.00 bh 0.020 - -
16 Lampu Gantung 1.00 bh 0.200 - -
17 pas fiting" lantai 2 34.00 bh 0.340

TOTAL RENCANA 100 - -

Sidoarjo, 27 Agustus 2020


Diperiksa Oleh: Dibuat Oleh:

Leopold S,T,S Abd, Mufid


ESTIMATE JASA TENAGA EXTERIOR , SETRUKTUR, ATAP

Pekerjaan : REHABILITASI DAN NORMALISAI BANGUNAN RUMAH PT. UNIMAS WAHANA INDO NIAGA
Lokasi : Perum UNIMAS GARDEN JL. Pepelegi, Waru - Sidoarjo 61258
Block. f.01 Type 5 Telp. 031 8531995

Anggaran : AGUSTUS 2020 Email. Unimasgroup&yahoo.com

SATUAN Agustus September October November


NO. URAIAN PEKERJAAN VOLUME SAT TOTAL BIAYA PROSEN
HARGA
MG3 MG4 MG1 MG2 MG3 MG4 MG1 MG2 MG3 MG4 MG1 MG2 MG3 MG4

A PEKERJAAN PERSIAPAN
1 Pembongkaran Kusen pintu + Jendela Bopenlis + Kaca 12.00 bh 25,000 300,000 0.181
2 Pembongkaran Dinding bata Merah 126.00 m² 17,500 2,205,000 1.330
3 Kupas dan kerok cat dinding lama 75.00 m² 5,000 375,000 0.226
4 Bongkar Joglo 9.00 m² 250,000 2,250,000 1.357
5 bongkar balok balok penghubung 17.00 m 35,000 595,000 0.359
6 bngkar resplank beton 11.00 m² 35,000 385,000 0.232
7 Bogkar nok dan genten 220.00 m² 12,000 2,640,000 1.592
8 bongkar rengusuk + resplank kayu 220.00 m² 17,500 3,850,000 2.322
9 bongkar balok dan kuda2 kayu 220.00 m² 35,000 7,700,000 4.644
10 Pembersihan Bak Kontrol + Bak Saluran Air Bersih 1.00 ls 500,000 500,000 0.302
20,800,000
B PEKERJAAN TANAH
1 Galian pondasi setempat 100x100x100cm 7.00 ttk 45,000.00 315,000 0.190
2 Galian Setrous D 25 - 400 cm 14.00 ttk 90,000.00 1,260,000 0.760
3 Galian Sloff 25x400 21.00 m 35,000.00 735,000 0.443
4 Urug Pasir bawah pondasi 16.00 m2 5,000.00 80,000 0.048
5 Urug Tanah kembali 17.00 m 5,000.00 85,000 0.051
6 Pemadatan Urugan ( Vibrator ) 20.40 m2 5,000.00 102,000 0.062
2,577,000
C PEKERJAAN SETRUCTUR BETON lantai 1
1 Rabat Lantai kerja T.5cm 16.80 m2 27,500 462,000 0.279
- Cor setrous D 25 - 400 cm 14.00 ttk 50,000 700,000 0.422
2 Pekerjaan Sloff 25x30

- Begisting Sloff 25x 30 12.60 m² 26,000 327,600 0.198


- Pembesian Slof 6Ø13 < Ø8-20cm 153.30 kg 4,000 613,200 0.370
- Pek cor sloff 25x30 + Pembongkaran begisting 21.00 m 45,000 945,000 0.570
3 Pekerjaan Kolom 15x30

- Begisting kolom 15x30 21.00 m² 26,000 546,000 0.329


- Pembesian Kolom 6Ø13 < Ø6-20cm 245.00 kg 4,000 980,000 0.591
- Pek cor kolom 15x30 + Pembongkaran begisting 28.00 m 45,000 1,260,000 0.760
4 Pekerjaan Balok 25x30 0.000
- Begisting Balok 20x 30 21.00 m² 26,000 546,000 0.329
- Pembesian balok 6Ø13 < Ø6-20cm 226.80 kg 4,000 907,200 0.547
- Pek cor Balok 15x30 + Pembongkaran begisting 21.00 m 45,000 945,000 0.570
5 Pek cor Balok latai 15x15 include begisting+ pembesian 48.00 m 75,000 3,600,000 2.171
11,832,000
D PEKERJAAN STRUKTUR BETON lantai 2
1 PekerjaanKolom 20x25

