Professional Documents
Culture Documents
ON
----------------------------------
Tariff Advisory Committee 1
1-1-01
THE TARIFF ADVISORY COMMITTEE
(HEREINAFTER CALLED THE COMMITTEE) HAS
LAID DOWN RULES, REGULATIONS, RATES,
ADVANTAGES, TERMS AND CONDITIONS, AS
CONTAINED HEREIN, FOR TRANSACTION OF
CONTRACTOR’S ALL RISKS INSURANCE BUSINESS
IN INDIA IN ACCORDANCE WITH THE PROVISIONS
OF PART II B OF THE INSURANCE ACT, 1938.
---------------------------------- 2
Tariff Advisory Committee
1-1-01
PROPOSAL FORM
------------------------------------------------------------------------------------Co. Ltd.
(The liability of the Company does not commence until this proposal has been accepted by the Company
and the premium paid)
4. i) Is this a contract/Sub-contract
forming part of an over all construction Yes No.
project
b) If not, by whom? b)
---------------------------------- 4
Tariff Advisory Committee
1-1-01
d) Is there any record of the construction site ever d)
having been affected by any of the major perils
specified in (a) above?
a) declined? Yes No
b) withdrawn? Yes No
SUM INSURED -
---------------------------------- 5
Tariff Advisory Committee
1-1-01
Note-Please attach schedule of quantities and rates and/or values (Permanent & Temporary works
including all materials to be incorporated therein)
15. Do you wish to opt for higher amounts of Deductible Excess? Yes No
I/We the undersigned hereby declare that the above statements and particulars are true and complete and I/We
declare and agree that this declaration and the answers given above shall be held to be promissory and shall be the
basis of the contract between me/us and the company.
Place.................
Date.................. Proposer’s Signature.....................
---------------------------------- 6
Tariff Advisory Committee
1-1-01
Section 41 of Insurance Act 1938
PROHIBITION OF REBATES -
1. No person shall allow or offer to allow, either directly or indirectly as an inducement to any person
to take out or renew or continue an insurance in respect of any kind of risk relating to lives or
property in India, any rebate of the whole or part of the commission payable or any rebate of the
premium shown in the policy; nor shall any person taking out or renewing or continuing a policy
accept any rebate, except such rebate as may be allowed in accordance with the published
prospectus or tables of the Insurer.
2. Any person making default in complying with the provisions of this section shall be punishable with
fine, which may extend to five hundred rupees.
Issuing Office
Agency Policy No
THE SCHEDULE
The Insured –
---------------------------------- 7
Tariff Advisory Committee
1-1-01
a) Name & Address of the Principal
Period of Insurance
From . . . . . . . . . . . . to . . . . . . . . . . .. plus . . . . . . months maintenance period.
Rupees . . . . . . .
2. Any other works, & installations not included in 1.1 and 1.2 above
(eg camp, colony, stores etc as per list enclosed)
---------------------------------- 8
Tariff Advisory Committee
1-1-01
4. Extensions (on First loss Indemnity basis) –
3. for Major peril claims as per Memo 8 of Section I Rs. . . . . . each claim
SIGNED ON BEHALF OF THE COMPANY AT _____ THIS ______ DAY OF ______ 2001
EXAMINED
WHEREAS the insured named in the schedule hereto had made to __________________________ Co
Ltd. (hereinafter called "the Company") a written proposal by completing a proposal form which
---------------------------------- 9
Tariff Advisory Committee
1-1-01
together with any other statements made in writing by the Insured for the purpose of this policy, is
deemed to be incorporated hereto.
NOW THIS POLICY OF INSURANCE WITNESSETH that subject to and in consideration of the
Insured having paid to the Company, the premium mentioned in the schedule and subject to the terms,
exclusions, provisions and conditions contained herein or endorsed hereon the Company will indemnify
the Insured in the manner and to the extent hereinafter provided.
GENERAL EXCLUSIONS -
The Company will not indemnify the Insured in respect of loss, damage or liability directly or indirectly
caused by or arising out of or aggravated by -
a) War, Invasion, Act of foreign enemy, hostilities or War like operations (whether war be declared or
not) Civil War, rebellion, revolution, insurrection, mutiny, Civil commotion, Military or usurped
power, martial law, conspiracy, confiscation, commandeering a group of malicious persons or persons
acting on behalf of or in connection with any political organisation, requisition or destruction or
damage by order of any Government de jure or defacto or by any Public, Municipal or Local
Authority;
In any action, suit or other proceedings where the Company, allege that by reason of the provisions of
Exclusion (a) above any loss, destruction, damage or liability is not covered by this insurance, the burden
of proving that such loss, destruction, damage or liability is covered shall be upon the Insured.
PERIOD OF COVER -
Construction Period -
The liability of the Company shall commence, (notwithstanding any date to the contrary specified in the
Schedule) only from the time of commencement of work after the unloading of the property specified in
the schedule from any conveyance at the site specified in the schedule whichever is earlier and shall
expire on the date specified in the schedule. However, the Company’s liability expires also for parts of the
insured contract works taken over or put into service by the Principal prior to the expiry date specified in
the policy whichever shall be earlier.
‘If actual construction period is shorter than the period indicated in the schedule, no refund of premium
shall be allowed unless specifically allowed by Insurers.’
At the latest, the insurance shall expire on the date specified in the Schedule but if the work of
construction included in the insurance is not completed within the time specified hereunder, the Company
may extend the period of insurance but the Insured shall pay to the Company additional premium at rates
to be prescribed by the Company.
---------------------------------- 10
Tariff Advisory Committee
1-1-01
GENERAL CONDITIONS –
1. The due observance and fulfillment of the terms of this Policy in so far as they relate to anything
to be done or complied with by the Insured and the truth of the statement and answers in the
questionnaire and proposal made by the Insured shall be a condition precedent to any liability of
the company.
2. The Schedule and the Section(s) shall be deemed to be incorporated in and form part of this
Policy and expression ‘this Policy’ wherever used in this contract shall be read as including the
Schedule and the Section(s). Any word or expression to which a specific meaning has been
attached in any part of this Policy or of the Schedule or of the Section(s) shall bear such meaning
wherever it may appear.
---------------------------------- 11
Tariff Advisory Committee
1-1-01
3. The Insured shall at his own expense take all reasonable precautions and comply with all
reasonable recommendations of the Company to prevent loss, damage or liability and comply
with statutory requirements and manufacturers' recommendations.
4. a) Representatives of the Company shall at any reasonable time have the right to inspect and
examine the risk and the Insured shall provide the representatives of the Company with all
details and information necessary for the assessment of the risk.
(b) The Insured shall immediately notify the Company by Telegram and in writing
of any material change in the risk and cause at his own expense such
additional precautions to be taken as circumstances may require and the
scope of cover and/or premium shall, if necessary, be adjusted accordingly.
No material alteration shall be made or admitted by the Insured where by the risk is increased
unless the continuance of the Insurance be confirmed in writing by the Company.
5. In the event of any occurrence, which might give rise to a claim under this Policy, the Insured
shall –
b) take all steps within his power to minimise the extent of the loss or damage;
c) preserve the parts affected and make them available for inspection by a representative or
Surveyor deputed by the company;
d) furnish all such information and documentary evidence as the Company may require;
e) inform the police authorities in case of loss or damage due to theft or burglary.
The Company shall not in any case be liable for loss, damage or liability of which no notice has been
received by the Company within 14 days of its occurrence.
Upon notification being given to the Company under this condition the Insured may carry out the
repair or replacement of any minor damage not exceeding Rs. 2,500/-. In all other cases a
representative of the Company shall have the opportunity of inspecting the loss or damage before any
repairs or alterations are affected. If a representative of the Company does not carry out the inspection
within a period of time which could be considered as adequate under the circumstances the Insured is
entitled to proceed with the repairs or replacement.
The liability of the Company under this Policy in respect of any item sustaining damage shall cease if
said item is not repaired properly without delay.
6. The Insured shall at the expense of the Company do and concur in doing and permit to be done all
such acts and things as may be necessary or required by the Company in the interest of any rights or
remedies, or of obtaining relief or indemnity from parties (other than those Insured under this Policy)
---------------------------------- 12
Tariff Advisory Committee
1-1-01
to which the Company shall be or would become entitled or subrogated upon their paying for or
making good any loss or damage under this Policy, whether such acts and things shall be or become
necessary or required before or after the Insured's indemnification by the Company.
7. If any dispute or difference shall arise as to the quantum to be paid under this Policy (liability being
otherwise admitted) such difference shall independently of all other questions be referred to the
decision of a sole arbitrator, to be appointed in writing by the parties to or, if they cannot agree upon a
single arbitrator within 30 days of any party invoking Arbitration, the same shall be referred to a
panel of three Arbitrators comprising of two Arbitrators - one to be appointed by each of the parties to
the dispute/difference, and the third Arbitrator to be appointed by such two Arbitrators and arbitration
shall be conducted under and in accordance with the provisions of the Arbitration and Conciliation
Act 1996.
It is clearly agreed and understood that no difference or dispute shall be referable to arbitration as
hereinbefore provided, if the Company has disputed or not accepted liability under or in respect of
this Policy.
It is hereby expressly stipulated and declared that it shall be a condition precedent to any right of
action or suit upon this Policy that the award by such Arbitrator/Arbitrators of the amount of the loss
or damage shall be first obtained.
8. If a claim is in any respect fraudulent, or if any false declaration is made or used in support thereof, or
if any fraudulent means or devices are used by the Insured or any one acting on his behalf to obtain
any benefit under this Policy, or if a claim is made and rejected and no action or suit is commenced
within three months after such rejection or, in case of arbitration taking place as provided therein,
within three months after the Arbitrator or Arbitrators or Umpire have made their award, all benefits
under this Policy shall be forfeited.
9. If at the time any claim arises under this Policy there be any other insurance covering the same loss,
damage or liability the Company shall not be liable to pay or contribute more than their rateable
proportion of any claim for such loss, damage or liability.
10. This insurance may be terminated at the request of the Insured at any time in which case the Insurers
will refund appropriate premium amount subject to the following conditions -
i) Claims experience under the policy as on date of cancellation should be less than 60 % of
reworked premium.
ii) ‘The unexpired period is not less than 3 months or 25 % of the policy period whichever is less’.
This insurance may also at any time be terminated at the option of the Company by 15 days notice to
that effect being given to the Insured in which case the Companies shall be liable to repay on demand
a rateable proportion of the premium for the unexpired term from the date of cancellation.
The Company hereby agrees with the Insured (subject to the exclusions and conditions contained herein
or endorsed hereon) that if, at any time during the period of insurance stated in the said Schedule, or
---------------------------------- 13
Tariff Advisory Committee
1-1-01
during any further period of extension thereof the property (except packing materials of any kind) or any
part thereof described in the said Schedule be lost, damaged or destroyed by any cause, other than those
specifically excluded hereunder, in a manner necessitating replacement or repair the Company will pay
or make good all such loss or damage upto an amount not exceeding in respect of each of the items
specified in the Schedule the sum set opposite thereto and not exceeding in the whole the total sum
insured hereby.
The Company will also reimburse the Insured for the cost of clearance and removal of debris following
upon any event giving rise to an admissible claim under this Policy but not exceeding in all the sum (if
any) set opposite thereto in the Schedule.
EXCLUSIONS TO SECTION - I
a) the first amount of the loss arising out of each and every occurrence shown as Excess in the Schedule;
c) normal wear and tear, gradual deterioration due to atmospheric conditions or lack of use or
obsolescence or otherwise, rust, scratching of painted or polished surfaces or breakage of glass;
f) the cost necessary for rectification or correction of any error during construction unless resulting in
physical loss or damage;
g) loss of or damage to files, drawings, accounts, bills, currency, stamps, deeds, evidence of debt,
notes, securities, cheques, packing materials such as cases, boxes, crates;
h) any damage or penalties on account of the Insured's non-fulfillment of the terms of delivery or
completion under his Contract of construction or of any obligations assumed there under or lack of
performance including consequential loss of any kind or description or for any aesthetic defects or
operational deficiencies;
i) loss of or damage to vehicles licensed for general road use or water borne vessels or
Machinery/Equipment mounted or operated or fixed on floating vessels/craft/barges or aircraft.
---------------------------------- 14
Tariff Advisory Committee
1-1-01
PROVISIONS APPLYING TO SECTION - I
It is a requirement of this Insurance that the sum of insurance stated in the schedule shall not be less than
the completely erected value of the property inclusive of freights, custom duty, erection cost and the
insured undertakes to increase or decrease the amount of insurance in the event of any material
fluctuation in the level of wages or prices. Provided always that such increase or decrease shall take effect
only after the same has been recorded on the policy by the Company.
If in the event of the occurrence of a loss, or damage it is found that the Sum insured representing the
completely erected value of the property and/or of particular item involved is less than the amount
required to be insured, then the amount recoverable by the insured under this policy shall be reduced in
such proportion as the Sum Insured bears to amount required to be insured.
The Sum Insured under the Policy representing the complete value of the contract works shall be
adjustable at completion of the construction on the basis of actual values to be declared by the insured in
respect of freight and handling charges, customs dues and construction cost and difference in premium
shall be met with by payment at the rate agreed to or by the insured as the case may be. Any increase or
decrease in the Prime cost of materials shall not be the subject matter of premium adjustment.
