Aim : To produce a butt joint using submerged arc welding and calculate heat input and metal deposition
to primarily join two metal plates
Equipment required:
Tools required:
Submerged arc welding
Procedure:
Precautions:
Calculations:
Result:
Submerged arc welding – calculations – Group 1
AC current = 650-675A
Voltage = 35 V
Time taken for welding = 49.6s
Material deposited = g
Speed of welding = cm/s
Average current = A
Heat Input = VI/S = J/mm
Metal deposition rate = Metal deposited/Time taken = g/s
Submerged arc welding – calculations – Group 2
AC current = 675-690A
Voltage = 35 V
Time taken for welding = 62.3s
Material deposited = g
Speed of welding = cm/s
Average current = A
Heat Input = VI/S = J/mm
Metal deposition rate = Metal deposited/Time taken = g/s
Submerged arc welding – calculations – Group 3
AC current = 675-698A
Voltage = 35 V
Time taken for welding = 58.5s
Material deposited = g
Speed of welding = cm/s
Average current = A
Heat Input = VI/S = J/mm
Metal deposition rate = Metal deposited/Time taken = g/s
Submerged arc welding – calculations – Group 4
AC current = 675-710A
Voltage = 35 V
Time taken for welding = 138s
Material deposited = g
Speed of welding = cm/s
Average current = A
Heat Input = VI/S = J/mm
Metal deposition rate = Metal deposited/Time taken = g/s
Submerged arc welding – calculations – Group 5
AC current = 685-725A
Voltage = 35 V
Time taken for welding = 52s
Material deposited = 43g
Speed of welding = cm/s
Average current = A
Heat Input = VI/S = J/mm
Metal deposition rate = Metal deposited/Time taken = g/s
Submerged arc welding – calculations – Group 6
AC current = 680-735A
Voltage = 35 V
Time taken for welding = 78s
Material deposited = 18g
Speed of welding = cm/s
Average current = A
Heat Input = VI/S = J/mm
Metal deposition rate = Metal deposited/Time taken = g/s