- Begisting kolom 20x25 37.00 m² 26,000 962,000 0.580


- Pembesian Kolom 6Ø13 < Ø8-20cm 385.00 kg 4,000 1,540,000 0.929
- Pek cor kolom 25x30 + Pembongkaran begisting 44.00 m 35,000 1,540,000 0.929
2 Pekerjaan Balok 25x30 -
- Begisting Balok 25x 30 73.20 m² 26,000 1,903,200 1.148
- Pembesian balok 6Ø13 < Ø8-20cm 1,275.00 kg 4,000 5,100,000 3.076
- Pek cor Balok 25x30 + Pembongkaran begisting 61.00 m 35,000 2,135,000 1.288
3 Pekerjaan Cor Plat T.12 cm -
- Begisting Plat lantai kayu 5x7 + triplek 9mm 20.00 m² 80,000 1,600,000 0.965
- Pembesian plat lantai doble Ø08-20cm 700.00 kg 4,000 2,800,000 1.689
- pek cor Plat Lantai K. 250+ fibrator 20.00 m² 175,000 3,500,000 2.111
- pek. bongkaran begisting + perapian rongga cor 20.00 m² 9,000 180,000 0.109
4 Pekerjaan Cor Plat Kanopi ( over stex) + Resplank T.8 cm -
- Begisting Plat lantai kayu 5x7 + triplek 9mm 6.00 m² 80,000 480,000 0.290
- Pembesian plat lantai doble Ø08-20cm 270.00 kg 4,000 1,080,000 0.651
- pek cor Plat Lantai K. 250+ fibrator 6.00 m² 175,000 1,050,000 0.633
- pek. bongkaran begisting + perapian rongga cor 6.00 m² 9,000 54,000 0.033
5 Pekerjaan Balok Gantung25x30 -
- Begisting Balok 25x 30 38.00 m² 45,000 1,710,000 1.031
- Pembesian balok 6Ø13 < Ø8-20cm 1,330.00 kg 4,000 5,320,000 3.209
- Pek cor Balok 25x30 + Pembongkaran begisting 38.00 m 90,000 3,420,000 2.063
6 Pek cor Balok latai 15x15 include begisting+ pembesian 27.00 m 75,000 2,025,000 1.221
7 Pemasangan resplank beton cetakan ( tempel )+ cor sambungan 75.00 m 60,000 4,500,000 2.714
8 Pemasangan resplank beton cetakan ( tempel )+ cor sambungan 165.00 m 45,000 7,425,000 4.479
48,324,200
E PEKERJAAN PASANGAN
1 Pek Pasang Dinding bata merah 1: 6 lantai 1 84.00 m² 35,000 2,940,000 1.773
2 Pek Pasang Dinding bata merah 1: 2 lantai 2 100.80 m² 35,000 3,528,000 2.128
3 Pekerjaan Plesteran + acian lantai 1 184.80 m² 25,000 4,620,000 2.787
4 Pekerjaan Plesteran + acian lantai 2 221.76 m² 25,000 5,544,000 3.344
5 Pek Plesteran comprot ( kasar ) 17.00 m² 45,000 765,000 0.461
6 Pekerjaan plesteran kolom + balok 72.00 m² 35,000 2,520,000 1.520
7 Pekerjaan Benangan 528.00 m 7,500 3,960,000 2.389
8 Ps kasiplang onamen dinding 23.10 m² 65,000 1,501,500 0.906
25,378,500
F PEKERJAAN PASANG ATAP DAN PLAFOND
1 Pek Greet Lantai Talang Beton EXISTING T. 3cm ( Mimbran bakar ) 72.00 m² 45,000 3,240,000 1.954
2 Pas Rangka Resplank + Calsiboard Resiplank P.30cm 47.00 m 35,000 1,645,000 0.992
3 Pas rangka kuda-kuda sestem kremona baja ringan 280.00 m² 90,000 25,200,000 15.200
4 Pas Genteng Beton 280.00 m² 15,000 4,200,000 2.533
5 Nok Bumbungan Genteng 72.00 m' 45,000 3,240,000 1.954
37,525,000
G PEMASANGAN SANITAIR

1 Pas Saluran air Kotor Dan tranfer Pembuangan -


- Pipa PVC aw 4" 24.00 m' 20,000 480,000 0.290
- Pipa PVC aw 3" 45.00 m' 20,000 900,000 0.543
- Pipa PVC aw 2" 20.00 m' 20,000 400,000 0.241
1,780,000
H PEMASANGAN INSTALANSI LISTRIK AN ENANGKAL PETIR