In the event of loss or damage the Insurance shall notwithstanding be maintained in force during the
period of insurance for the Sum Insured the Insured undertaking to pay a pro-rata additional premium on
the full amount of each claim for the loss or damage from the date of such loss to the expiry of the period
of Insurance.
In the event of any loss or damage the basis of any settlement under this Policy shall be -
a) in the case of damage which can be repaired the cost of repairs necessary to restore the property to
their condition immediately before the occurrence of the damage less salvage, or
b) in the case of a total loss - the actual value of the property immediately before the occurrence of
the loss less salvage;
however, only to the extent the cost claimed has to be borne by the Insured and to the extent they
are included in the Sum Insured and provided always that the provisions and conditions have been
complied with.
All damages, which can be repaired, shall be repaired, but if the cost of repairing any damage equals
or exceeds the value of the property immediately before the occurrence of the damage, the settlement
shall be made on the basis provided for in (b) above.
The cost of any provisional repairs will be borne by the Company if such repairs constitute part of the
final repairs and do not increase the total repair expenses.
---------------------------------- 15
Tariff Advisory Committee
1-1-01
The cost of any alterations, additions and/or improvements shall not be recoverable under this Policy.
Any extra charges incurred for overtime, work on holidays, express freight (excluding air freight) are not
covered by this insurance unless agreed upon at an additional premium to be prescribed by the Company.
Loss of or damage to Construction Plant and Machinery excludes loss or damage directly caused by its
own explosion or its own mechanical or electrical breakdown or derangement.
Loss of or damage to property located on or adjacent to the site and belonging to or held in care custody
or control of the Principal (s) or the Contractor(s) shall only be covered if occurring directly due to the
construction of the items insured under Section I and happening during the period of cover, and provided
that a separate Sum therefore has been entered in the Schedule under Section I, for Principal’s
surrounding specified property. This cover does not apply to construction/erection machinery, plants and
equipment.
The major peril/Acts of God claims shall mean claims arising out of –
Reinstatement of the indemnity limit on payment of additional premium after occurrence of claim can be
allowed for extensions like express freight, overtime, surrounding property, airfreight. However, in
respect of Third Party Liability, reinstatement can be allowed upto overall limit of Rs.1 crore during
entire Policy period.
Third party liability (TPL) cover cannot be granted during extended maintenance.
---------------------------------- 16
Tariff Advisory Committee
1-1-01
a) legal liability for accidental loss or damage caused to property of other persons including property
held in trust by or under custody of the Insured for which he is responsible excluding any such
property used in connection with construction thereon.
b) legal liability (liability under contract excepted) for fatal or non-fatal injury to any persons other than
the Insured's own employees or workmen or employees of the owner of the works or premises or
other firms connected with any other construction work thereon, or members of the Insured's family
or of any of the aforesaid; directly consequent upon or solely due to the construction of any property
described in the Schedule.
Provided that the total liability of the Company during the period of Insurance under this cause shall
not exceed the limits of Indemnity set opposite thereto in the Schedule.
In respect of a claim for compensation to which the indemnity provided herein applies, the Company
will, in addition, indemnify the Insured against -
a) all costs and expenses of litigation recovered by any claimant from the Insured,
b) all costs and expenses incurred with the written consent of the Company.
The exclusion contained in paragraphs (d), (f) & (g) in Section I of this Policy shall apply also to this
Section.
EXCLUSIONS TO SECTION II -
1. The Excess stated in the Schedule to be borne by the Insured in any one occurrence related to
property damage.
2. Expenditure incurred in doing or redoing or making good or repairing or replacing anything covered
or coverable under Section I of this Policy;
c) any accident caused by vehicles licensed for general road use or by waterborne vessels or
aircraft;
---------------------------------- 17
Tariff Advisory Committee
1-1-01
d) any agreement by the Insured to pay any sum by way of indemnity or otherwise unless such
liability would have attached also in the absence of such agreement.
1. No admission, offer, promise, payment or indemnity shall be made or given by or on behalf of the
Insured without the written consent of the Company who shall be entitled, if they so desire, to take
over and conduct in the name of the Insured the defence or settlement of any claim or to prosecute for
their own benefit in the name of the Insured any claim for indemnity or damage or otherwise and
shall have full discretion in the conduct of any proceeding or in the settlement of any claim and the
Insured shall give all such information and assistance as the Company may require.
2. The company may, so far as any accident is concerned, pay to the Insured the limit of indemnity for
anyone accident/ anyone period, but deducting therefrom in such case any sum/s already paid as
compensation in respect thereof or any lesser sum for which the claim or claims arising from such
accident can be settled and the company shall thereafter be under no further liability in respect of
such accident under this section.
PART 1- RATE SCHEDULE FOR CONTRACTORS' ALL RISKS INSURANCE
HAVING SUM INSURED UPTO RS.100 CRORES
---------------------------------- 18
Tariff Advisory Committee
1-1-01
017106 g) RCC Framed structure
above 25 storeys and upto 3.25 0.05 50,000/- 2,00,000/-
30 storeys
4. Chimneys, Silos and Cooling Towers (other than hyperbolic or natural draught type) TV Towers -
2. Where the tunnel value exceeds 10% of the contract value, a reference should be made to Tariff Advisory
Committee (Engg. sub-committee) for rate of premium to be charged in addition to the above rates.
11. Bridges on rivers/creeks, dams/coffer dams, aqua ducts, via-ducts, barrages, structure works in water –
---------------------------------- 20
Tariff Advisory Committee
1-1-01
(II) Reservoirs/Tanks of steel –
13. Tunnels –
140002 b) Under Sea or River Reference to be made to TAC for final rate quotation.
Note - Laying of Water Pipelines Water Supply Scheme - to be rated as per EAR tariff (Cir. No. EAR/45/97-16 dated 11-
6-97)
---------------------------------- 21
Tariff Advisory Committee
1-1-01
201011 20 Other sundry works for
residential/ commercial 1.00 0.02 3,000 10,000
buildings like water proofing
plastering of walls
211137 21 All other risks not covered 5.00* 0.10* 20,000* 80,000*
above
Note - Refer Item -5 (Roads) for canals / culverts forming part of the Road construction
270000 27 Acquaculture Project: Laying of HDPE Pipes/Accessories for Sea Water Intake Systems for
Acquaculture Project - to be rated as “Works in Water”
Note - Circular No Engg/Gen-24/2000-2 dtd 29-3-2000 - By this decision, it is allowed to cover the ‘Exclusion-C-Section-
1’ which excludes losses arising out of ‘breakage of glass’ among other things as indicated in the exclusion-c) by
payment of additional premium.
ii) Excess on glass items shall be 10% of aggregate Sum Insured of all glass items.
It has been decided to revise the wordings of the notes under the tariff entry “Roads – Sl. No. 5”. The existing entry “Road – Sl. No.5” shall stand modified to read as below in view of the above
change :
5. Roads –
Excess – 5% of claim
Risk Sl.
Risk Premium Rates (%o) amount subject to
Code No.
minimum of Rs.
Insurers are requested to inform their operating offices accordingly.
Asst. Gen. Manager & In-charge
Engg/Gen-4/24/2002-23 . 30th December, 2002
Re: Discount for higher excess under CAR/EAR Insurance of Projects
with S.I. less than Rs.100 crs.
Tariff Advisory Committee has revised the scheme for ‘Higher Excess Discount’ under
CAR/EAR Insurances as under.
---------------------------------- 23
Tariff Advisory Committee
1-1-01
The above scale shall also apply for opting ‘higher excess’ for Earthquake cover.
Gen.Reg. 12-A: Higher Excess Discount Scheme for Projects with S.I. less than Rs.100 cr.
2 times 5% 40 times 40 %
5" 10 % 50 " 45 %
30 " 35 %
NB: The scale of discounts shall apply for all additional covers when"higher excess" is opted.
Insurers are requested to make a note of the change and advise the operating offices
accordingly.
Secretary
---------------------------------- 24
Tariff Advisory Committee
1-1-01
PART-II GENERAL REGULATIONS
1. JURISDICTION –
This applies to all Risks located in India, for which the value of the Civil Works involved is more
than 50 % of the total contract value.
2. SCOPE -
3. SUM INSURED -
For the purpose of these regulations the Sums Insured on the following items are to be taken into
account for arriving at total Sum Insured for CAR Insurance –
a) Marine (Imports)- Landed cost at site
b) Marine (Indigenous)- Landed cost at site
c) Cost of Construction
d) Permanent Civil Engineering Works
e) Half the escalated value, if escalation is opted for.
f) Preoperative expenses
4. MARINE/TRANSIT RISKS -
Where Marine/Transit Insurance connected with Contractor’s All Risks Insurance of any project is
placed in India simultaneously or later on in one combined policy or under separate policies, in one
department or in different departments, the matter relating to Contractors All Risks Cover is
required to be underwritten, subject to these General Regulations.
As regards Sub-Contracts forming part of a project, it is clarified that irrespective of whether the
project value has been broken into various sections and orders/contracts are placed with
different suppliers/contractors/Sub-Contractors OR the Insureds carry out the work themselves
departmentally, the Insurances for all such Sub-Contracts are subject of these General Regulations.
6. COMPUTATION OF PREMIUM
i) Commencement of work OR
ii) Date of arrival of the first consignment at the site of erection
---------------------------------- 25
Tariff Advisory Committee
1-1-01
whichever is earlier.
a) These additional rates take care of Earthquake (Fire and Shock) perils only.
b) These additional rates are to be charged on pro-rata basis for period shorter than one year.
c) All Acts of God perils other than Earthquake (Fire and shock) are taken care of in the CAR
Rates prescribed. However no reduction in the rates can be allowed for excluding any of these
perils.
d) The Additional rates mentioned above (namely Rs.1.00 % per annum for risks located in
Earthquake Zone I and 0.50 % per annum for risks located in Earthquake Zone II) are to be
charged for the total CAR period (Including all extensions).
e) Earthquake cover is optional in both the Zones I & II but this cannot be opted mid-term or for
part of the total CAR period. Thus these extras (viz Rs.1.00 per mille per annum for Risks in
Zone I and Rs. 0.50 per mille per annum for risks in Zone II) are to be charged for total CAR
period (including all extensions).
9. MID-TERM INCREASE IN SUM INSURED DURING POLICY PERIOD -
In cases where the Sum Insured for CAR is required to be increased during the policy period, the
premium should be collected on the additional Sum insured at applicable CAR rates. It is not
permissible to charge pro-rata premium on such increased sum insured.
Mid-term increase in SI shall be affected only after the same has been recorded in the policy by the
Company before the occurrence of any claim.
In such cases no Volume Discount shall be applicable.
10. EXCESS FOR CLAIMS ARISING OUT OF ‘ACTS OF GOD PERILS’ –
a) Column No. 7 of the Part- I - Rate Schedule prescribes minimum excess amount for Collapse
Claims and Claims arising out of AOG Perils (viz. Earthquake/Fire and
Shock/Landslide/Rock-slide/Subsidence, Flood/ Inundation/ Storm/ Tempest/ Hurricane/
Typhoon /cyclone).
---------------------------------- 26
Tariff Advisory Committee
1-1-01
For risks situated in Earthquake Zone I and II the minimum excess for claims arising out of AOG
perils shall be as under during the entire policy period (including all extensions) –
B) For risks situated in Earthquake Zone III and IV the minimum excess for claims arising out of
AOG perils shall be the excess prescribed in Column No. 7 of Rate Schedule.
The excess amounts shall apply separately to each incident giving rise to loss or damage and for
this purpose a incident shall not be considered to have terminated until there have been seven
consecutive days freedom from the perils concerned and only thereafter will this excess amount
apply afresh.
C) In respect of those CAR Risks located in Earthquake Zone I or II where clients do not require
the cover for Earthquake Perils, the excess amount applicable for all AOG perils other than
Earthquake (Fire and Shock) will be the same as prescribed in Column No. 7 of the Rate
Schedule.
D) In respect of those CAR Risks where the excess prescribed in Column No. 7 of the Rate
Schedule is higher than excess amounts prescribed above for Zone I and II (viz. Rs. 25,000/-
per claim for Zone I and Rs. 10,000/- per claim for Zone II) the higher of the two excesses should
be applied in respect of AOG Claims.
11. DISCOUNT FOR HIGHER EXCESS & VOLUME DISCOUNT -
A) All rates for Contractor’s All Risks Insurance are subject to minimum Excess per claim and
separately for (a) Normal (b) AOG/Collapse Claims as prescribed.
Discounts for opting Higher Excesses (both for Normal and AOG/Collapse Claims at the same
time) can be allowed in the CAR rate (as per Rate Schedule) as per the following Scale –
B) Earthquake rates and premiums for risks located in Earthquake Zones I and II are distinct from
the Rates and Premiums applicable to 'All Risks’ portions of the CAR Cover, it is permissible to
grant discount as per following scale in the Earthquake premium alone.
---------------------------------- 27
Tariff Advisory Committee
1-1-01
Notes – 1. These discounts in the Earthquake premium only, can be allowed irrespective of
whether the increased Excesses for Normal/Collapse Claims are opted or not for
the CAR Cover.
2. The higher Earthquake Excess will qualify for discounts in the Earthquake premium
only and not in the CAR premium, for which the provisions under Item No. (A)
above would continue to apply.
C) The discounts applicable in the CAR Rate and/or the Earthquake premium as explained in (A)
and (B) above for selection of higher Excess amounts are also applicable, as under, during any
Extensions in the policy period -
The rate applicable for Contractor's All Risks cover is to be charged on the limit of Sum Insured fixed
for ‘Clearance and Removal of Debris'.
