Professional Documents
Culture Documents
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material 6385.539759
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material 1.408 m2/zak 14.205 kg/M2
Material
Material 1.408 m2/zak 14.205 kg/M2
Material
Material
Material 60
Material
Material 0.252635429 15.1581257
Material 2.664514285714 9084.58256
Material 4.736914285714 8605.6022 44.4 59.5581257
Material 7.401428571429 8598.34009 132.35139
Material
Material 10.65805714286 8601.56769
0.45
Subcontractor
borong
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Subcontractor sudah
Service
Service
Subcontractor
Material
0.0096 2750000
Material
Material
Material
Material
Material 0.99
Material
Material
Material
2750
Material
Material
Material
Service
Subcontractor
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
Material
28.7194
2.9187092 10.059761 M2 railing
8.4488
Material
Material
Material
Material
Material
material
Material
m2 Rp326,389
m2 Rp329,514
0.71025
ANALISA HARGA SATUAN PEKERJAAN
DATA PEMBAHARUAN & PENYESUAIAN 2020
1 2 3 4 5
1 Pembersihan Lokasi m2 1.000
Pekerja OH 0.100 120,000.00
Mandor OH 0.050 170,000.00
Jumlah
2 Pengukuran dan pasangan bouwplank m 1.000
Kayu meranti 4/6 m3 0.012 2,750,000.00
Paku biasa 2" - 5 " kg 0.020 12,500.00
Kayu meranti papan (meranti 4/6) m3 0.007 2,750,000.00
Pekerja oh 0.100 120,000.00
Tukang Kayu oh 0.100 150,000.00
Mandor oh 0.005 170,000.00
Jumlah
3 Galian Tanah Biasa Sedalam 1m m3 1.000
Pekerja OH 0.750 120,000.00
Mandor OH 0.025 170,000.00
Jumlah
4 Bor Pondasi Strous dia 30 cm m3 1.000
Pekerja OH 1.440 120,000.00
Mandor OH 0.072 170,000.00
Sewa alat bor strous jam 1.200 15,000.00
Jumlah
5 Urugan Pasir m3 1.000
Pasir Urug m3 1.100 165,000.00
Pekerja OH 0.300 120,000.00
Mandor OH 0.100 170,000.00
Jumlah
6 Urugan Tasirtu m3 1.000
Tasirtu m3 1.200 72,916.67
Pekerja OH 0.250 120,000.00
Mandor OH 0.025 170,000.00
Jumlah
7 Urugan Tanah Kembali m3 1.000
Pekerja OH 0.092 120,000.00
Mandor OH 0.009 170,000.00
Jumlah
8 Buangan Tanah Galian m3 1.000
Pekerja OH 0.200 120,000.00
Mandor OH 0.040 170,000.00
Jumlah
9 Pasangan batu bata 1:3 m3 1.000
Batu bata merah 5x11x22 cm bh 630.000 550.00
Semen Portland zak 0.287 49,500.00
Pasir pasang m3 0.040 165,000.00
Pekerja oh 0.300 120,000.00
Tukang Batu oh 0.100 150,000.00
Kepala Tukang Batu oh 0.010 170,000.00
Mandor oh 0.015 170,000.00
Jumlah
10 Pasang Dinding Bata 1:3 1/2 Bata m2 1.000
Batu Bata Merah bh 70.000 550.00
Semen Portland 50 kg zak 0.287 49,500.00
Pasir Pasang m3 0.040 165,000.00
Pekerja OH 0.300 120,000.00
Tukang Batu OH 0.100 150,000.00
Kepala Tukang Batu OH 0.010 170,000.00
Mandor OH 0.015 170,000.00
Jumlah
11 Plesteran Tebal 15mm Campuran 1 : 3 m2 1.000
Semen Portland 50 kg zak 0.156 61,875.00
Pasir pasang m3 0.023 165,000.00
Pekerja OH 0.300 120,000.00
Tukang Batu OH 0.150 150,000.00
Kepala Tukang Batu OH 0.015 170,000.00
Mandor OH 0.015 170,000.00
Jumlah
12 Plesteran Tebal 20mm Campuran 1 : 5 m2 1.000
Semen Portland 50 kg zak 0.138 61,875.00
Pasir pasang m3 0.035 205,000.00
Pekerja OH 0.250 120,000.00
Mandor OH 0.002 170,000.00
Jumlah
13 Benangan Sudut 1 : 2 m 1.000
Semen Portland zak 0.010 61,875.00
Pasir Pasang m3 0.013 205,000.00
Pekerja OH 0.080 120,000.00
Tukang Batu OH 0.040 150,000.00
Mandor OH 0.004 170,000.00
Jumlah
14 Acian Beton m2 1.000
Semen Portland zak 0.065 61,875.00
Pekerja OH 0.075 120,000.00
Mandor OH 0.008 170,000.00
Jumlah
15 Beton Lantai Kerja 1:3:5 m3 1.000
Semen Portland 40 kg zak 5.750 49,500.00
Pasir beton m3 0.558 165,000.00
Pekerja OH 1.200 120,000.00
Tukang Batu OH 0.200 150,000.00
Kepala Tukang Batu OH 0.020 170,000.00
Mandor OH 0.060 170,000.00
Jumlah
16 Beton Rabat beton 1:3:5 m3 1.000
Semen Portland 40 kg zak 6.900 49,500.00
Pasir beton m3 0.518 165,000.00
Batu pecah mesin 1/2 m3 0.533 280,000.00
Pekerja OH 1.650 120,000.00
Tukang Batu OH 0.275 150,000.00
Kepala Tukang Batu OH 0.028 170,000.00
Mandor OH 0.083 170,000.00
Jumlah
17 Pembesian Dengan Besi Polos kg 1.000
Besi beton polos kg 1.050 10,600.00
Kawat beton (bendrat) kg 0.015 14,000.00
Pekerja OH 0.007 120,000.00
Tukang Besi OH 0.007 150,000.00
Mandor OH 0.001 170,000.00
Jumlah
18 Bekisting non Struktural m2 1.000
Kayu meranti papan (MC) m3 0.022 1,970,720.72
Kayu meranti usuk m3 0.002 2,750,000.00
Paku biasa 2"- 5" kg 0.300 12,500.00
Jumlah bahan
Pekerja OH 0.220 120,000.00
Mandor OH 0.026 170,000.00
Jumlah upah
Bahan Begesting 2x pakai 0.500 52,605.86
Upah bgesting 2 x pakai 1.000 30,820.00
Jumlah begesting 2 x pakai
Bekisting Balok Struktur m3 1.000
19 Kayu meranti usuk m3 0.020 2,750,000.00
Paku biasa 2"- 5" kg 0.400 12,500.00
Balok Kayu Meranti m3 0.018 2,750,000.00
Multiplek tebal 8 mm lbr 0.350 87,500.00
Jumlah bahan
Pekerja OH 0.660 120,000.00
Tukang Kayu OH 0.330 150,000.00
Mandor OH 0.033 170,000.00
Jumlah upah
Bahan Begesting 2x pakai 0.500 140,125.00
Upah bgesting 2 x pakai 1.000 134,310.00