1 Pemasagan peangal petir


- Pas Konekto sleeve 3.00 bh 50,000 150,000 0.090
- pas Box sambunga/test box 5.00 set 15,000 75,000 0.045
- pas TGC ( tancient ground clamp ) 12.00 bh 7,500 90,000 0.054
- pas kabel BC 20.00 m 35,000 700,000 0.422
- Pas Grond rood galian 2.00 m 45,000 90,000 0.054
- pas stik jarum penangkal petir kap 10 m 3.00 bh 75,000 225,000 0.136
1,330,000
I PEKERJAAN FINISING DAN PENGECATAN DAN FINISING

1 Pek Cat Genteng dan Bumbungan genteng 280.00 m² 17,500 4,900,000 2.956
2 Pek water Profing 118.30 m² 15,000 1,774,500 1.070
6,674,500
J PEKERJAAN SEPTIC TANK kapasitas 3 m3
1 Galian tanah padas 7.50 m3 120,000 900,000 0.543
2 urug pasir bawah pondasi 3.75 m2 17,000 63,750 0.038
3 urugan tanah kembali 1.10 ls 45,000 49,500 0.030
4 cor lantai kerja 3.75 m2 45,000 168,750 0.102
5 pas bata umpak ( doble bata ) 9.50 m 55,000 522,500 0.315
6 pas kolom 15x15 16.00 m 55,000 880,000 0.531
7 pas balok beton 15x15 9.50 m 55,000 522,500 0.315
8 pas tutup plat beton saptitenk T.10 cm + pembesian, begisting 3.75 m2 250,000 937,500 0.565
9 istalansi resapan pipa 4" 1.00 ls 250,000 250,000 0.151
10 Pengadaan biutenk kapasitas 2.5m3 galian dan pemasangan 1.00 bh 1,200,000 1,200,000 0.724
11 Pembuatan resapan biotank 1.00 bh 450,000 450,000 0.271
SUB TOTAL 5,944,500
K PEKERJAAN LAIN_LAIN

1 Buang Puing Bongkaran ( Gragal ) Scope Tim BPL 1.00 ls 2,500,000 2,500,000 1.508
2 Normalisasi saluran pembuangan air hujan 75.00 m 15,000 1,125,000 0.679
SUB TOTAL 3,625,000

Terbilang: TOTAL RENCANA 165,790,700 100

LUASAN BANGUNAN 514 322,550.00 - - - - - - - -


KOMULATIF REALISASI -

Sidoarjo, 10 September 2020


Diperiksa Oleh: Dibuat Oleh:

Leopold S,T,S Abd, Mufid


ESTIMATE JASA TENAGA INTERIOR LANJUTAN PARTIS
Pekerjaan : Lanjutan Pekerjaan Modifikasi Dinding partisi HO
Lokasi : Gedung HO
Tanggal : 11 September 2020
Anggaran : 2020
SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT TOTAL BIAYA
HARGA