The Policy Excesses (Normal & AOG/Collapse) should apply for the 'Clearance and Removal of
Debris' claims.
---------------------------------- 28
Tariff Advisory Committee
1-1-01
iv) The Sum Insured for TPL Cover cannot be reinstated after occurrence of a loss. The Tariff
extension rate shall apply for TPL cover also during extension period. When different
sections of the contract works are covered for different extension periods under the policy,
the highest of such Tariff extension rates shall be charged for TPL cover during extension.
v) The TP Liability cover cannot be granted during extended maintenance
14. SURROUNDING PROPERTY OF THE INSURED -
For covering the specified Surrounding Property of the Insured the rate applicable will be 50 % of the
CAR rate and this is to be charged on the limit of Sum Insured fixed for the Surrounding Property.
The Policy Excesses (Normal & AOG/Collapse Claims) should apply for Surrounding Property also.
15. ESCALATION PROVISION -
Escalation Benefit will be limited to a maximum of 50% of the sum insured for CAR (the escalation
limit may be expressed either in percentage or in amount) and will be permitted only once at the time
of inception of the CAR Policy.
Additional Premium is to be charged for `Escalation Provision' at the rates prescribed for CAR but on
the 50% of the amount of escalation. The method of premium calculation will be as under –
a) Assume the Project Sum Insured ... Rs. 4 Crores
b) Assume Escalation percentage is 10 % i.e. Rs. 40 Lakhs
c) Additional Premium to be charged at the
prescribed rate for CAR cover will be on 50
% of the Escalation Pro- visional cover i.e.
on. ... Rs.20 Lakhs
16. ADDITIONAL RATE FOR EXPRESS FREIGHT (AIR FREIGHT EXCLUDED) HOLIDAY
AND OVERTIME RATES OF THE WAGES -
The additional premium for covering Express Freight (Air Freight excluded), Holiday and Overtime
Rate of Wages, will be at the basic CAR Rate (excluding extras for Earthquake, etc.) to be applied on
the limit selected.
17. ADDITIONAL RATE FOR AIR FREIGHT ONLY – ( refer Endt. For Air Freight )
The Rate and excess as under shall be charged exclusively for items of Air Freight only and subject to
the limit selected by the Insured for Indemnity against Air Freight only –
The Endorsement Wording for covering the Air Freight will be as under --
‘It is hereby declared and agreed that the Policy shall also indemnify towards Air Freight incurred by
the Insured in connection with the idemnifiable loss under the Policy.
In consideration thereof an additional premium of Rs._______ is charged hereby. Limit of
indemnity shall be Rs.______ during currency of the Policy.
---------------------------------- 29
Tariff Advisory Committee
1-1-01
Each and every claim shall be subject to a minimum Excess of 5 % of the Air Freight incurred over
and above the excess as applicable under the policy. Subject otherwise to terms, conditions and
exceptions of the policy’.
a) ADDITIONAL CUSTOM DUTY -
The cover for Additional Custom Duty will be subject to the following rates, terms and conditions -
a) the cover for Additional Custom Duty will be on First Loss Basis,
b) The specific limit for Additional Custom Duty-either in percentage or in amount - has to be
selected by the Insured at the inception of the Policy and can be reinstated in the event of loss,
c) The rate and excess will be as under -
Excess 5 % of the admissible Custom Duty incurred, in addition to the Excess amount
applicable for the affected item under the policy.
d) Following endorsement wording to be used for the purpose -
‘In consideration of the Insured having paid an additional premium of Rs._______, It is
hereby declared and agreed that the insured shall also be indemnified during the currency
of this policy, towards the additional Custom Duty amount of Rs.______ which may be
incurred by the Insured over and above the Custom Duty amount taken into account in
arriving at the Sum Insured of the affected item.
Each and every claim payable under this extension shall be subject to an Excess of 5 %of the
admissible Additional Custom Duty incurred and will be in addition to the excess amount
applicable for the affected item under the policy.
The Indemnity for such Additional Custom Duty will stand reduced after occurrence of the
claim unless reinstated by payment of an additional premium prescribed by the Company.
Subject otherwise to the terms, conditions and exceptions of the policy’.
18. CONSTRUCTION MACHINERY PLANTS AND EQUIPMENTS -
A separate Sum Insured is fixed for CPM equipments used for such projects.
i) Sum Insured of CPM does not exceed 5 % of CAR Sum Insured -
Where the Sum Insured for CPM equipments does not exceed 5 % of SI for CAR Insurance, or
Rs. 25 lakhs whichever is lower, the same can be covered under the CAR policy and at rates and
excesses applicable for CAR.
ii) Sum Insured of CPM exceeds 5 % of CAR Sum Insured -
Where the Sum Insured for CPM equipments exceeds 5% of SI for CAR Insurance, or Rs. 25
lakhs whichever is lower, the same should be separately covered under the Contractor’s Plant and
Machinery Insurance Policy and at rates and excesses as applicable for CPM Insurance.
19. RATES FOR EXTENSION BEYOND POLICY PERIOD -
For risks located in Earthquake Zones Pro-rata extra of the additional rates for Earthquake
(Prescribed under Item No.7 of General Regulations will also apply for Extension Periods beyond
policy period, in addition to the Normal Extension Rates for CAR Cover prescribed above.
20. CLAIMS DISCOUNTS LOADING ON CAR EXTENSION RATES -
For all proposals having Sum Insured above Rs 100 Crores, loading/discount shall apply on extension
rates under CAR Tariff depending on the claims experience under the policy at the time of extension.
Upto 10 % 20 %
more than 10 % upto 30 % 15 %
more than 30 % upto 60 % 10 %
more than 60 % upto 100 % Nil
more than 100 % upto 200 % + 10 %
more than 200 % upto 300 % + 20 %
more than 300 % + 30 %
Notes -
i) The above discount/loading for extensions to such policies will be applicable only to the project
risks with SI above Rs.100 Crores.
Extensions to project risks with SI below Rs.100 crores will not be eligible for any
discount/loading
ii) Maximum discount allowable on CAR rate is 60 % ie. The final rate after all discounts are
applied should not be less than 40 % of the basic CAR rate
21. MAINTENANCE VISITS AND EXTENDED MAINTENANCE COVER -
---------------------------------- 31
Tariff Advisory Committee
1-1-01
The policy can be extended to cover the Maintenance Visits and Extended Maintenance. The
endorsement wordings and rates and excess for those will be as under -
In consideration of the payment of additional premium by the insured (which is included in the
total premium set forth in the schedule) it is hereby declared and agreed that the indemnity
provided by this policy is extended to include Maintenance Cover for the period of _______
months to be reckoned from the date of completion or handing over provided the policy period
has been extended till completion or handing over. However, during Maintenance Period this
Insurance shall cover solely loss of or damage to the contract works caused by the insured
contractor(s) in the course of the operations carried out for the purpose of complying with the
obligations under the maintenance provisions of the contract.
ii) Extended Maintenance Cover --
In consideration of the payment of an additional premium by the insured (which is included in the
Total Premium set forth in the Schedule), it is hereby declared and agreed that the indemnity
provided by the policy is extended to include Maintenance Cover for the period of
____________ months to be reckoned from the date of completion or handing over, provided the
policy period has been extended till completion or handing over. However, during the
Maintenance Period this insurance shall cover loss or damage to the contract works -
a) caused by the Insured contractor(s) in the course of the operations carried out for the purpose
of complying with the obligations under the maintenance provisions of the contract.
b) occurring during the maintenance period provided such loss or damage was caused on the
site during the erection period.
The rates and Excesses applicable for Maintenance Cover for 6 &12 months will be as under
–
Note - Charging premium on pro-rata basis for periods less than 6 months, or 6 to12 months
shall not be allowed.
iii) ‘Extended Maintenance Cover’ (beyond 12 months) -
Extended Maintenance Cover could be given for any period longer than 12 months, as required
under the contract at the rates prescribed under the Tariff at present. i.e. Re.1.00 per mille per
annum. (Circular no. Engg/73-1/99/14, dated Sept. 28, 1999). This provision is effective from
1/10/99.
iv) Extension of CAR Policy for Maintenance Visits and Extended Maintenance Cover
---------------------------------- 32
Tariff Advisory Committee
1-1-01
In case deletion of Maintenance Visits/Extended Maintenance Cover availed at the inception of
CAR policies before attachment of the risk, refund of premium may be given by retaining 25 %
of the premium under this extension. In case the risk is attached no refund shall be allowed for
deletion of Maintenance Visits/ Extended Maintenance Cover.
22. REFUND OF PREMIUM FOR EARLY COMPLETION OF THE PROJECT -
Refund of premium, arising out of cancellation of policies under CAR insurance due to abandonment
of project, double insurance of same project etc. or refund of premium due to early completion earlier
than the period mentioned in policy Schedule (including testing in respect of CAR policies) whether
rated by the Insurer or TAC can be allowed provided the following conditions are fulfilled (Circular
no. Engg/Gen-4-III/Gen-24-VII/99-4, dated Feb. 24, 1999)–
The minimum period for which refund can be claimed shall be 3 months.
Any proposal on Contractor's All Risks Insurance with sum insured upto Rs.1,500 crores shall be
rated as per Tariff. Reference will be made only in case of doubt.
Provisional Quotations (if any) to the clients for CAR Insurances having sum insured upto Rs. 1,500
Crores to be made on the following basis of these General Regulations and a reference to be made to
TAC (Engineering Sub-Committee) for final fixing of rates and terms.
Any Provisional Rate Quotations for CAR Insurances having Sum Insured upto Rs.1500 crores, not
consistent with the above, will be treated as breach of Tariff and dealt with accordingly.
Any Rate Quotations for CAR Insurances not consistent with this Tariff will be treated as Breach of
Tariff and dealt with accordingly.
All Rates specified in the Tariff are Gross Rates and Agency Commission (or discount in lieu of
Agency Commission) can be allowed from these Gross Rates, as per Rules Prescribed by General
Insurance Corporation of India from time to time.
---------------------------------- 33
Tariff Advisory Committee
1-1-01
Engg/Gen-4/24/164/2001/15 4th May,2001
Re: Rating of Large Projects - Design Defect Cover
Reference is drawn to "Guidelines" issued by Tariff Advisory Committee relating to "Rating of
Large Projects" with Sum Insured above Rs.100 crs. and below Rs.1500 crs. as brought out in
the TAC Circular Engg/164/99-6 dtd.26th Feb.99 and the clarification vide Cir.No.
Engg/Gen/4/24/164/2001/7 dtd.1-1-2001.
Representations have been received in general on providing `design defect’ cover, which is a
standard exclusion under CAR policy. It was decided to issue the ‘design defect’ cover as under
for both EAR and CAR proposals.
Design Defect
Additional Rate Excess Remarks
Cover as Per
To be restricted only
DE-4 of Munich Re 15% of basic rate -do-
to EAR proposals.
It was also decided that the relevant provision for "Design Defect Cover" as per Munich Re DE
4" as appearing under the above referred circular Engg/Gen-4/24/164/2001/7 dtd.1-1-01 on
"Rating of Large Project is restricted to "Erection All Risks" only.
The above decision is effective from 4th May, 2001.
Secretary
---------------------------------- 34
Tariff Advisory Committee
1-1-01
ANNEXURE
ENDORSEMENTS -
Following endorsements shall be attached to the policies whenever applicable -
1. PIPELINE CONSTRUCTION -
Notwithstanding the conditions and provisions and endorsements of the policy, it is understood and
agreed that the following special conditions shall apply -
a) Excavated material shall be deposited at least one meter away from the trench.
b) The length of trenches totally or partially opened at any one time shall never exceed in respect of
any one work face __ meters all work faces’ combined total ____ meters.
c) Pipe shall be secured against heaving or floating up by covering them sufficiently and as soon as
practicable.
d) The open ends of pipes shall be provisionally sealed at the end of each working day or in the
event of immediate danger of flooding, otherwise expenses for clearing and cleaning of
mud-filled pipeline sections shall not be indemnified.
e) Loss or damage arising from pressure testing producing tensions exceeding the yield point
guaranteed by the manufacturer shall not be covered.
f) Loss of testing media shall not be covered.
g) Cost incurred in searching for leaks are indemnified -
- up to but not exceeding the limit per event of ________________
- up to an aggregate limit for the policy period of ________________
however only if the leaks are a consequence of an insured event.
h) The Insurer is not liable for any claims due to pollution from any cause whatsoever.
2. EXCLUSION OF LOSS OF STABILISING FLUID -
Notwithstanding the conditions, provisions and other endorsements of the policy, it is agreed and
understood that the Insurers shall not be liable to indemnify the Insured in respect of loss of bentonite
or other stabilising fluid even if the quantity of losses originally expected is exceeded.
3. ROAD CONSTRUCTION --
It is hereby warranted and agreed that, notwithstanding anything contained in this policy to the
contrary, the following special conditions shall apply -
---------------------------------- 35
Tariff Advisory Committee
1-1-01
The length of the working area (excavation and construction of coffer etc., however except final
surfacing) shall never exceed _____ meters at any work face and a total of _______ meters at all
work faces combined.
