RESEARCH AND TECHNICAL LEGISLATION DIVISION, LOCAL GOVERNMENT DEPARTMENT
DEALING WITH CONSTRUCTION PERMITS (DCP)
Dealing With
Construction
Permits
Measuring Tools
2016 PROCEDURE
15 Interaction between investors and
regulators
TIME
189 Countries Time taken by regulators to complete
procedures
COST
28 Official Cost (% of Income / capita)
2015
4
RESEARCH AND TECHNICAL LEGISLATION DIVISION, LOCAL GOVERNMENT DEPARTMENT
Issue 1(a):
To Develop Malaysia Airport Academy, Sepang
MP Sepang:
1. Late Issuance of • MP Sepang to establish/
Planning Permission i. Approval of introduce clear guideline on
subsequent plans parking requirement.
delayed
- No Clear
ii. Confuse and • MP Sepang to issue Planning
Guidelines on
frustrate Permission immediately and to
Parking
Requirement. stakeholders ensure all conditions imposed
iii. Increase cost of are made known to project
- No Clear doing business owner.
Guideline/ iv. Development
Procedure in delayed
Offering Planning
Permission.
Issue 1(b):
To Develop Malaysia Airport Academy, Sepang
Immediate
•JKR Sepang to withdraw the condition
JKR Sepang:
imposed on ROW for MAB.
-Imposed condition on
i. Planning permission •Imposition of any condition should be
requirements for new
delayed consistent with report.
Right of Way (ROW)
ii. Confuse project
2. without guideline.
owner Long term
-Imposed condition
iii. Increase cost of doing •JKR to establish and publish ROW
contradicts with Traffic
business guideline.
Impact Assessment (TIA).
•JKR to enforce guideline only when the
guideline is made known to investor prior
to development.
JPS imposed:
-Owner to construct an i. Planning permission
JPS not to exercise double charging. JPS
On-Site-Detention(OSD). delayed
3. has to choose whether owner to
-Owner to pay OSD ii. Increase cost of doing
construct OSD or pay OSD contribution.
Contribution business
(RM600,000). 6
Issue 1(b):
To Develop Malaysia Airport Academy, Sepang
8
RESEARCH AND TECHNICAL LEGISLATION DIVISION, LOCAL GOVERNMENT DEPARTMENT
Issue 1:
To Redevelop 4 storey building on Existing 2 storey Building –
Jalan Teluk Pulai, Klang
i. Development
delayed
ii. Project Owner
Confused • MP Klang to accept and process
Building Plan to allow
MP Klang: iii. Project owner commencement of work.
Imposition of victimized (was
1. Condition without denied submitting • MP Klang to establish clear and
Guideline (Floor to building plans) practical guideline on Floor to
Floor Height Control) iv. Cumbersome Floor Height Control. Guideline
processes (earlier should be accessible to public.
KM approval
expired)
v. Increase cost of
doing business 9
Majlis Perbandaran Kajang
• Rejection by OSC on Kanun Tanah
Negara’s issues
10
RESEARCH AND TECHNICAL LEGISLATION DIVISION, LOCAL GOVERNMENT DEPARTMENT
• Project Owner
• Consultants
• Local Authorities
• Technical Agencies
• Contractor ?
11
RESEARCH AND TECHNICAL LEGISLATION DIVISION, LOCAL GOVERNMENT DEPARTMENT
• Enhance Public and Private Collaboration