Jumlah begesting 2 x pakai
Bekisting Plat Lantai m3 1.000
20 Kayu meranti usuk m3 0.0238 2,750,000.00
Paku biasa 2"- 5" kg 0.4000 12,500.00
Balok Kayu Meranti m3 0.0150 2,750,000.00
Multiplek tebal 8 mm lbr 0.3500 87,500.00
Kayu Glugu 6/12 (4 Meter) btg 2.0000 85,000.00
Jumlah bahan
Pekerja OH 0.660 120,000.00
Tukang Kayu OH 0.330 150,000.00
Mandor OH 0.033 170,000.00
Jumlah upah
Bahan Begesting 2x pakai 0.500 312,325.00
Upah bgesting 2 x pakai 1.000 134,310.00
Jumlah begesting 2 x pakai
Bekisting Tangga m3 1.000
21 Kayu meranti usuk m3 0.030 2,750,000.00
Paku Usuk kg 0.400 12,500.00
Kayu Glugu 6/12 (4 Meter) m3 0.015 2,951,388.89
Multiplek tebal 9 mm lbr 0.350 119,800.00
Jumlah bahan
Pekerja OH 0.660 120,000.00
Tukang Kayu OH 0.330 150,000.00
Mandor OH 0.033 170,000.00
Jumlah upah
Bahan Begesting 2x pakai 0.500 173,700.83
Upah bgesting 2 x pakai 1.000 134,310.00
Jumlah begesting 2 x pakai
Pondasi strous dia 30 cm m3 1.000
22 Beton 1:3:5 m3 1.000 834,380.00
Besi beton polos Ø6 kg 68.833 9,084.58
Besi beton polos D10 kg 89.000 8,598.34
Jumlah
Sloof 15/25 m3 1.000
23 Beton 1:3:5 m3 1.000 834,380.00
Begesting 2x pakai m2 13.333 57,122.93
Besi beton polos Ø8 kg 42.106 8605.602
Besi beton polos Ø10 kg 98.686 8598.340
Jumlah
Sloof 20/35 m3 1.000
24 Beton 1:3:5 m3 1.000 834,380.00
24
Begesting 2x pakai m2 11.667 57,122.93
Besi beton polos Ø8 kg 31.016 8605.602
Besi beton polos Ø10 kg 17.622 8598.340
Besi beton polos Ø12 kg 50.753 8601.568
Jumlah
Beton Kolom praktis 10/15 m3 1.000
25 Beton 1:3:5 m3 1.000 834,380.00
Begesting 2x pakai m2 20.000 57,122.93
Besi beton polos Ø6 kg 45.889 9,084.58
Besi beton polos Ø8 kg 105.265 8,605.60
Jumlah
Beton Kolom 15/30 m3 1.000
26 Beton 1:3:5 m3 1.000 834,380.00
Begesting 2x pakai m2 13.333 57,122.93
Besi beton polos Ø8 kg 46.492 8605.602
Besi beton polos Ø10 kg 82.238 8,598.34
Jumlah
Beton Kolom 15/40 m3 1.000
27 Beton 1:3:5 m3 1.000 834,380.00
Begesting 2x pakai m2 18.333 57,122.93
Besi beton polos Ø8 kg 35.527 8605.602
Besi beton polos Ø10 kg 41.119 8,598.34
Besi beton polos Ø12 kg 59.211 8601.568
Jumlah
Beton balok BB (10/52) m3 1.000
28 Beton 1:3:5 m3 1.000 834,380.00
Begesting 2x pakai m2 20.000 57,122.93
Besi beton polos Ø8 kg 45.547 8605.602
Besi beton polos Ø10 kg 94.890 8,598.34
Jumlah
Beton balok B-1 (10/15) m3 1.000
29 Beton 1:3:5 m3 1.000 834,380.00
Begesting 2x pakai m2 13.333 57,122.93
Besi beton polos Ø6 kg 34.047 9,084.58
Besi beton polos Ø8 kg 105.265 8,605.60
Jumlah
Beton balok B-2 (10/20) m3 1.000
30 Beton 1:3:5 m3 1.000 834,380.00
Begesting 2x pakai m2 20.000 57,122.93
Besi beton polos Ø6 kg 35.527 9,084.58
Besi beton polos Ø10 kg 123.357 8,598.34
Jumlah
Beton balok B-3 (15/35) m3 1.000
31 Beton 1:3:5 m3 1.000 834,380.00
Begesting 2x pakai m2 13.333 57,122.93
31
Jumlah
Avur Bh 1.000
57 AER FS 04 SS Floor Strainer Pcs 1.000 14,500.00
AER FS 04 SS Floor Strainer Pcs 0.100 14,500.00
Tukang OH 0.151 150,000.00
Mandor OH 0.030 170,000.00
Jumlah
Septictank Bh 1.000
58 Galian M3 4.290 94,250.00
Bata Merah M3 1.185 422,556.50
Balok B1 M3 0.020 3,020,541.06
LC M3 0.100 564,295.00
Aci + Plesteran M2 12.100 60,350.63
Tutup cor M3 0.100 2,591,165.13
Jumlah
Resapan Bh 1.000
59 Galian M3 2.125 94,250.00
Bata Merah Kosong M3 1.304 41,250.00
LC M3 0.066 564,295.00
Aci + Plesteran M2 3.269 60,350.63
Tutup cor M3 0.079 2,591,165.13
Jumlah
Bak Kontrol Bh 1.000
60 Galian M3 0.064 94,250.00
Bata Merah M3 0.064 422,556.50
LC M3 0.008 564,295.00
Aci + Plesteran M2 0.640 60,350.63
Tutup cor M3 0.016 2,591,165.13
Jumlah
Spandek Kencana Lapis Peredam AZ100 M2 1.000
61 Spandek Kencana Lapis Peredam AZ100 Pcs 1.250 69,500.00
Seng Plat 0,2 mm x 90 cm M 0.733 30,000.00
Paku Asbes Sekrup Pcs 5.000 8,100.00
Pekerja OH 0.202 120,000.00
Tukang OH 0.252 150,000.00
Mandor OH 0.050 170,000.00
Jumlah
Meja Dapur Bh 1.000
62 Aci M2 0.420 10,275.00
Plester M2 0.420 30,340.00
Pemasangan List Alumunium M' 3.875 10,357.30
Cor 1:3:5 M3 0.155 214,765.38
Keramik M2 4.467 138,989.50
Jumlah
Ampyang M2 1.000
63 Batu Kerikil Hitam Sumbawa 5/7 20kg M2 0.210 25,000.00
Batu Kerikil Multi Colour 5/7 20kg M2 0.420 16,000.00
63
Jumlah
Batu Bobos RTA 20/40 M2 1.000
61 Batu Bobos RTA 20/40 M2 1.100 95,000.00
Semen PC 50 kg Zak 0.235 61,875.00
Pasir Pasang M3 0.035 165,000.00
Pekerja OH 0.425 120,000.00
Tukang OH 0.353 150,000.00
Mandor OH 0.035 170,000.00
Jumlah
Duma Ceiling Panel M2 1.000
61 Duma Ceiling Panel Pcs 1.050 150,000.00
Paku Asbes Sekrup Pcs 5.000 8,100.00
Pekerja OH 0.151 120,000.00
Tukang OH 0.252 150,000.00
Mandor OH 0.025 170,000.00
Jumlah
Woodplank M2 1.000
61 Woodplank Elephant Motif 4m x 20cm Pcs 1.250 44,000.00
Paku Asbes Sekrup Pcs 5.000 8,100.00
Pekerja OH 0.151 120,000.00
Tukang OH 0.252 150,000.00
Mandor OH 0.025 170,000.00
Jumlah
Pengerjaan Cat Woodplank m2 1.000
44 Mowilex Woodstain 503 klg 0.530 73,000.00
Kertas Gosok Halus Lbr 0.100 5,000.00
Tukang cat OH 0.064 150,000.00
Mandor OH 0.006 170,000.00
