Project: Establishment of 200 bedsss centre of excellencr for gynacology and

obstetrics at Rawalpindi
Demand for material
Al-Awan electric works and construction company
07-Jul-20
S# Description Unit Size Actual Qty Final Qty Rermarks

1 Cable RFT 25mm 4core 100

2 Cable RFT 10mm 4core 1400

3 Cable RFT 6mm 4 core 150

Cable Coil 1.5mm 2

4 Breaker 3phase No 150amp 1

5 Breaker 3phase No 35amp 3

6 Connector strip No 100amp 12

7 Wooden screw No 1.1/2" 100

8 Flood light(for Workshop) No 4

9 Ceiling fan No 4

10 Led light for office No 9

11 6 Gang sheet No 4

12 Power plug No 2

13 Light plug no 4

15 Ac No 1 1

16 Ac No 1.5 1

17 Pvc Duct RFT 200