4. PILING CONSTRUCTION -
Notwithstanding the conditions, provisions and other endorsements of the Policy, it is agreed and
understood that the Insurers shall not be liable to indemnify the Insured in respect of -
a) Loss of or damage to piles and/or casings due to misplacement, jamming and/or extraction
thereof.
b) Costs incurred in case of abandoned piling work, for any reasons not related to accidental loss or
damage and mainly due to unforeseen ground conditions when piles cannot be driven to the
required depth.
5. ABANDONMENT OF SHAFTS -
It is hereby agreed and declared that, notwithstanding anything contained in the contrary, this
endorsement excludes any loss or damage resulting as a consequence of shaft being abandoned due to
any reason whatsoever.
6. CROPS, FORESTS, CULTIVATED AREAS -
Notwithstanding the conditions, provisions and other endorsements of the Policy, it is agreed and
understood that the Insurers shall not be liable to indemnify the Insured in respect of any loss, damage
or liability directly or indirectly caused to crops, forests and/or other cultures during the execution of
the contract works.
7. EXISTING UNDERGROUND CABLES -
Notwithstanding the conditions, provisions and other endorsements of the Policy, it is understood and
agreed that the following special conditions shall apply -
The Insurers shall not be liable under the Policy to indemnify loss or damage to existing underground
cables or pipes of any kind (electric cables, telephone cables, water and gas pipes, sewers and other
pipelines, etc.) unless prior to the commencement of works -
- the Insured had requested and obtained from the public authorities or the owners of such an
underground system the exact position of all cables or pipes.
---------------------------------- 36
Tariff Advisory Committee
1-1-01
a) The contract works time schedule together with plans, documents and specifications supplied and
any other statements made by the Insured with respect of works programme is deemed to be
incorporated herein.
b) The Insurers shall not indemnify the Insured in respect of loss or damage caused by, or arising
out of, or aggravated by deviations from the contract works time schedule exceeding four weeks,
unless the Insurers had agreed in writing to such a deviation before a loss occurred.
This memo applies only to the dam works during period of river diversion.
Irrespective of the periods of Insurance specified in the Policy, the Insurer will indemnify the Insured
only for unforeseen accidental loss or damage to temporary access roads insured under the Policy if
such loss or damage occurs prior to such roads being completed or taken into use for their purpose by
the contractors, whichever takes place first.
It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions
contained in Policy or endorsed thereon the Insurers will not indemnify the Insured in respect of -
grouting of soft rock areas and/or other additional safety measure even if their
necessity arises only during construction,
expenses incurred for dewatering even if the quantities of water originally
expected are exceeded substantially,
loss or damage due to breakdown of the dewatering system if such breakdown
could have been avoided by sufficient stand-by facilities,
expenses incurred for additional sealing or water proofing and additional facilities for the
discharge of run off and or underground water,
expenses incurred for the repairs of eroded slopes or other graded areas, if the Insured
has failed to take the measures required or to take them in time,
loss or damage due to subsidence if caused by insufficient compacting, cracks and leakage
not caused by Insured peril.
It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions
contained in the policy or endorsed thereon, the Insurers shall indemnify the Insured for loss, damage
or liability caused directly or indirectly by precipitation only if adequate precautions have been taken
in designing and executing the project involved.
In this context, adequate precautions shall mean that allowance is made for precipitation, flood and
inundation up to a return period of 10 years for the location insured and the entire policy period on
the basis of statistics prepared by the Meteorological agencies.
Loss, damage or liability resulting from the Insured’s not immediately removing obstruction (e.g.
sand, trees) from watercourses, whether carrying water or not, in order to maintain free water flow
shall not be idemnifiable.
---------------------------------- 37
Tariff Advisory Committee
1-1-01
12. SPECIAL CONDITIONS CONCERNING REMOVAL OF DEBRIS FROM LANDSLIDES -
It is further understood and agreed that in case of additional premium chargeable during final
adjustment, additional escalation premium will be charged to the insured but in case of any premium
refundable during final adjustment no refund shall be allowed against the escalation premium already
charged to the insured’.
ANNEXURE-I
All proposals in respect of projects valued above Rs.100 Crs. and upto Rs.1500 Crores will be rated as per
the norms contained below.
---------------------------------- 38
Tariff Advisory Committee
1-1-01
‘Sum Insured’ should be the aggregate of the following items only as is existing in the Committee’s
EAR/SCE/CAR Tariff.
3. Apply Voluntary Excess Discount on the net rate arrived as in (2) above, as per the
following scale:
N.B: Net discounted EAR/SCE/CAR rate shall not be less than 30% of basic
rate so arrived as in (1) above.
4. Adjust the net rate as arrived in (3) above, by addition/subtraction of the following additional
extras/reductions corresponding to various additional covers listed in the Annexure - 2 to arrive at the
overall net rate.
5. For any additional cover, not listed in the Annexure-2, reference may be made to Committee.
7. Projects valued in excess of Rs.1500 Crs. can be rated on the basis of Re-
---------------------------------- 39
Tariff Advisory Committee
1-1-01
insurance quotes. In other words, projects valued in excess of Rs.1500 Crs. go
out of Tariff.
******
ANNEXURE II
iii)Above 25 Cr…separate
cover to be issued -- --
---------------------------------- 43
Tariff Advisory Committee
1-1-01
21 Engg/Gen- 04/05/01 ---- Rating of Large Projects - ‘Wordings for Endorsements.
4/24/164/
2001/21
22 Engg/Gen-10/ 13/06/01 Insurance of “Photo Copier Machines” under MB
2001/22 Insurance
23 Engg/Gen-17/2001/23 13/06/01 13/06/01 Rates applicable to “stringing equipment” consisting of
hydraulic puller and hydraulic tensioner machines under
CPM policy.
24 Engg/Gen-
10&17/2001/24
13/06/01
MB Insurance for Asphalt Mixing & Recycling Plants
25 Engg/Gen- 13/06/01 01/01/01 Erection All Risks Insurances of “Combined Cycle Power
4/30/2001/25
Plants” - Rating of Gas Turbines while in Open Cycle
Mode and awaiting integrated testing with Steam Turbines
26 Engg/Gen-16/2001/26 13/06/01 13/06/01 Electronic Equipment Insurance :
A) Excess for Personal Computers
B) Insurance of VSAT Eqpt.
C) Insurance of Medical Eqpt.- Additional “Endorsement”
27 Engg/Gen-10/2001/27 13/06/01 13/06/01 Rating of ‘Passenger lift’ under MB tariff
28 Engg/Gen-16/2001/28 3/08/01 Additional covers under EEI/CPM/BPP policies
29 Engg/Gen-16/2001/29 3/08/01 3/08/01 Additional Customs Duty Cover as an extension to Erection All
Risk/Contractor’s All Risk Policies
30 Engg/Gen-4/Gen- 3/08/01 3/08/01 Rating of Large Projects - (1) Cover for ‘Valuable Documents’(2)
164/30 Clarification on ‘Workstoppage’ Cover
31 Engg/Gen-17/2001/31 3/08/01 3/08/01 Contractor’s Plant and Machinery Insurance Rating of Thermoplastic Line
Marking Machine -
32 Engg/Gen-16/2001/32 3/08/01 3/08/01 Insurance of System Software - EEI Policy
33 Engg/Gen-10/2001/33 3/08/01 3/08/01 "Third Party Liability" extension under Annual Engg.Insurances
34 Engg/Gen-16/2001/34 3/08/01 3/08/01 Excess under EEI Policy for "WINCHESTER DRIVES"
35 Engg/Gen- 3/08/01 3/08/01 Endorsement for expenses for foreign personnel under all Engineering
10/4/24/2001/35 Policies
36 Engg/Gen-4/2001/36 3/08/01 3/08/01 Additional Covers under Erection All Risks Policiess for projects with Sum
Insured less than Rs.100 cr.
37 Engg/Gen- 3/08/01 3/08/01 Seasonal discount under Machinery Insurance Policy
10/12/2001/37
ENGG/Gen-4/55/2001/1 1st January,2001
Re: Rating of "Wind" Turbine Generator Sets under EAR/SCE Policy.
Reference is drawn to the tariff item "Wind Turbine Generators" under Part-I:Rating Schedule
for Erection All Risks Insurance for rating of Wind Mill Turbine Sets having individual capacity
not exceeding 250KW.
The Tariff Advisory Committee has decided to introduce rates for higher capacity Wind Turbine
Sets as under.
PART I : RATE SCHEDULE FOR ERECTION ALL RISK INSURANCE
(All Rates are in Rupees per mille)
Risk Sl. Description Rate for Rate for Rate for Rate for Excess per
claim is
No. No. 1st month + 1 month 1 month 1 month or 5% of
1 month part thereof claim
for testing
---------------------------------- 44
Tariff Advisory Committee
1-1-01
amount
or part subject to
period minimum
or part
thereof extension of
thereof ,for
Testing within Rs............
subsequent for period policy Normal/
10 months exceeding period
12 months Testing
periods
1 2 3 4 5 6 7 8
Individual
20000/
capacity not
210606 (i) 3.00 1.10 0.05 0.4
exceeding 50000
250KW
Above
250KW & 40000/
210608 (ii) 3.50 0.10 0.05 0.4
upto 100000
400KW
80000/
Above
210610 (iii) 4.00 0.10 0.05 0.4
400KW 200000
b) Utility Compressors
including their drives.
400318 (i) Turbine Driven 1.75
400416 (ii) Motor Driven 1.50
Excess
per claim
Rate for
is 5% of
Rate for 1 month or
Rate for claim
1 month part thereof
Rate for 1 month amount
or part for testing
Risk Sl. 1st month + or part subject to
Description thereof period
No. No. 1 month thereof ,for minimum
for period extension
Testing subsequent of
exceeding within
10 months Rs..........
12 months policy
Normal/
period
Testing
periods
1 2 3 4 5 6 7 8
15000/
140102 18 Precious 2.25 0.05 0.30
40000
Metals,
(Platinum, 0.025
gold, Silver
etc.)Refining
&
---------------------------------- 46
Tariff Advisory Committee
1-1-01
Fabrication
Plants.
up to 5 30
15 30 20
30 40 15
40 45 10
45 50 5
---------------------------------- 47
Tariff Advisory Committee
1-1-01
50 60 Nil Nil
60 80 5
80 100 10
100 125 15
125 150 20
150 200 35
---------------------------------- 48
Tariff Advisory Committee
1-1-01
ii)In those cases where both Gas Turbines and Steam Turbines Sets are covered under the same
MCE/SCE policy for a common period of insurance, the policy can be extended to cover Open
Cycle Mode of Gas Turbines at following rates:
Within Policy Period -------- 1.00 per mille per month or part thereof
This decision will be effective from 1st January, 2001.
Secretary
GO TO INDEX
---------------------------------- 49
Tariff Advisory Committee
1-1-01
As different practices are being followed in computing the Sum Insured for eligibility criteria, it
is clarified that "Sum Insured" should be aggregate of the following items only, as is existing in
the Committee’s EAR/CAR tariff.
A) Marine (Imports) - Landed cost at site
B) Marine (Indigenous) - Landed cost at site
C) Cost of Erection/Construction
D) Permanent Civil Engineering Works
E) Half the escalation value if escalation is opted for
Policy-wise Sum Insured should only be considered.
2. Deletion of Word ‘Guide’ appearing in the circular
It was decided to delete the word "guide" appearing in the circular, (referred above) as the "guide
norms" referred to in the circular gave an impression that the norms were not binding and
insurers could still deviate. These norms were mandatory to be followed as such the word ‘guide’
is being deleted.
3. Volume Discount
Following slabs of Sum Insured were to be deleted from the table showing Sum Insured and
Volume Discount, as these were irrelevant.
Upto 100 cr. NIL
Above 1500 cr. 25%
Above 2500 cr. 30%
4) DSU/ALOP Proposals
It was pointed out that the wordings as provided in Ruling 6 of `Annexure’ to the circular, gave
an impression that any project policy having an additional cover of DSU/ALOP would go out of
purview of the rating norms even if the Sum Insured was within the eligible criteria.
It was clarified that all proposals where the Sum Insured was above Rs.100 cr. and upto 1500 cr.
should necessarily be rated as per the norms of the circular, irrespective of DSU/ALOP covers.
Only the rating of DSU/ALOP covers were outside the purview of the tariff.
5. Additional Covers not listed in the Circular
It was decided that for additional covers not listed in the circular the insurers should refer the
cases to the Committee.
6. Annexure - I - Details of Additional Covers
---------------------------------- 50
Tariff Advisory Committee
1-1-01
It was decided to agree to the suggestions for a few changes in the existing wordings of the
additional covers as shown in Annexure - I for the sake of clarity.
7. Endorsements for additional covers
It was decided that ‘endorsement’ wordings should be reworded in line with those prevailing as
per international practices.
8. The Modified/Revised Circular incorporating all the changes, that are agreed upon is as
under.
Following provisions as listed out in TAC’s circular Engg/164/99-6 dtd.26th Feb.99 have been
revised as under.
Proposals in respect of projects valued above Rs. 100 crs. and upto Rs. 1500 crs. will be rated
1.
as per the norms contained in Annexure I/II..
2. Projects valued in excess of Rs. 1500 crs. could be rated on the basis of Re-insurance quotes.
In other words project valued in excess of Rs. 1500 crs. go out of Tariff.
3. As regards projects with Sum Insured Rs. 100 crs. and less. The provisions of the tariff shall
continue to apply.Insurers will continue to rate such proposals as per tariff provisions.