Jumlah
Pemasangan List Alumunium m' 1.000
68 Semen PC 40 kg zak 0.023 51,000.00
Pasir Pasang m3 0.003 205,000.00
M' 1.010 2,750.00
List Aluminium
Pekerja OH 0.007 120,000.00
Tukang Batu OH 0.030 150,000.00
Mandor OH 0.003 170,000.00
Jumlah
Pasang Lantai Keramik Mozaic m2 1.000
40 Keramik Mozaic m2 1.050 424,722.22
Semen kg 13.330 1,275.00
Pasir Pasang m3 0.045 205,000.00
Semen Putih kg 1.500 2,225.00
Pekerja OH 0.035 120,000.00
Tukang Batu OH 0.175 150,000.00
Mandor OH 0.004 170,000.00
Jumlah
Duma Pooldeck M2 1.000
61 Duma Pooldeck Pcs 1.250 65,517.24
Paku Asbes Sekrup Pcs 6.000 8,100.00
Pekerja OH 0.151 120,000.00
Tukang OH 0.252 150,000.00
Mandor OH 0.025 170,000.00
Jumlah
Pasang Dinding travertine m2 1.000
40 Granit Roman Travertine Noce m2 1.050 329,513.89
Semen kg 13.330 1,275.00
Pasir Pasang m3 0.045 205,000.00
Semen Putih kg 1.500 2,225.00
Pekerja OH 0.403 120,000.00
Tukang Batu OH 0.672 150,000.00
Mandor OH 0.067 170,000.00
Jumlah
Pasang Marmer m2 1.000
40 Marmer Dark Emperador Spain m2 1.010 925,000.00
Semen kg 13.330 1,275.00
Pasir Pasang m3 0.045 205,000.00
Semen Putih kg 1.500 2,225.00
Pekerja OH 1.074 120,000.00
Tukang Batu OH 1.792 150,000.00
Mandor OH 0.179 170,000.00
Jumlah
Pengerjaan Coating Carport m2 1.000
69 Propan Stone Care klg 0.253 177,500.00
Kertas Gosok Halus Lbr 0.100 5,000.00
Tukang cat OH 0.064 150,000.00000
Mandor OH 0.006 170,000.00000
Jumlah
ERJAAN
UAIAN 2020
Material Pekerja
(Rp) (Rp)
6 7 Name*
AER AOV 1A Kran Dapur
12,000.00 AER D11A/D99BX Kran Double
8,500.00 AER D33B Kran Shower
0.00 20,500.00 AER FS 04 SS Floor Strainer
AER SC 07C Jet Shower
33,000.00 AER Siphon SS Siphon Strainer
250.00 AER SOV 01A F Kran Tembok
19,250.00 AER TF 03C Kran Closet
12,000.00 AER TR 5J F Kran Tembok
15,000.00 AER YSH 5C Hand Shower
850.00 Aquaproof Abu-abu
52,500.00 27,850.00 Aquaproof Putih
Bata Merah
90,000.00 Bata Ringan Blesscon 60X20X10
4,250.00 Bata Ringan Fastcon 60x20x10
94,250.00 Bata Ringan GE 60x20x10
Bata Ringan GE 60x20x12,5
172,800.00 Batu Andesit Bakar Panca
12,240.00 Batu Andesit Basalto 25x60
18,000.00 Batu Andesit Basalto Hitam 10x60
185,040.00 Batu Andesit Basalto Hitam 15x60
Batu Andesit Basalto Hitam 20x60
181,500.00 Batu Andesit Basalto Hitam 5x60
36,000.00 Batu Andesit Bintik Panca 20x40
17,000.00 Batu Bobos RTA 20/40
Batu Gilang Kewal
Batu Gringging
87,500.00 Batu Kerikil Hitam Sumbawa 5/7 10kg
30,000.00 Batu Kerikil Hitam Sumbawa 5/7 20kg
4,250.00 Batu Kerikil Multi Colour 5/7 10kg
87,500.00 34,250.00 Batu Kerikil Multi Colour 5/7 20kg
Batu Lempeng Jember
11,040.00 Batu Pecah 2/3
1,564.00 Bendrat
12,604.00 Besi Ø05,0 - 12
Besi Ø07,5 - 12
Besi Ø09,5 - 12
Besi Ø06,0 - 12
Besi Ø08,0 - 12
Besi Ø10 - 12
346,500.00 Besi Ø11,5 - 12
14,206.50 Besi Ø12 - 12
6,600.00 Beton Ready Mix K-175
36,000.00 Canopi & Ralling Tangga
15,000.00 Canopy
1,700.00 Cat Avian Besi Hitam
2,550.00 Cat Dulux Aquashield Dark Grey 20L
367,306.50 55,250.00 Cat Dulux Aquashield Light Grey 20 L
Cat Dulux Catylax Moonstone 20 L
Cat Dulux Prof INT A700 White 20 L
Cat Dulux Prof. INT A700 Moonstone 20L
Cat Dulux Prof. Weathershield E1000 Brilliant White 20
36,000.00 Cat Dulux Weathershield Dark Dessert
15,000.00 Cat Dulux Weathershield E-1000 Coastal Beige 90R 51/
1,700.00 Cat Dulux Weathershield E-1000 Grey Tabby 00NN 16/
2,550.00 Cat Dulux Weathershield E1000 Castle Stone Rose 20L
55,250.00 Cat Dulux Weathershield E1000 Chocolate Bubble 20L
Cat Dulux Weathershield E1000 White Rabbit 50RR 72/
Cat Dulux Weathershield Sand White 20 Ltr
Cat Dulux Weathershield Sandsterling 20 Ltr
Cat Dulux Weathershield Ski Adventure 02BB 81/030
Cat Dulux Weathershield Slate Brown 20 Ltr
Cat Dulux Weathershield Song Porcelain 20 Ltr
Cat Nippe NP 517 1ltr
Closet Jongkok INA
Closet Monoblok Toto CW 633JW/F
8,538.75 Closet Toto CW660NJP / SW660J
7,175.00 Closet Toto SW420JP / CW421J
30,000.00 Damdex Multifungsi 20 ltr
340.00 Damdex Warna Primer 20 ltr
15,713.75 30,340.00 Drum Air
Duma Panel - Modern @ 4 Mtr - B2
618.75 Duma Panel - Modern @ 5 Mtr - B2
2,665.00 Eco Mortar 200 Skimcoat abu-abu 40kg
9,600.00 Eco Mortar 270 Skimcoat putih 40kg
6,000.00 Eco Mortar 301 Plaster 50kg
680.00 Eco Mortar 380 Thin Bed Adhesive 40kg
3,283.75 16,280.00 Eco Mortar 400 Perekat Keramik Multifungsi 40kg
Engsel 4 x 3
4,021.88 Engsel Hampton Stainless 4x3x2 2BB
9,000.00 Expander Plastik L 20-1/2 F
1,275.00 Expander Plastik L-20
4,021.88 10,275.00 Expander Plastik T-20
Expander Sock
284,625.00 Gembok
92,070.00 Genteng - Monier Exel Ridge (Fitting)
144,000.00 Genteng - Monier Exel Ridge End (Fitting)
30,000.00 Genteng - Monier Exel Verge
3,400.00 Genteng - Monier Multiline Midnight Black
10,200.00 Genteng - Monier Ridge Tree Natural
376,695.00 187,600.00 Genteng - Monier Starter (Fitting)
Genteng - Monier Three Way Apex (Fitting)
341,550.00 Genteng - Monier Top Flex 2 Anthracite
85,470.00 Genteng - Monier Verge End (Fitting)
