Job Name: Overboard Blank Installation of SUMMIT LNG
Diving Time Divers Name Job Done Date: 30th January 2022 1. Divers fitted the Modified Jack in Place of STBD Ballast- Ballast Pos.17. Size 850A. Md. Sumon Hawlader Underwater Visibility found Poor. 0959 hrs – 1150 hrs Md. Saiful Islam 2. Divers retrieved MC Overboard-Pos.4.Size Overboard 1400 A from the floating Condition. J bolt found Bend Similar to STBD Ballast-Pos.17. Ballast Size 850A. Rubber Seal found partiallyly Damage. MC Overboard-Pos.4.Size 1400 A