The above provisions are effective from 1st January, 2001.
Secretary
ANNEXURE - 1
NORMS FOR RATING OF LARGE MCE/EAR/SCE/CAR PROJECTS
WITH SUM INSURED ABOVE Rs.100 CRS. AND UPTO 1,500 CRS.
1. Compute basic rate as per EAR/SCE/CAR tariffs without application of discounts.
2. Apply Volume Discount on the basic rate as per following Scale.
Sum Insured Discount (%)
Above 100 crs. & upto 350 crs 10
Above 350 crs. & upto 700 crs 15
Above 700 crs. & upto 1500 crs 22½
‘Sum Insured’ should be the aggregate of the following items only as is existing in the
Committee’s EAR/CAR Tariffs.
A) Marine (Imports) - Landed cost at site
B) Marine (Indigenous) - Landed cost at site
C) Cost of Erection/Construction
D) Permanent Civil Engineering Works
---------------------------------- 51
Tariff Advisory Committee
1-1-01
E) Half the escalation value if escalation is opted for
Apply Voluntary Excess Discount on the net rate arrived as in (2) above, as per the following
3.
Scale.
Voluntary Excess Discount
2 times Compulsory excess 5%
5 times - do - 10%
10 times - do - 20%
20 times - do - 30%
30 times - do - 35%
40 times - do - 40%
50 times - do - 45%
100 times - do - 50%
More than 100 times Compulsory Excess 55%
N.B. : Net discounted SCE rate/CAR rate shall not be less than 30% of basic rate so arrived as in
(1) above.
4. Adjust the net rate as arrived in (3) above, by addition/substraction of the following additional
extras/reductions corresponding to various additional covers listed in the Annexure - 2 to arrive
at the overall net rate.
5. For any additional cover, not listed in the Annexure-2 refer the matter to Committee.
6. Note :- Rating of DSU/ALOP Proposals:- All proposals where the Sum Insured is above
Rs.100 cr and upto Rs. 1500 crs should necessarily be rated as per the norms of this circular,
irrespective of DSU/ALOP Covers. Only the rating of DSU/ALOP covers was outside the
purview of the Committee.
ANNEXURE - 2
Rate
Rating Group
Additional Covers Limits per
Code
mille
---------------------------------- 52
Tariff Advisory Committee
1-1-01
FLEXA risks.......... 0.20
Loss minimisation
e) O Nil
expenses
---------------------------------- 53
Tariff Advisory Committee
1-1-01
N.B.:This should be restricted
Waiver of contribution
j) between Principal and the contractor O Nil
clause
and should not be waived for others.
Waiver of Subrogation
l) 0.05
clause A
Continuity of Cover
during operational
phase for Unit /Plant
o) (For every month or part thereof ) 0.20
tested but awaiting D
integral testing. (Along
with other Units/Plants)
Amendment in Fire
q) fighting endorsement O Nil
wordings
---------------------------------- 54
Tariff Advisory Committee
1-1-01
UptoRs.10 cr.................................. O Nil
r) Additional Custom duty Rs.10 cr to Rs.30 cr............... A 0.05
Beyond Rs.30 cr ................ C 0.15
-O’ - NIL
- ‘A’ - 0.05%o
- ‘B’ - 0.10%o
- ‘C’ - 0.15%o
- ‘D’ - 0.20%o
Risk Sl. Description Rate for Rate for Rate for Rate for Excess per
No. No. 1st month + 1 month 1 month 1 month or claim is
1 month or part or part part thereof 5% of
Testing thereof ,for thereof for testing claim
---------------------------------- 55
Tariff Advisory Committee
1-1-01
subsequent for period period amount
10 months exceeding extension subject to
12 months within minimum
policy of
period Rs............
Normal/
Testing
periods
1 2 3 4 5 6 7 8
Individual
capacity not 20000/
210606 (i) 3.00 0.10 0.05 0.4
exceeding 50000
250KW
Above
250KW & 40000/
210608 (ii) 3.50 0.10 0.05 0.4
upto 100000
400KW
80000/
Above
210610 (iii) 4.00 0.10 0.05 0.4
400KW 200000
* Petrochemical
Plants 1.60 14
2 Upto MB S.I.of
Rs.700 crs
1.60 21
> 700 crs.
Other Plants
1.00 7
Upto MB S.I. of
3
Rs.150 Crs.
1.40 14
> Rs.150 crs.
* For first year of operation (new plant) the time excess shall be increased by 7
days
* If claims experience for the expiring policy period exceeds 30% the time
excess will increase by 7 days in all the cases.
All proposals in case of renewals / new business falling on OR after 31st March,
2001 should be referred to the Committee for rating , within one month from
inception / renewals of MLOP cover .
SECRETARY
GO TO INDEX
Engg.-Gen-6/Fire-Gen-102/2001-10 28thMarch,2001
Re: Rating of MLOP Proposals -- Provisional rates
---------------------------------- 57
Tariff Advisory Committee
1-1-01
Further to the TAC Circular No.Engg/Gen-6/Fire-Gen-102/2001-10 dtd. 27-3-2001, issued in
repsect of rating of MLOP proposals under ‘Industrial All Risks Insurance’ and ‘Engineering
Insurance’ we are to clarify as below:-
1. The provisions of the said circular shall be applicable for all new business and renewals falling
due on or after 31st March, 2001.
2. The claim experience referred to in the Circular for reviewing time excess shall comprise
combined claims experience of MB and MLOP, for both ‘Industrial All Risks Insurance’ and
‘Engineering Insurance’ policies.
3. MLOP policies incepted prior to 31-3-2001 shall not be cancelled mid-term and renewed at
the same rates and terms charged prior to 31-3-2001.
You are requested to advise your operating offices suitably in this regard.
Secretary
GO TO INDEX
* Petrochemical
Plants 1.60 14
2 Upto MB S.I.of
Rs.700 crs
1.60 21
> 700 crs.
Fertilizer plants
1.00 7
Upto MB SI of
3
Rs.700 crs.
1.60 14
. Rs.700 crs.
Other Plants
1.00 7
Upto MB S.I. of
4
Rs.150 Crs.
1.40 14
> Rs.150 crs.
* For first year of operation (new plant) the time excess shall be increased by 7
days
** If claims experience for the expiring policy period exceeds 30% the time
excess will increase by 7 days in all the cases.
Machine
or
Item
Equipment Details of Machines/Equipment
No.
to be
Insured *
Relative Reserve Spare No. Age Whether Details of Special Any other
Importance Capacity parts of indeginous Loss technical relevant
---------------------------------- 60
Tariff Advisory Committee
1-1-01
or Minimisation risks if
available Shifts information
imported measures any
* This column should contain details like voltage, KVA/KW rating, speed (RPM), No. of stages,
type (reciprocating/rotary/axial/radial/screw type, AC/DC, CNC, water tube/fire tube in case of
boilers), capacity etc.
GO TO INDEX
______________________________________________________________________________
Engg/Gen-4/55/2001/14 4th May,2001
Re: ‘Bonus Malus’ scheme under MB,CPM,EEI & DOS Policies
The Tariff Advisory Committee has decided to revise the present scheme of `Bonus-Malus’
under MB,CPM,EEI & DOS policies as under :-
BONUS/MALUS SCHEME UNDER MB, CPM, EEI & DOS POLICIES.
Average claims
ratio in % for 5 Discount Loading
years preceding the EXCESS
expiring policy % %
period
Upto 05 30 Normal
Above 45 and upto 50 5 Normal
---------------------------------- 61
Tariff Advisory Committee
1-1-01
Above 50 and upto 60 Nil Nil Normal
1. In case of DOS policies coming under the scope of the scheme, the existing "Rate Table" for
DOS policies with or without FOES ; for policy period ranging from 7 to 12 months stands
replaced by the above Bonus-Malus Scheme, which discount should be applied on the rate for
with or without FOES extension for the corresponding period.
2. The claims ratio to be calculated on incurred basis.
3. In case of DOS policies, the claims ratio shall comprise of MB and DOS portions.
---------------------------------- 62
Tariff Advisory Committee
1-1-01
This decision is effective from 4th May, 2001.
Secretary
GO TO INDEX
Design Defect
Additional Rate Excess Remarks
Cover as Per
To be restricted only
DE-4 of Munich Re 15% of basic rate -do-
to EAR proposals.
It was also decided that the relevant provision for "Design Defect Cover" as per Munich Re DE
4" as appearing under the above referred circular Engg/Gen-4/24/164/2001/7 dtd.1-1-01 on
"Rating of Large Project is restricted to "Erection All Risks" only.
The above decision is effective from 4th May, 2001.
Secretary
GO TO INDEX
---------------------------------- 63
Tariff Advisory Committee
1-1-01
ENGG/Gen-4/24/164/2001/16 4th May, 2001
Re: Electronic Equipment Insurance: Discount for covering Standard Fire & Special Perils
Reference is drawn to scheme under EEI tariff for granting discount on the premium rate for
electronic equipments that are covered under the EEI policy as well as Fire policy, as brought out
in the circular Engg/Gen-16/97-4 dtd.11-3-97.
Consequent upon the introduction of revised Fire tariff the Tariff Advisory Committee has
decided to revise the existing pattern of discount under EEI tariff, if the equipment that are
covered under EEI policy are also covered under Fire policy as under:-
For equipments covered under EEI Policy as also 10% of the applicable EEI
1.
under Standard Fire and Special Peril policy rate
---------------------------------- 64
Tariff Advisory Committee
1-1-01
in % extension extension
rate in % rate in
%
Upto 10 20 - As per tariff
Above 10 and upto 30 15 - - do -
Above 30 and upto 60 10 - - do -
Above 60 and upto 100 Nil - - do -
Above 100 and upto 200 - +10 - do -
Above 200 and upto 300 - +20 - do -
Above 300 and upto 400 - +40 1.5 times of normal and testing excess
Above 400 and upto 500 +50 2 times of normal and testing excess
Above 500 +50 3 times of normal and testing excess
This decision will be effective from 4th May, 2001.
Secretary
GO TO INDEX
___________________________________________________________________________
Engg/Gen-10/17/16/2001/18 4th May, 2001
Re: `Higher Excess Discount' Scheme under MB, CPM and EEI Policies at par with Scheme
under EAR, CAR Policies.
The Tariff Advisory Committee decided to adopt the present higher excess discount scheme
available under EAR/CAR policies for projects with Sum Insured less than Rs.100 cr., for MB,
CPM and EEI policies also as under:-
Excess opted Discount
2 times 5%
5 times 10%
10 times 20%
20 times 30 %
The scheme will also apply to earthquake premium alone if higher excess amounts are selected
for claims arising out of AOG Perils incase of CPM equipment.
This decision will be effective from 4th May, 2001.
Secretary
GO TO INDEX
___________________________________________________________________________
---------------------------------- 65
Tariff Advisory Committee
1-1-01
Engg/Gen-10/2001/19 4th May, 2001
Re: Rating of "pumps handling water" and all "other pumps including `Boiler Feed Water
Pumps" under Group IV : "Fertiliser Plants, Petrochemical Plants & Refineries" Section of MB
Insurance Tariff
Reference is drawn to Rating of Item : (e) Pumps (handling water other than Boiler Feed Water)
under Group
IV - "Fertiliser Plants Petrochemical Plants Refineries" Section of MB Insurance Tariff.
The Tariff Advisory Committee has decided to rate all types of 'Pumps' as under:-
Group - IV : Fertilizer plants/Petrochemical plants/Refineries:
e) Pumps and their drives
Pumps handling water : 0.75%
All other pumps including ) : a) Turbine/Engine
Boiler Feed Water Pumps ) Driven : 1.75% b) Motor Driven : 1.50%
Drives for the above Pumps
Turbine : 1.75%
Engine : 1.75%
Motor : 1.50%
The decision will be effective from 4th May, 2001.
GO TO INDEX
___________________________________________________________________________
Engg/Gen-10/2001/20 4th May, 2001
Re: MB Insurance - Extension of Time Span between Overhaul and/or open Inspection.
Reference is drawn to the Provision No.3 in respect of "Inspection of Turbines & Turbo-
generators" of "Standard Policy Form - Machinery Breakdown Insurance Policy", calling for
overhauling in a completely opened up state not later than completion of 32000 hrs of operation
or four years whichever is earlier.
The Tariff Advisory Committee decided to introduce a tariff provision for extending the interval
between successive overhauls to 64,000 hrs/8 years as under. Requests for permission to increase
the period between successive overhauls beyond 64,000 hrs/8 years should be referred to
Committee, well in time.
Period between successive overhauls terms & conditions
Beyond 32,000 hrs/4 years and upto 48,000 Excess shall be 25% of claim subject to a
hrs/6 years minimum of 150% of tariff excess
Beyond 48,000 hrs/6 years and upto 56,000 Excess shall be 37.5% of claim subject to a
hrs/7 yrs minimum of 200% of tariff excess.
Beyond 56,000 hrs/7 yrs.and upto 64,000 Excess shall be 50% of claim subject to a
hrs/8 yrs. minimum of 300% of tariff excess
---------------------------------- 66
Tariff Advisory Committee
1-1-01
Beyond 64,000 hrs/8 years To be referred to the Committee well in
advance
The decision is effective from 4th May, 2001.