149,240.00 Granit Serenity Classic White 60x60
198,000.00 Granit Serenity Crema White 60 x 60 YY1224
41,250.00 Granit Serenity Crystal White 80x80
4,760.00 Granit Serenity Crystal White India 80x80
14,110.00 Handle + Body Dekkson Stainless SST 02-0022 SS
576,260.00 258,120.00 HCL
Holo Galvalum 2 X 4
Holo Galvalum 4x4
210.00 Holo Sipatan (6 Meter)
840.00 Jendela Casement ex. Alexindo (Coating Putih)
1050.00 K6/01
119.00 K6/02
210.00 2009.00 Kaca Es 5MM
Kaca Polos 10 mm
43,355.86 Kaca Polos 5 mm
5,500.00 Kalsium 40 kg
3,750.00 Kawat Ayam
52,605.86 0.00 Kayu Gelam
26,400.00 Kayu Glugu 4/6 (4 meter)
4,420.00 Kayu Glugu 6/12 (4 Meter)
0.00 30,820.00 Kayu Meranti 3/5 (4 Meter)
26,302.93 0.00 Kayu Meranti 4/6 (4 Meter)
0.00 30,820.00 Keramik Asia Tile 25 X 25 Alpha White
26,302.93 30,820.00 Keramik Platinum Adore Grey Decor Embossed 25 x 40
Keramik Platinum Adore Grey Embossed 25 x 40 A23
55,000.00 Keramik Platinum Balkan Grey Basic 25X40 A91
5,000.00 Keramik Platinum Balkan Grey Decor Embossed 25x40
49,500.00 Keramik Platinum Cargo Dark Grey 30x30 A75L
30,625.00 Kertas Gosok 100
140,125.00 0.00 Kertas Gosok 150
79,200.00 Kitchen Sink Royal SB 35
49,500.00 Kitchen Sink Royal SB88
5,610.00 Kran Kamar Mandi
0.00 134,310.00 Kran Wastafel SAM W4C
70,062.50 70,062.50 Kusen Aluminium 4" ex. Alexindo (coating putih)
0.00 134,310.00 Laser Cutting Facade
70,062.50 204,372.50 Lem PVC 400gr
Lem Rajawali PVAc
65,450.00 Lis Siku Duma @ 5 Mtr - B2
5,000.00 List Aluminium (6 Meter)
41,250.00 List Atas Duma - B2 (5 Meter)
30,625.00 Mowilex Woodstain 503
170,000.00 Overpal 2 1/2"
312,325.00 0.00 Paku 1,5"
79,200.00 Paku 2"
49,500.00 Paku 3"
5,610.00 Paku Seng
0.00 134,310.00 Palungan
156,162.50 0.00 Pasir Cor
0.00 134,310.00 Pasir Plester
156,162.50 134,310.00 Perubahan Desain K6/01
Pintu Aluminium
82,500.00 Pintu Board WPC 82x240x0.5
5,000.00 Pintu Kamar Mandi
44,270.83 Pintu Kayu Semi Solid 82x240
41,930.00 Pintu Kayu Solid 82x240
173,700.83 0.00 Pintu MD Alur Petra 3P 760
79,200.00 Pintu MD Alur Petra 3P 820
49,500.00 Pintu MD Alur Petra 3P 840
5,610.00 Pipa PVC Rucika D 1 ¼"
0.00 134,310.00 Pipa PVC Rucika D 1 1/2"
86,850.42 Pipa PVC Rucika D 2 1/2"
0.00 134,310.00 Pipa PVC Rucika D 2" (4 Meter)
86,850.42 134,310.00 Pipa PVC Rucika D 3" (4 Meter)
Pipa PVC Rucika D 4" (4 Meter)
576,260.00 187,600.00 Pipa Westpex Cold Blue 20-100
625,321.67 138,286.07 Pipe fitting - knee 1 1/2"
765,462.27 363,841.00 Pipe Fitting - Knee 1¼
1,967,043.93 689,727.07 Pipe fitting - knee 2 1/2"
Pipe Fitting - Knee D 2"
576,260.00 187,600.00 Pipe Fitting - Knee D 3"
350,705.71 410,933.33 Pipe Fitting - Knee D 4"
362,556.67 84,590.76 Pipe Fitting - Sock 3 x 4"
848,743.33 198,259.60 Pipe fitting - Sock 3"
2,138,265.71 881,383.70 Plastik Cor
PowerBond Pro-678 Pengisi Nat Keramik 1kg
576,260.00 187,600.00 PowerBond Pro-688 Perekat Keramik Area Kering 40kg
306,867.49 359,566.67 PowerBond Pro-689 Perekat Keramik Area Basah 40kg
266,907.14 62,310.16 PowerBond Pro-788R Perata Lantai 50kg
151,523.81 35,403.50 PowerBond Pro-858 Finish Plaster (Render) 50kg
436,552.38 101,962.08 PowerBond Pro-868 Acian Plaster & Beton 40kg
1,738,110.83 746,842.41 PowerBond Pro-869 Acian Plasteran 40kg
PowerBond Pro-879R Plasteran 50kg
576,260.00 187,600.00 PowerBond Pro-889 Thin Bed Mortar 40kg
526,058.56 616,400.00 PowerBond Pro-B0 Beton Instan 50kg
416,881.11 92,190.71 PowerBond Pro-K175 Beton Instan 50kg
905,866.67 211,476.91 PowerBond Pro-K225 Beton Instan 50kg
2,425,066.34 1,107,667.62 PowerBond Pro-K250 Beton Instan 50kg
PowerBond Pro-K300 Beton Instan 50kg
576,260.00 187,600.00 PowerBond Pro-K350 Beton Instan 50kg
350,705.71 410,933.33 PowerBond PS-188 Waterproof 1kg
400,091.11 93,402.30 PowerBond PS-188 Waterproof 20kg
707,111.11 165,216.33 PowerBond PS-188 waterproof 4kg
2,034,167.93 857,151.97 PowerBond PS-199 Waterproof 50kg
PowerBond PS-199 Waterproof 5kg
576,260.00 187,600.00 Propan Stone Care Cat Batu Candi Black 2.5 Ltr
482,220.35 565,033.33 Propan Stone Care Pelapis Batu Alam Gloss 2.5 Ltr
305,730.00 71,373.46 Ralling Tangga & Balkon
353,555.56 82,608.17 Rangka Atap Galvalum
509,311.11 118,955.76 Rangka Atap Lisplank
2,227,077.01 1,025,570.72 Rangka Atap Lisplank & Plafon Duma
Rangka atap plus dinding spandex
576,260.00 187,600.00 Rangka Atap Spandex, plafon, lisplank
526,058.56 616,400.00 Rangka Plafon plus Gypsum
391,961.54 91,504.43 Reduser / Verlup Sock 2x3
815,897.44 190,634.23 Reduser / Verlup Sock 3x4
2,310,177.53 1,086,138.66 Reduser/Overloop 2 ke 1¼
Reel Sliding
576,260.00 187,600.00 Ring Expander
350,705.71 410,933.33 Roman Granit Gres Porcellanato Smaltato 120 x 60
309,298.89 68,399.56 Sales
905,866.67 211,476.91 Semen Gresik PPC (40 kg)
2,142,131.26 878,409.80 Semen Instan BB 180 Thinbed 40 kg
Semen Instan GE 50 kg
576,260.00 187,600.00 Semen Instan JR Mortar 40kg
526,058.56 616,400.00 Semen Instan Mortar
322,746.67 71,373.46 Semen Putih Tiga Roda 40 kg