I PEKERJAAN PASANG LIST+ FRAME DINDING HPL


1 Pekerjaan bongkaran 1 ls 50,000 50,000
2 Pembersihan area kerja 1 ls 50,000 50,000
Sub Total 100,000
II PEKERJAAN PASANG LIST+ FRAME DINDING HPL -
1 Pas list dinding HPL HO ( tamapak A ) 49.56 m' 12,880 638,333
2 Pas Frame list dinding HPL HO ( tamapak A ) 14.43 m² 11,040 159,307
3 Pas list dinding HPL HO ( tamapak B ) 49.56 m' 12,880 638,333
4 Pas Frame list dinding HPL HO ( tamapak B ) 14.43 m² 11,040 159,307
5 Pas list dinding HPL HO ( tamapak C ) 97.24 m' 12,880 1,252,451
6 Pas Frame list dinding HPL HO ( tamapak C ) 26.04 m² 11,040 287,482
7 Pas list dinding HPL HO ( tamapak D1 ) 26.02 m' 12,880 335,138
8 Pas Frame list dinding HPL HO ( tamapak D1 ) 7.20 m² 11,040 79,488
9 Pas list dinding HPL HO ( tamapak D2 ) 26.02 m' 12,880 335,138
10 Pas Frame list dinding HPL HO ( tamapak D2 ) 7.20 m² 11,040 79,488
11 Pas list dinding HPL HO ( tamapak E ) 47.50 m' 12,880 611,736
12 Pas Frame list dinding HPL HO ( tamapak E ) 10.16 m² 11,040 112,144
Sub Total 4,688,345
III PEKERJAAN PENGECATAN LIS DINDING HPL -
1 Cat Kayu Lis dinding HPL HO ( Duco ) 79.46 m² 15,000.00 1,191,900
Sub Total 1,191,900
A PEKERJAAN REPARASI KUSEN & DAUN PINTU
1 Fabrikasi List Kayu u/ F1 260.00 m' 6,000 1,560,000
2 Fabrikasi List Kayu u/ Head Office 50.00 m' 6,000 300,000
Sub Total 1,860,000
C PEK TAMBAHAN DINDING PARTISI HO
1 Pabrikasi MDF doble 5mm 5.50 m² 12,880 70,840
modifikasi lis profile tampak 1 96.00 m' 11,500 1,104,000
pek cat duco putih 96.00 m' 7,000 672,000
pek cat duco modifikasi yellow 5.50 m² 27,500 151,250
2 Pabrikasi MDF doble 5mm 24.60 m² 11,040 271,584
modifikasi lis profile tampak F 258.15 m' 11,500 2,968,725
pek cat duco putih 258.15 m' 7,000 1,807,050
pek cat duco clasic white 24.60 m² 27,500 676,500
3 Pabrikasi MDF doble 5mm 4.80 m² 12,880 61,824
tampak h1+h2
modifikasi lis profile tampak h1+h2 38.50 m' 11,500 442,750
pek cat duco putih 38.50 m' 7,000 269,500
pek cat duco clasic white 4.80 m² 27,500 132,000
4 Pabrikasi MDF doble 5mm 3.25 m² 12,880 41,796
modifikasi lis profile tampak G 32.40 m' 11,500 372,600
pek cat duco putih 32.40 m' 7,000 226,800
pek cat duco clasic white 3.25 m² 27,500 89,238
5 Pabrikasi MDF doble 5mm 3.52 m² 12,880 45,338
modifikasi lis profile tampak A 24.00 m' 11,500 276,000
pek cat duco putih 24.00 m' 7,000 168,000
6 Pabrikasi MDF doble 5mm 3.52 m² 12,880 45,338
modifikasi lis profile tampak B 24.00 m' 11,500 276,000
pek cat duco putih 24.00 m' 7,000 168,000
7 Pabrikasi MDF doble 5mm 7.04 m² 12,880 90,675
modifikasi lis profile tampak C 46.40 m' 11,500 533,600
pek cat duco putih 46.40 m' 7,000 324,800
8 Pabrikasi MDF doble 5mm 6.60 m² 12,880 85,008
modifikasi lis profile tampak d1&d2 36.00 m' 11,500 414,000
pek cat duco putih 36.00 m' 7,000 252,000
9 Pabrikasi MDF doble 5mm 7.00 m² 12,880 90,160
modifikasi lis profile tampak E 47.00 m' 11,500 540,500
pek cat duco putih 47.00 m' 7,000 329,000
penambahan hpl putih 0.75 m² 17,500 13,125
Sub Total 13,010,000

JUMLAH 20,850,245

Diperiksa Oleh: Dibuat oleh

Leopold S,T,S A. Mufid

ESTIMATE MATERIAL INTERIOR LANJUTAN PARTISI


Pekerjaan : Lanjutan Pekerjaan Modifikasi Dinding partisi HO
Lokasi : Gedung HO

Anggaran : 2020
SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT TOTAL BIAYA
HARGA
SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT TOTAL BIAYA
HARGA

I MATERIAL KAYU
1 Kayu Lis 2.5x 5cm P. 4mm 245 btg 12,000 2,940,000
2 Paku Tembak 1 ls 50,000 50,000
3 Lem Kayu
4 MDF 120x240x4mm
5 HPL Putih 1 lbr
Sub Total 2,990,000
II MATERIAL FINISING
1 Dempul kayu ( alfaglos )
2 Amplas / Kertas gosok 240
3 Amplas / Kertas gosok 320
4 Cat epoxsi
5 cat duco
Sub Total #REF!

JUMLAH #REF!
ERIOR LANJUTAN PARTISI HO
PT. UNIMAS WAHANA INDO NIAGA

JL. Pepelegi, Waru - Sidoarjo 61258

Telp. 031 8531995

Email. Unimasgroup&yahoo.com

SEPTEMBER OKTOBER
Mg 2 Mg 3 Mg 4 Mg1 Mg2 Mg3 Mg4
Mandor aplikator

BAMBANG

RIOR LANJUTAN PARTISI HO


PT. UNIMAS WAHANA INDO NIAGA

JL. Pepelegi, Waru - Sidoarjo 61258

Telp. 031 8531995

Email. Unimasgroup&yahoo.com

SEPTEMBER OKTOBER
Mg 2 Mg 3 Mg 4 Mg1 Mg2 Mg3 Mg4

You might also like