GO TO INDEX
___________________________________________________________________________
ENGG/Gen-4/24/164/2001/21 4th May, 2001
Re: Rating of Large Projects
Reference is drawn to “Guidelines” introduced for “Rating of Large Projects” with Sum
Insured above Rs.100 crs. and below Rs.1500 crs. as brought out in the TAC Circular
Engg/164/99-6 dtd.26th Feb.99 and also the modified guidelines issued vide Cir.No. Engg/Gen-
4/24/164/2001/7 dtd. 1st Jan., 2001.
The “Wordings for endorsements” in respect of “additional covers” included in the
“guidelines” are given in the Annexure.
WORDINGS OF ENDORSEMENTS
1/m Cover of Extra Charges for Overtime, Night Work, Work on Public Holidays, Express Freight
including Air Freight
It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in
the Policy or endorsed thereon and “Insured having paid the agreed premium” the Insurer shall indemnify the
insured, extra charges for Overtime, Night Work, Work on Public Holidays and Express freight (including Air
Freight).
Provided always that such extra charges are incurred in connection with any loss of or damage to the insured items
recoverable under the Policy.
If the sum(s) insured of the damaged item(s) is/are less than the amount(s) required to be insured, the amount
payable under this Endorsement for such extra charges shall be reduced in the same proportion.
Provided always that the amount payable shall not exceed -----------% of loss amount per any one occurrence
and that the indemnity in respect of Air Freight shall be subject to an additional excess of ------------% of the Air
Freight incurred per claim.
N.B.: To be deleted, where cover is up to 30% of net claims as it is without extra premium.
---------------------------------- 67
Tariff Advisory Committee
1-1-01
· Sufficient number of workmen must be fully trained in the use of such equipment and must be available for
immediate intervention at all times.
· If storage of material for the construction or erection of the contract works is necessary at site or any other
location within India, storage must be subdivided into storage units not exceeding the equivalent value of Rs.-------
per storage unit. The individual storage units must either be at least 10 meters apart or separated by fire-proof walls.
All inflammable materials (such as shuttering material not fitted for concreting, litter, etc.) and especially all
inflammable liquids and gases must be stored at a sufficiently large distance from the property under
construction or erection and any hot work like welding etc.
· Provided further that in respect of storages of Indian sourced materials at locations other than the site, the
amount payable shall not exceed Rs.---------- at any one location.
· Welding, soldering or the use of an open flame in the vicinity of combustible material is permitted only if at
least one workman suitably equipped with extinguishers and well trained in fire-fighting is present.
· At the beginning of testing all fire-fighting facilities designed for the operation of the plant must be installed
and serviceable.
4/c 72 Hours Clause
It is agreed that any loss of or damage to the Insured Property arising during any one period of seventy two (72)
consecutive hours, caused by storm, tempest, flood or earthquake shall be deemed as a single event and therefore to
constitute one occurrence with regard to the Excesses provided for herein. For the purpose of the foregoing the
commencement of any such seventy two (72) hours period shall be decided at the discretion of the Insured it being
understood and agreed, however, that there shall be no overlapping in any two or more such seventy two (72) hours
periods in the event of damage occurring over a more extended period of time.
5/g Professional Fees Clause
The Indemnity provided by this Policy is extended to include Architects, Surveyors and Consulting Engineers or
other Professional Fees necessarily incurred in the reinstatement of the Insured Property consequent upon loss or
damage but not for preparing any claim, it being understood that the amount payable for such fees shall not exceed
those authorised under the scale of the appropriate Professional Body.
The liability of the insurers under this endorsement shall in no case exceed 10% of the loss amount per any one
occurrence and Rs.---------- in the aggregate.
6/k Escalation Clause
It is hereby declared and agreed that the insured having paid the agreed extra premium, Company shall provide
for escalation in Sum Insured under items of Section I of the Schedule attached to the policy upto --------% of the
original Site Value, the basis of claim settlement shall be the original site value of affected equipment/ property as
insured plus increase in cost of replacement/ reconstruction, if any provided that the increase in the value of such
equipment/ property does not exceed -------- % of the original site value as insured.
It is also hereby declared and agreed that in the event of a claim the Insured would be considered as fully insured
upto the Sum Insured inclusive of --------% increase as per selected escalation and underinsurance would apply only
in the event of the cost of replacement / reconstruction of the affected equipment/property exceeding the original
value as insured inclusive of selected ---------- % towards escalation.
It is however understood and agreed that the premium collected against escalation provision shall not be subject to
refund of premium as provided in the premium adjustment clause.
It is further understood and agreed that in case of additional premium chargeable during final adjustment, additional
escalation premium will be charged to the insured but in case of any premium refundable during final adjustment no
refund shall be allowed against the escalation premium already charged to the Insured.
7/f Clearance and Removal of Debris
This Policy extends to cover costs and expenses necessarily incurred by the Insured with the consent of the Insurers
in demolishing or removing debris of portions of the property insured by Section I destroyed or damaged by any
peril hereby insured against upto an amount not exceeding --------% of the claim amount Rs. ----------- lacs per any
one occurrence and Rs.---------- in the aggregate.
---------------------------------- 68
Tariff Advisory Committee
1-1-01
N.B.: Not applicable if the cover is only for Rs.50 lacs.
8/b 50 : 50 Clause
In respect of the subject matter Insured hereunder consigned from outside India:
· The Insured hereby undertakes to inspect each item of the subject matter Insured upon arrival at the contract
site for possible damage sustained during transit.
· In the case of packed items which are to be left in their packaging until a later date the packaging is to be
visually inspected for signs of possible damage and where such damage is visible the items are to be unpacked and
inspected and any damage discovered reported to the Marine Insurers.
· Where the packaging of an item shows no visible signs of damage to such item having been sustained during
transit any subsequent damage discovered upon unpacking will be dealt with by the Marine Insurers or the EAR
Insurers according to whether it can be clearly established that such damage was caused before or after arrival at the
contract site.
· Where it is not possible to clearly establish whether the damage to an item was caused before or after arrival
at the contract site it is hereby agreed that the cost of such damage shall be shared equally between the Marine
Insurers and the EAR Insurers, provided such a clause is included in the Marine Policy also.
9/r Cover for Increased Customs Duty
It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in
the Policy or endorsed thereon and subject to the Insured having paid the agreed extra premium, this insurance shall
be extended to cover at the Insured exchange rate increased Customs Duty percentage payable on the replacement
supplies over and above the Customs Duty taken into account while arriving at the sum insured of the affected item.
Provided always that such additional duty is incurred in connection with any loss or damage to the insured items
recoverable under the policy and provided further that the amount payable hereunder shall not exceed Rs.----------
in the aggregate.
Each and every claim payable under this extension shall be subject to an excess of 5% of the Additional Customs
Duty incurred over and above the excess normally applicable.
N.B.: Not applicable if the cover sought is upto Rs.10 crores.
10/e Loss Minimisation Expenses
If upon the happening of any peril hereby insured resulting in actual damage to the Insured Property the Insured
shall take all steps to minimise further loss or damage arising from that occurrence or accident, expenses necessarily
and reasonably incurred by or on behalf of the Insured in an attempt to prevent or minimise such further loss or
damage will be Indemnified upto a limit of Rs.--------- in the aggregate.
11/a Owners Surrounding Property
It is hereby declared and agreed that the insured having paid the extra premium the policy extends to cover
loss of or damage to property located on or adjacent to the Project Site and belonging to or held in care, custody or
control of the Principal(s) or the Contractor (s) shall only be covered if occurring directly due to the erection,
construction or testing of the items insured under Section I and happening during the period of cover. This cover
does not apply to Construction / Erection Machinery, Plant and Equipment, Temporary Buildings and Temporary
site installations.
Limit of indemnity shall be ---------% of the policy Sum Insured.
The policy does not cover loss due to Fire, Lightning, Explosion and Aircraft damage
To be retained or deleted as per cover decided.
---------------------------------- 69
Tariff Advisory Committee
1-1-01
12/d Automatic Reinstatement
Notwithstanding anything contained herein to the contrary it is hereby agreed and understood that the amounts
insured are always to remain at risk and shall not be reduced following loss or damage insured hereunder so long as
the aggregate of the sums paid and/or payable does not exceed 10% of the completely erected value - If restricted.
It is hereby declared and agreed that the insured having paid the extra premium the amount insured are always to
remain at risk and shall not be reduced, so long as the aggregate of the sum paid and/or payable does not
exceed------ % of sum insured.
---------------------------------- 70
Tariff Advisory Committee
1-1-01
· Occurring during the maintenance period, provided such loss or damage was caused on the site during the
erection period before the certificate of completion for the lost or damaged section was issued.
Maintenance Period ------- months.
endt wordings--new
(Attached to Lar-Pro Circular 21 dated 4-5-01)
GO TO INDEX
___________________________________________________________________________
Engg/Gen-10/2001/22 13th June, 2001
The Tariff Advisory Committee has decided to rate the “stringing equipment” consisting
of hydraulic puller and tensioner machines, used for the purpose of stringing of transmission
lines under “Group II” of CPM equipment at a rate of Rs. 0.80% + earthquake extra.
This decision is effective from 13th June, 2001.
GO TO INDEX
___________________________________________________________________________
Engg/Gen-10&17/2001/24 13th June, 2001
Re: MB Insurance for Asphalt Mixing & Recycling Plants
Representations are being received for extending MB Cover for “asphalting, mixing and
recycling plants” while stationed at worksites.
As these equipment are mobile in nature and have to be shifted from site to site , Insurers
are prohibited from issuing any machinery break-down cover for these equipments.
GO TO INDEX
________________________________________________________________________
---------------------------------- 71
Tariff Advisory Committee
1-1-01
Engg/Gen-4/30/2001/25 13th June, 2001
Re: Erection All Risks Insurances of “Combined Cycle Power
Plants” - Rating of Gas Turbines while in Open Cycle Mode
and awaiting integrated testing with Steam Turbines
Reference is drawn to TAC Circular No.Engg/Gen-4/2001/5 dtd.1-1-01 giving the rate for “Open-Cycle
Mode”falling within policy period of “Gas Turbines/Combined Cycle Power Plant”
awaiting integrated testing with steam turbines covered under ‘Erection All Risks Insurance’.
In order to take into account a situation, where the ‘open-cycle’ mode extends beyond the initial period of
cover, it is decided to rate such extension at Rs. 1.50%o per month or part thereof.
Accordingly, the circular Engg/Gen-4/2001/5 dtd. 1-1-01stands revised as under , taking into account both
the situations where the ‘open cycle mode’ falls ‘within’ and ‘beyond’ policy period.
i) Gas Turbines which are covered under separate policies, have to be considered operational and the
SCE/MCE cover cannot be extended to cover such Gas Turbines, during Open Cycle Mode.
ii)In those cases where both Gas Turbines and Steam Turbines Sets are covered under the
same MCE/SCE policy for a common period of insurance, the policy can be extended to cover
Open Cycle Mode of Gas Turbines at following rates:
“Within policy period - Rs. 1.00 per mille per month or part thereof
Beyond policy period - Rs. 1.50 per mille per month or part thereof
This decision will be effective from 01-1-2001.
GO TO INDEX
___________________________________________________________________________
Engg/Gen-16/2001/26 13th June, 2001
Re: Electronic Equipment Insurance :
A) Excess for Personal Computers
B) Insurance of VSAT Eqpt.
C) Insurance of Medical Eqpt.-Additional “Endorsement”
Tariff Advisory Committee decided to introduce the following amendments in “Electronic Equipment
Insurance”Tariff..
A) “Personal Computers”
It has been decided to revise the excess for “Personal Computers” to 5% of claim amount
subject to a minimum of Rs. 2500/-.
B) Insurance of VSAT equipment
It has been decided to introduce the following rates and terms for V-SAT Equipment
Rate - Rs.1.00% for all parts of VSAT Eqpt.
Excess for AOG claims - 10% of claim amount subject to a minimum of Rs.10,000/-
Excess for other claims - As per EEI tariff
---------------------------------- 72
Tariff Advisory Committee
1-1-01
C) Medical Equipment using X-ray tubes
As regards depreciation for Medical Equipment using X-ray tubes , it has been decided
to adopt the following ‘Endorsement’s wordings’ for which are given in the “annexure”
i) Cover of x-ray valves & tubes
ii) Special condition Concerning Computer Tecnographs
iii) Warranty for Lightning and over-voltage Protection Divices
iv) Warranty concerning Air-conditioning Plant.
The decision is effective from 13th June, 2001.
Encl: “annexure”
ANNEXURE TO ITEM - 8(c) of 192 & Cir. No. 26 of 13/06/2001
_______________________________________________________________
Cover of Valves and Tubes
It is agreed and understood that otherwise subject to the terms, exclusions, provisions and
conditions contained in the Policy or endorsed thereon, this insurance shall be extended to
include loss of or damage to valves and tubes. Indemnification shall be limited to the actual
value of such items (cf 1 - 7) immediately prior to the occurrence of the loss or damage,
including ordinary freight, erection costs and custom duties and dues, if any.