1,060,666.67 247,824.50 seng gelombang 0,2 mm x 210 cm
2,485,731.89 1,123,197.96 Seng Gelombang 0,2 mm x 300 cm
Seng Gelombang BLJS Gajah Surya 0,2 mm x 240 cm
576,260.00 187,600.00 Seng Plat 0,2 mm x 90 cm
350,705.71 410,933.33 Silen
218,579.75 48,337.58 Sirtu Urug
606,095.24 141,614.00 Spandex 400x035 peredam
1,751,640.70 788,484.91 Tahap 1
Tee 1 1/2"
576,260.00 187,600.00 Tee 2"
573,882.06 672,436.36 Tee 3"
238,392.42 52,719.03 Tee Tekuk (Pipa Hawa) 1¼
771,393.94 180,236.00 Thiner A Spesial
2,159,928.43 1,092,991.39 Triplek Meranti 4 mm
Triplek Meranti 8 mm
576,260.00 187,600.00 Triplek Sengon 3 mm
580,856.33 680,608.33 Triplek Sengon 8 mm
222,928.13 52,043.15 Tutup Pipa 4"
331,582.75 77,445.16 Wastafel Toto LW236J
1,711,627.20 997,696.63 Wiremesh M5
Wiremesh M6
704,000.00 Woodplank Elephant Motif 4m x 20cm
1,301,302.11 1,119,205.23
0.00 0.00
1,308,051.53 305,368.00
3,313,353.65 1,424,573.23 0.245535714285714
685,388.48 216,490.00
263,029.28 308,200.00 26.6666666666667
122,840.28 27,165.38 0.315794285714286
784,830.92 183,220.80 7.40142857142857
1,856,088.96 735,076.18
77,000.00
18,000.00 16.6666666666667
11,250.00 0.434217142857143
1,360.00 7.40142857142857
77,000.00 30,610.00 10.6580571428571
16,825.00
36,850.00 66.6666666666667
89,000.00 0.137666571428571
48,000.00 4.73691428571429
30,000.00
340.00
142,675.00 78,340.00
22.2222222222222
11,883.00 0.418427428571429
4,316.50 7.40142857142857
2,970.00
88,775.00
4,200.00
26,250.00 16.6666666666667
595.00 0.426322285714286
107,944.50 31,045.00 7.40142857142857
10.6580571428571
11,883.00
3,337.50
2,970.00 19.2307692307692
88,775.00 0.355268571428571
3,900.00 7.40142857142857
22,500.00
3,400.00
106,965.50 29,800.00
66.6666666666667
11,883.00 0.102139714285714
3,337.50 4.73691428571429
7,425.00
50,196.00
3,900.00
22,500.00 50
3,400.00 0.142107428571429
72,841.50 29,800.00 7.40142857142857
134,400.00
16,995.75
7,425.00 19.047619047619
3,337.50 0.252635428571429
10,400.00 7.40142857142857
60,000.00
9,066.67 18.1818181818182
162,158.25 79,466.67 0.288655714285714
7.40142857142857
1,160.40
4,800.00
500.00 20.8333333333333
9,534.00 0.186516
1,079.50 7.40142857142857
6,460.40 10,613.50
142.80
14,493.75 4.16666666666667
500.00 0.102139714285714
9,534.00 4.73691428571429
1,079.50
15,136.55 10,613.50
9,600.00
1,250.00 0.253128857142857
9,534.00 4.73691428571429
1,079.50
10,850.00 10,613.50
28,987.50
1,250.00 1.14
9,534.00
1,079.50
30,237.50 10,613.50
13,781.25
11,350.50
1,285.20
13,781.25 12,635.70 14.4896
9,170.80
908.00
4,356.00
9,000.00
340.00
10,078.80 13,696.00
518000
15,331.80
1,518.00
4,356.00
9,000.00
306.00
16,849.80 13,662.00
12,000.00
4,200.00
4,356.00
9,000.00
306.00
16,200.00 13,662.00
15,300.00
5,355.00
3,000.00
6,540.00
13,620.00
462.40
23,655.00 20,622.40
27,000.00
9,450.00
9,804.00
20,430.00
697.00
36,450.00 30,931.00
42,300.00
14,805.00
9,804.00
20,430.00
697.00
57,105.00 30,931.00
1,394,000.00
83,640.00
9,804.00
166,350.00
226,270.00
1,477,640.00 402,424.00
87,000.00
8,700.00
22,695.00
5,134.00
95,700.00 27,829.00
195,750.00
19,575.00
22,695.00
5,134.00
215,325.00 27,829.00
800,000.00
80,000.00
22,695.00
5,134.00
880,000.00 27,829.00
137,750.00
13,775.00
22,695.00
5,134.00
151,525.00 27,829.00
14,500.00
1,450.00
22,695.00
5,134.00
15,950.00 27,829.00
404,332.50
435,258.20 65,471.25
41,771.56 17,128.99
37,669.50 18,760.00
238,801.06 252,300.13
185,608.90 73,507.62
939,109.22 831,500.48
200,240.86
478,784.02 72,018.38
25,009.86 12,455.30
145,835.56 57,755.99
649,629.44 342,470.52
6,032.00
23,507.62 3,536.00
3,013.56 1,500.80
12,630.80 16,632.80
29,697.42 11,761.22 21.55
68,849.40 39,462.82
86,875.00
21,990.00
40,500.00
24,228.00
37,800.00
8,500.00
149,365.00 70,528.00
#NAME? 4,315.50
#NAME? 12,742.80
17,651.79 22,482.75
#NAME? 113,569.27
482,188.08 138,678.02
#NAME? 291,788.33
5,250.00
6,720.00
10,350.00
801.87
5,931.30
14,538.60
18,161.10
2,056.66
1,028.33
29,053.17 35,784.69
1,162.80
55.63
495.00
2,777.50
14,080.00
792.00
4,500.00
6,800.00
18,570.93 12,092.00
618.75 -
394.63 -
- 37,500.00
- 17,000.00
1,013.38 54,500.00
25,000.00
6,120.00 -
1,650.00 -
581,000.00
- 21,900.00
- 17,000.00
588,770.00 38,900.00
217,500.00
21,750.00
22,695.00
5,134.00
239,250.00 27,829.00
126,875.00
12,687.50
22,695.00
5,134.00
139,562.50 27,829.00
104,500.00
14,540.63
5,775.00
51,000.00
52,950.00
5,950.00
124,815.63 109,900.00
157,500.00
40,500.00
18,120.00
37,725.00
4,284.00
198,000.00 60,129.00
55,000.00
40,500.00
18,120.00
37,800.00
4,284.00
95,500.00 60,204.00
38,690.00
500.00
9,534.00
1,079.50
39,190.00 10,613.50
1,162.80
615.00
2,777.50
792.00
4,500.00
510.00
4,555.30 5,802.00
445,958.33
16,995.75
9,225.00
3,337.50
4,200.00
26,250.00
595.00
475,516.58 31,045.00
81,896.55
48,600.00
18,120.00
37,800.00
4,284.00
130,496.55 60,204.00
345,989.58
16,995.75
9,225.00
3,337.50
48,320.00
100,800.00
11,424.00
375,547.83 160,544.00
934,250.00
16,995.75
9,225.00