1. Actual values of
1.1. stationary anode X-ray tubes in single-tank setup and rotating anode X-ray tubes without
exposure counters for diagnostic equipment
1.2. surface and close-range radio-therapy X-ray tubes and valves
1.3. video amplifier tubes
Age Actual value in % of new
(months) replacement value
Less than 18 100
Less than 20 90
Less than 23 80
Less than 26 70
Less than 30 60
Less than 34 50
Less than 40 40
<td width="267" valign="top" style="width:200.05pt;border:solid
windowtext .75pt; border-top:
---------------------------------- 73
Tariff Advisory Committee
1-1-01
ALL ENGINEERING CIRCULARS ISSUED DURING THE YEAR 2002 (till date)
Engg/Gen-6/Fire-Gen-
1 29/01/02 clarification Rating of MLOP proposals by TAC
102/2002-1
---------------------------------- 74
Tariff Advisory Committee
1-1-01
Cover for Terrorism under Engineering
17 Engg/Gen-10/2002-17 26/04/02 clarification
Policies
Engg/Gen-6/Fire-Gen-102/2002-1 29th January,2002.
Re: Rating of MLOP Proposals by TAC
This has reference to TAC Circulars listed below on the captioned subject.
Circular/letter Engg/Gen-6/Fire-Gen-102/2001- 9 dtd.27-3-01
- do - - do - 10 dtd.28-3-01
- do - - do - 12 dtd.18-4-01
- do - - do - 13 dtd.26-4-01
---------------------------------- 75
Tariff Advisory Committee
1-1-01
It is clarified as under:
1. No discount shall be allowed by the insurers on MLOP rates advised by TAC. However, in
respect of IAR policies, portfolio claims experience discount only may be allowed as per
relevant provision.
2. No insurer shall offer insurance in respect of the deductibles stated in the schedule.
Secretary
GO TO INDEX
---------------------------------- 76
Tariff Advisory Committee
1-1-01
Minimum rate Additional rate per Normal AOG/ Major
Code upto first month beyond 3 perils collapse
months
3 months
Bridges
Dry docks
Harbours
Jetties 7.83 6.09 5.07 4.53
Railway lines
Rock filled dams
Roads
1. For equipment covered under EEI Policy as also under Standard Fire and Special 10% of the applicable
Peril policy and Earthquake EEI rate
2. For equipment covered under EEI Policy as also under Standard Fire and Special 7.50% of the
peril policy without any one or two of the additional covers such as STFI or applicable
RSMTD or EQ
EEI rate
3 For equipment covered under EEI Policy as also under Standard Fire and Special 5% of the applicable
peril policy without STFI and RSMTD and EQ EEI rate
---------------------------------- 78
Tariff Advisory Committee
1-1-01
The above decision is effective from 29th January,2002.
Secretary
GO TO INDEX
---------------------------------- 79
Tariff Advisory Committee
1-1-01
Accordingly, it has been decided to incorporate a new tariff entry on 'Aerial Ropeway project'
under EAR Insurance Tariff.
A-10 Aerial Ropeway project Rate/Excess as per Item -'transmission lines' (Item T-10 of Rating
Schedule)
The above decision is efective from 29th January,2002.
Secretary
GO TO INDEX
M
---------------------------------- 80
Tariff Advisory Committee
1-1-01
Microline Wheel Alignment System To be rated under EEI Policy
Secretary
GO TO INDEX
Secretary
GO TO INDEX
---------------------------------- 82
Tariff Advisory Committee
1-1-01
For loss liability limits in excess of Rs. 200 crores, insurers can obtain rates from reinsurers and
handle its reinsurance, subject to their chargingpremium as per item 3 for the coverage up to
Rs.200 crores .
6. Deductibles:
Every claim under terrorism cover will be subject to a deductible of 0.50% of TSI and subject to
aminimum of Rs. 1 lakh.
7. Deletion of Terrorism Damage Exclusion Warranty:
If the ‘Terrorism Damage Exclusion’ is deleted by payment of premium as per item 3 above, the
policy will be endorsed as per the wordings given below.
Terrorism Damage Coverage Endorsement
It is hereby declared and agreed that in consideration of payment of additional premium of
Rs._______, the ‘TerrorismDamage Exclusion Warranty attached to and forming part
of the within mentioned policy, stands deleted. The expression/s“terrorism and/or act of
terrorism” shall have the same meaning/s as contained in TerrorismDamage Exclusion
Warranty.
This endorsement does not cover loss of or damage to property caused by
A)
I.total or partial cessation of work or the retardation or interruption orcessation of any process or
operations or omissions of any kind.
II.Permanent or temporary dispossession resulting from confiscation, commandeering,
requisition or destruction by order of the Government or any lawfully constituted Authority.
III.Permanent or temporary dispossession of any building or plant or unit or machinery resulting
from the unlawful occupation by any person of such building or plant or unit or machinery or
prevention of access to the same.
IV.Burglary, housebreaking, theft, larceny or any such attempt or any omission of any kind of
any person (whether or not such act is committed in the course of a disturbance of public peace)
in any action taken in respect of an act of terrorism.
B)
loss or damage, cost or expenses of whatsoever nature directly or indirectly caused by, resulting
from or in connection with any action taken in controlling , preventing , suppressing or in any
way relating to action taken in respect ofany act of terrorism.
If the Company alleges that by reason of this exclusion, any loss, damage, cost or expenses is not
covered by this insurance the burden of proving the contrary shall be upon the insured.
The limit of coverage under this endorsement shall not exceed Rs. _______ (inserthere the
overall liability limit).
In the event of several insurances within the same location with all Indian insurers, the maximum
aggregate loss payable per compound/location by all Indian insurers shall be Rs.200 crores.If the
actual aggregate loss suffered at one location in respect of all Indian insurers is more than Rs.200
crores, the amounts payable under individual policies shall be reduced in the same proportion as
Rs. 200 crores bears to the aggregate of all losses with all Indian insurers in that location.
The coverage under this endorsement is subject to an excess of 0.5% of the total sum insured
subject to a minimum of Rs. One lakh for each and every claim in respect of both material
damage and loss of profits combined.”
---------------------------------- 83
Tariff Advisory Committee
1-1-01
8. Treatment of Surcharge applied from 01.10.2001
A 10% surcharge on account of terrorism was applicable w.e.f 1.10.2001. All such insurance will
be cancelled on pro-rata basis as on 31.3.2002 and fresh insurance will be effected w.e.f 1.4.2002
for the un-expired period with the revised rates for terrorism risks on pro-rata basis.
In the case of insurance of risks where insurers may have already concluded reinsurance
arrangements and such cancellation is not required by reinsurance arrangements, insurers will
have the option to continue the present insurance (where 10% surcharge has been collected) till
expiry.
Insurers may advise their operating offices suitably.
Secretary
GO TO INDEX
---------------------------------- 86
Tariff Advisory Committee
1-1-01
Engg/Gen-4/24/16/17/2002-17 26th April, 2002
Re: Cover for Terrorism under Engineering Policies
Reference is drawn to Circulars :
i)Engg/Gen-4/24/16/17-14 dtd. 11-3-2002
ii) Engg/Gen-4/24/16/17-15 dtd. 15-3-2002
giving details of rates/terms to beadopted for coverage of ‘terrorism’.
Further reference is also drawn to Circular :
FT/3/2002 dtd. 8-4-02
revising the rates, terms for coverage of ‘terrorism’ :
Arising out of representations seeking clarifications on the Circular dtd. 8-4-02 referred
to above, it is clarified that all “Engineering Policies” viz. EAR, CAR, CPM, EEI & CECR will
be treated at par with industrial risks.
Secretary
GO TO INDEX
---------------------------------- 87
Tariff Advisory Committee
1-1-01
ii) EEI Policy shall not be extended to cover transit risks from one location to the other
iii) floater extra of 10% to be charged
Insurers may suitably incorporate a questionnaire in the "proposal form" to provide cover at
multi locations.
Secretary
GO TO INDEX
__________________________________________________________________
Engg/Gen-10 /2002-20 30th December,
2002
Re: Clarification under MB Insurance Policy - Coverage of Imported Machinery.
Reference is drawn to the ‘declined list’ of machines which are excluded under MB tariff.
Tariff Advisory Committee has decided to delete the entry ‘any imported machinery which
cannot be repaired in the country’ from the ‘declined list’.
GO TO INDEX
________________________________________________________________________
Engg/Gen-16/2002-21 30th December,
2002
Re: Discount for opting Higher Excess under Electronic Equipment Policy for Equipment with
value upto Rs. 1 lakh
Tariff Advisory Committee has decided to amend the ‘Higher Excess Amounts’ under the
scheme for ‘Discount for opting Higher Excess’ (Sr.No.4)of ‘Electronic Equipment Insurance’
Tariff as below for Equipment with value upto Rs. 1 lakh :
Discount for opting Higher Excess :
---------------------------------- 88
Tariff Advisory Committee
1-1-01
4 15% of the claim amount subject to a minimum of Rs. 20,000/- 42.5%
GO TO INDEX
_______________________________________________________________________
Engg/Gen-24/VII/2002-22 3 0th December,
2002
Re: CAR Insurance - ‘Refurbishment of existing Sewage System’
Tariff Advisory Committee has decided to introduce a tariff entry under CAR Insurance as
under:
1 2 3 4 5 6 7
GO TO INDEX
---------------------------------- 89
Tariff Advisory Committee
1-1-01
Re: Discount for higher excess under CAR/EAR Insurance of Projects
with S.I. less than Rs.100 crs.
Tariff Advisory Committee has revised the scheme for ‘Higher Excess Discount’ under
CAR/EAR Insurances as under.
The above scale shall also apply for opting ‘higher excess’ for Earthquake cover.
GO
TO INDEX
_______________________________________________________________
Engg/Gen-17/2002-24 30th
December, 2002
Re: Cover for CPM equipment as part of CAR and EAR/SCE Projects
Reference is drawn to G.R No.24 (under EAR tariff) and G.R.No.20 (under CAR tariff)
prescribing rates for CPM equipment forming part of the EAR or CAR projects.
Tariff Advisory Committee has decided to modify the relevant sections as under :
" CONSTRUCTION MACHINERY PLANTS AND EQUIPMENTS
---------------------------------- 90
Tariff Advisory Committee
1-1-01
A separate Sum Insured is to be fixed for Construction Plant, Machinery and Equipments used
for projects Insured under CAR or EAR policies.
a) Sum Insured of CPM equipment not exceeding 5% of EAR/SCE OR CAR Sum Insured or
Rs 25 lakhs whichever is lower
Where the Sum Insured for Construction Plant, Machinery and Equipment does not exceed 5%
of the Sum Insured for EAR/SCE (OR CAR) Insurances, or Rs.25 lakhs whichever is lower, the
same can be covered under the EAR/SCE (OR CAR) Policy, but at rates, terms and excesses, as
per tariff on ‘Contractor’s Plant and Machinery Insurance’.
b) Sum Insured for CPM equipment exceeding 5% of EAR/SCE OR CAR Sum Insured or Rs
25 lakhs whichever is lower
Where the Sum Insured for Construction Plant, Machinery and Equipment exceeds 5% of Sum
Insured for EAR/SCE (OR CAR) Insurance or Rs. 25 lakhs whichever is lower, the same should
be separately covered under the Contractor’s Plant and Machinery Policy at rates and excesses as
per Tariff on ‘Contractor’s Plant and Machinery Insurance".
GO
TO INDEX
___________________________________________________________________________
Engg/Gen-10/2002-25 30th December, 2002
Re:MB Insurance : Rating of ‘Radio Frequency Dryer’
Tariff Advisory Committee has decided to introduce a tariff entry for " Radio Frequency Drier"
under MB Insurance as under:
Group I : Electrical Machinery installed in Plants other than cold storages and ice plants
Radio Frequency Drier
Rate : Rs. 1.25%
Excess : As per tariff
The Valve Oscillator/Triode Tube Oscillator of the "Radio Frequency Dryer" shall be subject to
depreciation endorsement as per the wordings given below.
"It is agreed and understood that otherwise subject to the terms, exclusions, provisions and
conditions contained in the policy or endorsed thereon, the indemnification for loss or damage to
Valve Oscillator and/or Triode Tube Oscillator shall be limited to the actual value of such items
immediately prior to the occurrence of the loss or damage, including ordinary freight, erection
costs and custom duties and dues if any. Actual value of Valve Oscillator/Triode Tube Oscillator
shall be as under":
Age Actual value in %
---------------------------------- 91
Tariff Advisory Committee
1-1-01
(months) of new replacement value
< 18 100
< 20 90
< 23 80
< 26 70
< 30 60
< 34 50
< 40 40
< 46 30
< 52 20
< 60 10
> 60 0
GO TO INDEX
---------------------------------- 92
Tariff Advisory Committee
1-1-01
Risk Sl. Risk Premium Rates (%o) Excess - 5% of claim amount subject
Code No to Minimum of Rs
140001 a) On Land Provisional rate Rs.15 per mille. Reference to be made to TAC for final
rate quotation.
140002 b) Under Sea or Provisional rate Rs.15 per mille. Reference to be made to TAC for final
River rate quotation
Tariff Advisory Committee has decided to delete the above entry from CAR tariff and decided,
to rate such proposals under following item of EAR tariff:
Risk Code Sl Description Rate for Rate for 1 Rate for 1 Rate for 1 Excess per claim is 5% of
1st month or month or month or part claim amount subject to
No Month+ 1 part thereof, part thereof, thereof, for minimum of Rs.
month for for period testing period
testing subsequent exceeding extension
10 months 12 months within policy
period
(Rs.%0)
(Rs.%0)
(Rs.%0)
(Rs.%0)
Normal Testing
period
1 2 3 4 5 6 7 8 9
GO
TO INDEX
_____________________________________________________________________
Engg/Gen10/2003-3 (28 of 2002) 30th December, 2002
Re: Claims experience discount/loading - MB/IAR Policies.