3,337.50
128,853.33
268,800.00
30,464.00
963,808.25 428,117.33
44,907.50
500.00
9,534.00
1,079.50
45,407.50 10,613.50
*Unit BuyPrice ProductCategory
Pcs 195,750.00 Material
Pcs 217,500.00 Material
Pcs 217,500.00
Pcs 14,500.00 Material
Pcs 137,750.00 Material
Pcs 108,750.00 Material
Pcs 87,000.00
Pcs 126,875.00 Material
Pcs 87,000.00 Material
Pcs 217,500.00 Material
Pail 787,500.00
Pail 787,500.00
Unit 550.00 Material
M3 525,000.00 Material
M3 500,000.00 Material
M3 529,999.80 Material
M3 0.00 Material
M2 115,000.00 Material
M2 230,000.00 Material
M2 230,000.00 Material
M2 230,000.00 Material
M2 230,000.00 Material
M2 230,000.00 Material
M2 115,000.00 Material
M2 95,000.00 Material
M2 55,000.00 Material
Rit 5,500,000.00
zak 0.00 Material
zak 25,000.00 Material
zak 0.00 Material
zak 16,000.00 Material
M 55,000.00
M3 280,000.00 Material 74
kg 14,000.00 Material
Pcs 19,500.00 Material 60
Pcs 35,000.00 Material
Pcs 53,000.00 Material 0.25263543 15.158126
Pcs 24,206.00 Material 2.66451429 9084.5826
Pcs 40,764.00 Material 4.73691429 8605.6022 44.4 59.558126
Pcs 63,640.00 Material 7.40142857 8598.3401 132.35139
Pcs 83,000.00 Material
Pcs 91,676.00 Material 10.6580571 8601.5677
M3 704,000.00 0.45
Pcs 0.00
M2 410,000.00
Pcs 58,000.00
Pail 663,750.00
Pail 825,000.00
Pail 610,000.00
Unit 480,000.00 Material
Unit 480,000.00 Material
Pail 1,449,375.00 Material
Pail 2,197,000.00
Unit 1,449,375.00 Material
Unit 1,449,375.00 Material
Unit 1,449,375.00 Material
Unit 1,449,375.00 Material
Unit 1,449,375.00 Material
Pail 1,449,375.00
Pail 2,199,000.00
Pail 1,449,375.00
Pail 2,107,000.00
Pail 2,142,000.00
Pcs 68,000.00 Material
Unit 130,000.00
Unit 1,394,000.00
Unit 2,210,000.00 Material
Pcs 2,210,000.00
Unit 828,625.00 Material
Unit 673,750.00 Material
Pcs 165,000.00
Dos 570,000.00
Dos 712,500.00
zak 49,000.00 Material
zak 64,000.00 Material
zak 35,750.00 Material
zak 44,000.00 Material
zak 49,000.00 Material
Pcs 15,000.00
Set 31,750.00 Material
Pcs 7,400.00 Material
Pcs 6,480.00
Pcs 6,480.00
Pcs 8,000.00
Pcs 25,000.00
Unit 12,050.00 Material
Pcs 17,800.00 Material
Pcs 14,000.00 Material
Pcs 7,700.00 Material
Pcs 17,500.00 Material
Unit 17,800.00
Unit 17,800.00
Roll 368,500.00 Material
Unit 17,800.00 Material
M2 79,000.00
M2 82,000.00 Material
M2 128,000.00 Material
M2 120,000.00
Set 261,000.00
Liter 10,000.00
Pcs 15,500.00
Pcs 22,000.00 Material
Pcs 100,000.00
M2 500,000.00 Subcontractor
Unit 0.00 Service
Unit 0.00 Service
M2 125,000.00
Pcs 700,000.00
M2 85,000.00 Subcontractor
zak 26,000.00
Unit 60,000.00
Unit 9,000.00
Pcs 27,500.00
Unit 85,000.00 0.0288 2951388.89
Unit 16,500.00 Material 0.006 2750000
Unit 26,400.00 0.0096 2750000
M2 47,000.00
M2 68,000.00 Material
M2 68,000.00 Material
M2 67,000.00 Material
M2 71,500.00 Material
Dos 47,000.00 Material
M 5,000.00 Material
M 5,000.00 Material
Unit 192,500.00 Material
Pcs 347,000.00
Pcs 12,500.00
Pcs 362,500.00
M1 85,000.00
Unit 0.00
Pcs 34,000.00
kg 12,500.00
Pcs 67,500.00
Unit 16,500.00
Pcs 112,500.00
Pcs 73,000.00
Pcs 7,500.00
kg 13,500.00 Material
kg 12,500.00 Material
kg 12,500.00
kg 30,000.00
Pcs 400,000.00
M3 165,000.00
M3 205,000.00 Material
Unit 0.00 Service
Pcs 1,600,000.00
Pcs 1,087,500.00
Unit 1,500,000.00 Subcontractor
Pcs 800,000.00
Pcs 950,000.00
Unit 852,500.00
Unit 880,000.00
Unit 880,000.00
Pcs 35,000.00 Material
Pcs 40,000.00 Material
Pcs 67,500.00
Pcs 51,000.00 Material
Pcs 90,000.00
Pcs 141,000.00 Material
M 9,080.00 Material
Pcs 1,400.00
Pcs 1,250.00
Pcs 4,000.00 Material
Pcs 2,100.00 Material
Pcs 5,600.00 Material
Pcs 10,250.00
Pcs 0.00
Pcs 0.00 Material
Pcs 6,000.00 Material
Dos 10,000.00 Material
zak 58,000.00 Material
zak 59,000.00 Material
zak 0.00 Material
zak 59,000.00 Material
zak 62,000.00 Material
zak 54,000.00 Material
zak 36,000.00 Material
zak 53,000.00 Material
zak 0.00 Material
zak 37,000.00 Material
zak 44,500.00 Material
zak 46,000.00 Material
zak 47,000.00 Material
zak 55,000.00 Material
Pail 39,000.00 Material
Pail 615,000.00 Material
Pail 143,000.00 Material
Set 550,000.00 Material
Set 115,000.00 Material
Pcs 177,500.00 Material
Pcs 169,000.00 Material
M2 425,000.00
M2 125,000.00
M1 55,000.00
Unit 0.00
Pcs 0.00
Unit 0.00
M2 65,500.00
Pcs 2,800.00
Pcs 6,000.00
Pcs 2,500.00
Pcs 600,000.00
Pcs 314.40 Material
M2 0.00 Material
Pcs 0.00
zak 49,500.00 61875 50kg
Pcs 65,000.00
zak 59,999.50
zak 0.00 Material
zak 55,000.00
zak 89,000.00 Material
Pcs 58,000.00
Pcs 82,500.00
Pcs 66,000.00 Material
M 30,000.00
Pcs 7,500.00
M3 87,500.00
Pcs 278,000.00
Unit 0.00
Pcs 2,300.00
Pcs 3,200.00
Pcs 6,700.00
Pcs 2,000.00
Liter 18,000.00
Unit 72,500.00
Pcs 96,000.00
Pcs 43,000.00 Material
Unit 87,500.00 0.0444 1970720.72
Pcs 4,500.00
Unit 581,000.00
Pcs 310,000.00
Roll 0.00
Pcs 44,000.00
482979.54
13.333333
18.947657 42.105904761905 *hak 10xDx2
44.408571 98.685714285714
11.666667
26.053029 31.015510204082 *hak 10xDx2
14.802857 17.622448979592
42.632229 50.752653061225
20
8.2599943 45.888857142857 *hak 10xDx2
18.947657 105.26476190476
13.333333
25.105646 46.491936507937 *hak 10xDx2
44.408571 82.238095238095
18.333333
25.579337 35.526857142857 *hak 10xDx2
29.605714 41.119047619048
42.632229 59.211428571429
20
28.421486 45.547252747253 *hak 10xDx2
59.211429 94.89010989011
13.333333
6.1283829 34.046571428572 *hak 10xDx2
18.947657 105.26476190476
20
8.5264457 35.526857142857 *hak 10xDx2
29.605714 123.35714285714
13.333333
15.158126 24.060517006803 *hak 10xDx2
44.408571 70.489795918367
21.818182
17.319343 26.241428571429 *hak 10xDx2
59.211429 89.714285714286
22.083333
14.92128 25.905 *hak 10xDx2
22.204286 38.549107142857
16.666667
6.1283829 34.046571428572 *hak 10xDx2
18.947657 105.26476190476
15.187731 13.521840659341 *hak 10xDx2
18.947657 105.26476190476
6.6666666666667
0.2939074 0.0209933824457
0.5830389 0.0416456335184
0.1230538 0.0087895554644
0.7329932
P L T jml V Luas
Sloof S1 34.5 0.15 0.25 1.29375 5.175
Sloof S2 81.4 0.2 0.35 5.698 16.28
PC 2 0.8 0.8 0.3 13 2.496 0.64
PC 3 0 0 0 0 0 0
PC 1 0.6 0.6 0.3 5 0.54 0.36
Rollag 14.5 0.2 0.6 1.74 8.7
LC 0.05 1.593625 31.8725
Urugan tanah kmbl 5.026
Urugan Sirtu Rumah 0.5 28.90625 57.8125
Trasram 115.9 0.11 0.5 6.3745
Dinding 362.2988
Dinding Sopi 29.9668
Penebalan dinding 0.1 2.52708 25.2708
PJ1 1.545 2.74 1 4.2333
PJ2 1.795 2.74 1 4.9183
PJ3 3.275 2.74 1 8.9735
PJ3 2.32 2.74 1 6.3568
PJ3 4.775 2.74 1 13.0835
P1 0.92 2.74 4 10.0832
P2 0.82 2.14 3 5.2644
P2A 0
J1 0.68 2.74 1 1.8632
J2 0.85 2.74 1 2.329
J3 1 0.48 1 0.48
J4 0 0 0
BV1 0.3 1.9 1 0.57
BV2 0 0 0 0
BV K1 1.35 2.74 1 3.699
BV K2 0.3 2.74 1 0.822
Strous 3 31 4.5669643 0.0491071
K1 0.15 0.1 88.3 1.3245
K2 0.15 0.3 107.9 4.8555
K3 0 0 0 0 0
B1 72.33 0.15 0.1 1.08495
B2 40.05 0.1 0.2 0.801
B3 86 0.15 0.35 4.515
B4 0 0.0725 0
B5 0 0.1 0.48 0
BB 0 0.1 0.52 0
Dak Lantai 0.12 11.7291 97.7425
Dak Atap 0.12 0.3798 3.165
Plesteran dinding 754.5644
Woodplank 11.7469
WPC 0
Pekerjaan Benangan 18.58 31.92
Cat Teksture 70.56
Railing Tangga 10.059761
Dinding dlam 583.9354
Dinding Luar 170.629
Aqua Proof 239.657
Tiang Pancang 6 0 0
12.48
0
3.6
2.545 7.025
2.795 7.275
4.275 8.755
3.32 7.8
5.775 10.255
7.68 25.6
5.46 15.3
0 0
1.68 6.16
1.85 6.33
2 1.96
0 0
1.3 4.1
0 0
2.35 6.83
1.3 5.78
0.1253644
I. PEKERJAAN PERSIAPAN :
1 Pembersihan Lapangan M2 94.79 20,500 1,943,168
20,500 1,943,168
II. PEKERJAAN PONDASI :
1 Pasangan Bouplank M' 55.60 27,850 1,548,460
2 Galian Tanah Biasa M3 10.03 94,250 945,115
3 Galian Tanah Biasa 2m (Kolam) M3 25.71 96,750 2,487,053
4 Galian Pondasi Rolaag Teras M3 1.74 94,250 163,995
5 Pekerjaan Lantai kerja Pondasi M3 1.59 187,600 298,964
6 Pasangan Batu Kali 1 : 4 M3 - -
7 Pasangan Bata Merah Pondasi Rollag M3 1.74 55,250 96,135
8 Urugan Tanah Kembali M3 5.03 12,604 63,348
9 Urugan Sirtu M3 23.88 34,250 817,899
602,804 6,420,969
III. PEKERJAAN BETON
A. PONDASI
1 Pemancangan Tiang Pancang Mini Pile 20x20cm M' - - -
2 Bekisting Pilecap M2 16.08 30,820 495,586
3 Pasangan Beton Bertulang 1 : 3 : 5
- Strous M3 4.57 689,727 3,149,959
- Strous (Kolam) M3 1.18 689,727 812,893
- Pilecap Ø10 M3 3.04 319,257 969,264
- Sloof 15/25 + Bekisting M3 1.29 881,384 1,140,290
- Sloof 20/35 + Bekisting M3 3.64 746,842 2,718,506
- Sloof 20/35 + Bekisting (Kolam) M3 2.06 746,842 1,537,002
4,104,599 10,823,499
B. KOLOM
- Kolom 10/15 + Bekisting M3 1.32 1,107,668 1,467,106
- Kolom 15/30 + Bekisting M3 4.86 857,152 4,161,901
1,964,820 5,629,007
C. BALOK
- Balok B1 10/15 + Bekisting M3 1.08 1,123,198 1,218,614
- Balok B2 10/20 + Bekisting M3 0.80 1,123,198 899,682
- Balok B3 15/35 + Bekisting M3 4.52 788,485 3,560,009
- Balok B4 10/55 + Bekisting M3 - 1,092,991 -
- Balok B5 10/48 + Bekisting M3 - 997,697 -
- Balok BB 10/52 + Bekisting M3 - 1,086,139 -
6,211,708 5,678,305
D. LANTAI
- Plat Lantai K-250 t=12cm + Bekisting M3 11.73 1,424,573 16,708,962
- Plat Lantai K-250 t=10cm + Bekisting (Kolam) M3 4.50 1,424,573 6,417,617
- Plat Dak 1:2:3 t=10cm + Bekisting M3 0.38 735,076 279,182
- Plat Dak 1:2:3 t=10cm + Bekisting (Pompa) M3 1.09 735,076 798,293
- Rabat Lantai M3 5.78 214,765 1,241,612
- Rabat Lantai Pooldeck M3 1.16 214,765 248,108
4,748,830 25,693,774
IV. PEKERJAAN DINDING
A. PASANGAN DINDING
1 Pasangan Dinding Bata Merah M3 8.90 55,250 491,812
2 Pasangan Dinding Bata Ringan GE M2 362.30 55,250 20,017,009
3 Pasangan Dinding Bata Ringan GE Dinding Sopi M2 29.97 55,250 1,655,666
165,750 22,164,487
B. PENUTUP DINDING
1 Plesteran Dinding 20mm 1 : 5 M2 754.56 30,340 22,893,484
2 Plesteran Dinding 20mm 1 : 5 (Kolam) M2 48.81 30,340 1,480,877
3 Acian Dinding M2 754.56 10,275 7,753,149
4 Acian Dinding (Kolam) M2 48.81 10,275 501,517
5 Benangan M' 295.01 16,280 4,802,787
6 Ban-banan 10x5cm M' 25.65 54,500 1,397,925
152,010 38,829,739
V. PEKERJAAN ATAP :
1 Penutup Atap Genteng Beton M2 77.55 30,610 2,373,806
2 Wuwung Genteng Beton M' 33.25 78,340 2,604,805
3 Pas. Lisplang Gypsum M' 39.20 - -
4 Pekerjaan rangka atap baja ringan M2 39.50 - -
4,978,611
VI. PEKERJAAN PLAFOND :
1 Pas Rangka Plafond Plus Gypsum M2 103.02 - -
2 List Plafond Gypsum 5CM M' 153.63 - -
- -
VII. PEKERJAAN LANTAI :
1 Pas. Granit 80/80 M2 91.17 79,467 7,245,032
2 Pas. Keramik Mozaik Kolam M2 48.81 31,045 1,515,288
3 Pas. Duma Pooldeck M2 11.55 60,204 695,507
4 Pas. Keramik 30/30 lantai teras M2 9.63 29,800 287,072
5 Pas. Keramik 40/40 lantai km/wc M2 7.15 29,800 213,106
6 Pas. Keramik 40/40 dinding km/wc M2 42.63 31,045 1,323,448
7 Plint Lantai M' 132.63 12,092 1,603,702
261,361 12,883,154
VIII. PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu Ttk 17.00 - -
2 Titik Stop Kontak Ttk 16.00 - -
3 Titik Stop Kontak AC Ttk 5.00 - -
4 Titik MCB Ttk 6.00 - -
5 Down Light Out BOO Ttk - - -
6 Down Light In BOO Ttk 17.00 - -
7 Ground/Arde Ttk 1.00 - -
8 Power/Pudeng M' 39.59 - -
9 Fuse/Box Pcs 2.00 - -
10 Stop Kontak Pompa Ttk 2.00 - -
- -
IX. PEKERJAAN INSTALASI AIR :
1 Saluran Air Bersih Westpex Ø 20mm M' 53.55 13,696 733,421
2 Saluran Pipa Air Panas M' 5.70 13,662 77,873
3 Pipa Hawa PVC Ø 1 1/4" M' 5.95 11,100 66,045
4 Pipa air kotor wastavel dan zink PVC Ø 1,5" M' 5.70 13,662 77,873
5 Pipa Pembuangan Air Kotor PVC Ø 2" M' 53.40 20,622 1,101,236
6 Saluran Air Limbah PVC Ø 3" M' 30.50 30,931 943,396
7 Saluran Air Tinja PVC Ø 4" M' 26.90 30,931 832,044
134,604 3,831,888
X. PEKERJAAN SANITAIR :
1 Closet Monoblok Toto CW 633JW/F Bh 3.00 402,424 1,207,272
2 Kitchen Sink Royal SB 35 Bh 1.00 13,500 13,500
3 Kran Dinding AER TR 5J F Bh 2.00 27,829 55,658
4 Kran Wastafel AER AOV 1A Bh 1.00 27,829 27,829
5 Mixer Shower AER SAS BX1 Bh 3.00 27,829 83,487
6 Hand Shower AER YSH 5C Bh 3.00 27,829 83,487
7 Kran Closet AER TF 03C Bh 3.00 27,829 83,487
8 Jet Shower AER SC 07C Bh 3.00 27,829 83,487
9 Floor Strainer AER FS 04 SS (Avur) Bh 3.00 27,829 83,487
10 Pemasangan Fitting Saluran Air Panas Bh 6.00 22,686 136,116
11 Pekerjaan Septictank Bh 1.00 831,500 831,500
12 Pekerjaan Sumur Resapan Bh 1.00 342,471 342,471
13 Pemasangan Tandon Air 1m3 Bh 1.00 - -
14 Pemasangan Tandon Balancing Kolam 2m3 Bh 1.00 - -
15 Pas. Bak Kontrol 40x40 Bh 4.00 39,463 157,851
1,846,847 3,189,632
XI. PEKERJAAN PENGECATAN :
1 Pengecatan Dinding dalam M2 583.94 10,614 6,197,598
2 Pengecatan Dinding luar M2 170.63 10,614 1,810,971
3 Pengecatan Tekstur M2 70.56 19,215 1,355,810
4 Pengecatan Plafond M2 103.02 10,614 1,093,401
5 Pengecatan Lisplang M2 11.76 10,614 124,815
6 Pelapisan Aquaproof Kolam (5x) M2 48.81 63,179 3,083,705
7 Pelapisan Aquaproof M2 239.66 12,636 3,028,234
137,483 16,694,534
XII. PEKERJAAN PINTU & JENDELA :
1 - Pintu Tipe PJ1 Bh 1.00 178,500 178,500
- Pintu Tipe PJ2 Bh 1.00 178,500 178,500
- Pintu Tipe PJ3 Bh 1.00 - -
- Pintu Tipe PJ4 Bh 1.00 - -
- Pintu Tipe PJ5 Bh 2.00 - -
- Pintu Tipe P1 Bh 3.00 178,500 535,500
- Pintu Tipe P2 Bh 3.00 - -
- Jendela Tipe PJ1 M2 1.88 - -
- Jendela Tipe PJ3 M2 3.73 - -
- Jendela Tipe PJ4 M2 1.86 - -
- Jendela Tipe J1 M2 1.86 - -
- Jendela Tipe J3 M2 0.48 - -
- Jendela Tipe J4 M2 - - -
2 Kusen Alumunium 4"
- Pintu Tipe PJ1 M' 10.49 - -
- Pintu Tipe PJ2 M' 10.99 - -
- Pintu Tipe PJ3 M' 19.45 - -
- Pintu Tipe PJ4 M' 14.78 - -
- Pintu Tipe PJ5 M' 24.39 - -
- Pintu Tipe P1 M' 25.60 - -
- Pintu Tipe P2 M' 15.30 - -
- Jendela Tipe J1 M' 6.84 - -
- Jendela Tipe J2 M' 7.18 - -
- Jendela Tipe J3 M' 2.96 - -
- Jendela Tipe J4 M' - - -
3 Kaca Tebal 5mm
- Jendela Tipe PJ2 M2 2.56 - -
- Jendela Tipe PJ3 M2 2.96 - -
- Jendela Tipe PJ4 M2 2.03 - -
- Jendela Tipe PJ5 M2 8.70 - -
- Jendela Tipe J2 M2 2.33 - -
- Jendela Tipe BV1 *Kaca Es M2 0.57 - -
- Jendela Tipe K1 *8mm M2 3.70 - -
- Jendela Tipe K2 M2 0.82 - -
- Kaca Kombinasi Railing untuk Fasad M2 7.13 - -
4 Handle + Body Dekkson Stainless SST 02-0022 SS Bh 6.00 - -
535,500 892,500
XIII. FINISHING :
1 Laser Cutting LS 1.00 - -
2 Railing Tangga M2 12.28 - -
3 Pas. Marmer Dark Emperador Spain M2 30.44 - -
- -
XIV. PEKERJAAN LAIN - LAIN :
1 Rabat untuk Carport + Inrit M3 1.72 735,076 1,266,169
2 Ampyangan(Include list dan batu andesit) + Inrit M2 34.45 46,398 1,598,418
3 Palungan Ls 1.00 - -
4 Meja Dapur Bh 1.00 291,788 291,788
5 Pas. List Pembatas Kavling M' 27.60 5,802 160,144
6 Aksesoris Kolam
- Pompa Emaux SPH 1,5 Hp Bh 1.00 - -
- Sand filter emaux v 650 Bh 1.00 - -
- Maindrain Square 30 x 30 Bh 1.00 - -
- Walt Inlet Bh 2.00 - -
- Vacuum Fitting Bh 4.00 - -
- Telescopic handle 2.4 - 4.8 m Hayward Bh 1.00 - -
- Lampu Emaux LED Bh 2.00 - -
- Vacuum house 9 m Hayward Bh 1.00 - -
- Vacuum Head 8 roda Hayward Bh 1.00 - -
- Leaf Rake Hayward Bh 1.00 - -
- Pool Brom / Wall Bruss Hayward Bh 1.00 - -
- Test Kit Hayward Bh 1.00 - -
- Piping, Electrical, Material & Instalation Ls 1.00 - -
- Power Panel Control Timer Ls 1.00 - -
1,079,065 3,316,519
REKAPITULASI RENCANA ANGGARAN BIAYA
RAB B3/05 TIPE 180-140 EDELWEISS SAFIRA GARDEN
PEKERJA
NO. URAIAN PEKERJAAN
RP