This referes to the provision pertaining to ‘claims experience discount/loading’ under MB tariff.
Arising out of a query, TAC has clarified that in cases where an insured had availed MB policy
followed by IAR policy or vice versa without any gap between the renewals, claims experience
---------------------------------- 93
Tariff Advisory Committee
1-1-01
discount/loading under MB policy could be allowed based on the experience of MB policies and
MB portion under IAR policies.
GO TO INDEX
******************************************************************************
************************************
---------------------------------- 94
Tariff Advisory Committee
1-1-01
ENGINEERING CIRCULARS 2003
Circular No. Date of Effective Subject
Circular Date
Engg/Gen-17/ 13/03/03 13/03/03 Comprehensive Package Policy - CPM
2003-1 Equipment
Engg/Gen-10/ 17/03/03 17/03/03 MB Insurance rating of higher capacity TG
2003-2 Sets
Engg/Gen-10/ 17/03/03 17/03/03 Machinery Insurance cover for “Thermo
2003-3 Vacuum Chamber”
Engg/Gen-6/ 17/03/03 17/03/03 Time excess under MLOP Insurance
2003-4
Engg/Gen- 7/04/03 7/04/03 Rating under MB Tariff : Group IV -
10/2003-5 Fertilizer plants/ Petrochemicals
plants/Refineries
Engg/Gen-10 7/04/03 7/04/03 Special Exclusion No. 2 of MB Policy
& 17/2003-
6
Engg/Gen- 7/04/03 7/04/03 MB Policy - Extension of time span
10 /2003-7 between successive overhauls for turbines
and turbo generator sets
Engg/Gen- 7/04/03 7/04/03 Rating of plant manufacturing "Graphite
4/2003-8 Electrodes" under EAR Insurance
Engg/Gen- 7/04/03 7/04/03 (i) Volume Discount under CAR tariff
24/2003-9
Engg/Gen- 7/04/03 7/04/03 Rating of ‘Merry go-round arrangement on
17/2003-10 rails’ under CPM insurance
Engg/Gen-4 7/04/03 7/04/03 EAR and CAR Insurance: Projects with S.I.
&24 /2003-11 less than Rs.100 Crs.Higher Excess
Discount for Additional Covers
Engg/Gen- 7/04/03 7/04/03 CAR Insurance- Rating of Bridges on
24/2003-12 rivers/creeks, Dams/Coffer dams, Aqua
ducts etc.,
Engg/Gen- 7/04/03 7/04/03 Rating of " Laying Fibre Optic Cables
4 /2003-13 below Sea Bed "- under EAR Insurance
Engg/Gen- 4/11/03 1/12/03 Maintenance Visits Cover’ and ‘Extended
---------------------------------- 95
Tariff Advisory Committee
1-1-01
4&24/2003-14 Maintenance Cover’
Engg/Gen- 4/11/03 1/12/03 MB Insurance - Rating of AC/DC
10/2003-15 Generators under Group I - ‘Rate Schedule’
Engg/Gen-17/2003-1 13-3-03
Comprehensive Package Policy - CPM Equipment
The Tariff Advisory Committee in its 4th meeting held on 25-8-99 had
considered a proposal to allow the insurers to issue contingency policy on ‘FIRST
LOSS BASIS’ on CPM equipment where there were difficulties experienced by the
insureds in declaring values of the individual CPM equipment, particularly in the case
of large projects and considering the multifarious covers like transit risks, internal
breakdowns, etc., etc., required in such projects.
It was decided that the Insurance Companies may consider proposals for
contingency policy subject to adequate R.I. support including cover on First Loss
basis where there was difficulty in providing individual Sum Insured for various
machineries at different locations.
Arising out of representations from insurers for reviewing the above decision,
the TAC in it’s 13th meeting held on 10th Feb. 2003, decided that the provision for
issuing Contingency Cover could be continued subject to the following:
i) The rates and terms for tariff components should be as per tariff. For MB
cover a minimum additional rate of 0.70% should apply over and above the applicable
CPM Tariff rate. Premium for non-tariff covers should be in addition to the premium
applicable for tariff covers.
ii) Sum Insured should be on ‘reinstatement value’ basis as in CPM/MB
policies. In other words, First-loss Policies would not be allowed.
Secretary
GO TO
INDEX
_____________________________________________________________________
___
---------------------------------- 96
Tariff Advisory Committee
1-1-01
Engg/Gen-10/2003-2 17-3-03
Re: MB Insurance rating of higher capacity TG Sets
Reference is drawn to the Item No. 2(b)- “Turbo Generator Sets with capacity
upto 50 MW”, under Group-1, ‘Rate Schedule’ of MB tariff. The Tariff Advisory
Committee has decided that the existing rate of 1.50% for sets upto 50 MW
capacity shall also apply for sets upto 500 MW. Accordingly, the tariff entry is
modified as under:
Group I - Electrical Machinery installed in Plants other than Cold Storages and
Ice Plants
Risk Sl. Item Rate (%) Excess
Code No.
102416 2(b) Turbo Generator Sets with 1.50 As per tariff
capacity upto 500 MW
N.B:For higher capacity sets beyond 500MW, reference shall be
made to Committee
Insurers are requested to make a note of the change and advise the operating
offices accordingly.
Secretary
GO TO
INDEX
Engg/Gen-10/2003-3 17-3-03
Re: Machinery Insurance cover for “Thermo Vacuum Chamber”
The Tariff Advisory Committee has decided to introduce a tariff entry for
“Thermo Vacuum Chamber” under MB insurance. The new tariff entry will be as
under:
“ Group I : Mechanical items(Machines common to all Industries)
---------------------------------- 97
Tariff Advisory Committee
1-1-01
Thermo Vacuum Chamber
Insurers are requested to make a note of the change and advise the operating
offices accordingly.
Secretary
GO
TO INDEX
_______________________________________________________________________
Engg/Gen-6/2003-4 17-3-03
Secretary
GO TO
INDEX
---------------------------------- 98
Tariff Advisory Committee
1-1-01
Engg/Gen-10/2003-5 7th April, 2003
Re: Rating under MB Tariff : Group IV - Fertilizer plants/Petrochemicals
plants/Refineries
Reference is drawn to rating of Item (e) - ‘Pumps and their drives’ under Group IV -
"Fertiliser Plants/Petrochemical Plants/Refineries" Section of MB Tariff. Arising out
of representation from an insurer, the Tariff Advisory Committee has modified the
above tariff entry as under:-
Drives
Types of Pumps Pump
Motor Turbine/Engine
Driven Driven
b) Pumps handling water 0.75
%
(other than Boiler Feed Water
Pumps)
c) Other pumps 1.25
%
N.B.: If a single value is given for the entire pump set, the higher rate of the ‘drive’
shall apply overall
The following tariff entries are deleted in view of the above modification.
---------------------------------- 99
Tariff Advisory Committee
1-1-01
Risk Sr. Item No Rate %
Code No.
Insurers are requested to make a note of the change and advise the operating offices
accordingly.
Secretary
GO TO INDEX
_____________________________________________________________________
________
Beyond 32,000 hrs/4 years and upto Excess shall be 25% of claim subject to a minimum
48,000 hrs/6 years of 150% of tariff excess
Beyond 48,000 hrs/6 years and upto Excess shall be 37.5% of claim subject to a minimum
56,000 hrs/7 years of 200% of tariff excess
Beyond 56,000 hrs/7 years and upto Excess shall be 50% of claim subject to a minimum
64,000 hrs/8 years of 300% of tariff excess
Beyond 64,000 hrs/8 years and upto Excess shall be 50% of claim subject to a minimum
72,000 hrs/9 years of 500% of tariff excess and subject to compliance
with manufacturer’s recomendations and satisfactory
report by the insurance company’s engineer.
Insurers are requested to make a note of the change and advise the operating offices
accordingly.
GO TO INDEX
Secretary
_____________________________________________________________________________
Risk Sl Description Rate for Rate for 1 Rate for 1 Rate for 1 Excess per claim is 5% of claim am
Code 1st month or month or month or minimum of Rs.
No Month+ part part part
1 month thereof, for thereof, thereof,
testing subsequent for period
10 months exceeding for
testing
---------------------------------- 102
Tariff Advisory Committee
1-1-01
12 months period
extension
within
policy
(Rs.%0)
period
(Rs.%0)
(Rs.%0)
(Rs.%0)
1 2 3 4 5 6 7 8 9
Insurers are requested to make a note of the change and advise the operating offices
accordingly.
Secretary
GO TO INDEX
_____________________________________________________________________________
Zone - I 1.00
---------------------------------- 104
Tariff Advisory Committee
1-1-01
Zone – II 0.50
Zone – IV Nil
Notes -
---------------------------------- 105
Tariff Advisory Committee
1-1-01
Engg/Gen-17/2003-10 7th April, 2003
Re: Rating of ‘Merry go-round arrangement on rails’ under CPM insurance
Reference is drawn to the ‘rate schedule’ under CPM insurance tariff.
Arising out of representations from insurers, the Tariff Advisory Committee has
decided to rate ‘Merry go-round arrangement on rails’ under CPM tariff at Rs.1.25%
with applicable tariff excess.
Accordingly the present tariff entry is amended to read as under:
"Rating of General Items:
2. Merry Go Round Systems on Rails
Contractors Plant and Machinery Insurance cover for
‘Merry-go-Round arrangement on Rails’ (in respect of
locomotives and wagons only) may be granted as an
extension of CPM Policy. The applicable rate shall be
Rs.1.25% with applicable tariff excess.
The limit for TPL extension under such cover should not
exceed Rs. 1 crore for any one accident as well as the entire
policy period. Also, re-instatement of sum insured after a
loss shall not be allowed."
Insurers are requested to make a note of the change and advise the operating offices
accordingly.
Secretary
GO TO INDEX <![endif]>
_____________________________________________________________________________
---------------------------------- 106
Tariff Advisory Committee
1-1-01
Reference is drawn to the ‘higher excess discount’ scheme as brought out in the
Committee’s Circular Engg/Gen-4/24/2002-23 dtd 30-12-2002, for projects with SI
less than Rs.100 Crs., under EAR and CAR insurance.
Arising out of an insurer’s request, the Tariff Advisory Committee has decided to
extend ‘higher excess discount’ as per the existing scheme on additional covers also.
The existing provision is amended to read as under:
Gen.Reg. 12-A: Higher Excess Discount Scheme for Projects with S.I. less than
Rs.100 cr.
2 times 5% 40 40 %
times
5" 10 % 50 " 45 %
30 " 35 %
NB: The scale of discounts shall apply for all additional covers when"higher excess" is
opted.
Insurers are requested to make a note of the change and advise the operating offices
accordingly.
Secretary
GO TO INDEX <![endif]>
---------------------------------- 107
Tariff Advisory Committee
1-1-01
_____________________________________________________________________________
Excess - 5% of claim
amount subject to
Premium Rates (%o)
Minimum of Rs.
Risk Sl Risk
Code No
Minimum Addl.Rate Normal AOG/Major
Rate upto per month Perils/
first 3 beyond 3
months months Collapse
1 2 3 4 5 6 7
Note:- In respect of bridges, the above rates will be applicable only when both sub-
---------------------------------- 108
Tariff Advisory Committee
1-1-01
structure and super-structure are covered. Otherwise 50% loading shall be applicable
on the CAR rate and excess shall be 1.5 times the tariff excess.
Insurers are requested to make a note of the change and advise the operating offices
accordingly.
GO TO INDEX <![endif]>
The Tariff Advisory Committee has decided to introduce a tariff entry for " Laying of
Optical Fibre Cables below sea bed " under EAR Insurance as under:
Risk Sl Description Rate for Rate for 1 Rate for 1 Rate for Excess per claim is
Code 1st month or month or 1 month 5% of claim amount
No Month+ part part or part subject to minimum
1 month thereof, for thereof, thereof, of Rs.
testing subsequent for period for
10 months exceeding testing
(Rs.%0) 12 months period
(Rs.%0) extension
(Rs.%0) within
policy
period
(Rs.%0)
Normal Testing
period
1 2 3 4 5 6 7 8 9
---------------------------------- 109
Tariff Advisory Committee
1-1-01
110800 L Laying of
Optical 6.00 0.15 0.20 0.50 400,000 12,00,000
8 Fibre
Cables
below the
sea bed
Insurers are requested to make a note of the change and advise the operating offices
accordingly.
Secretary
GO TO INDEX
‘Maintenance Visits Cover’ & ‘Extended Maintenance Cover’
Details of cover Rate (in Rupees per mille)
Excess
---------------------------------- 110
Tariff Advisory Committee
1-1-01
months months
As applicable
i) Maintenance Visits 0.50 per
0.25 0.50 for testing
Cover annum
period
a) Charging premium on pro-rata basis for periods less than 6 months, or 6 to 12 months
shall not be allowed. For periods exceeding 12 months, the rate chargeable will be on pro-
rata basis.
b) In case of deletion of maintenance visits/extended maintenance cover (availed at
inception of a policy) before attachment of risk, refund of premium may be given by
retaining 25% of the premium under this extension.
c) In case the risk is attached, no refund shall be allowed for deletion of maintenance
visits/extended maintenance cover.
The change will be effective for all new business incepting on or after 1st December, 2003.
Insurers are requested to make a note of the change and advise the operating offices accordingly.
Secretary
GO TO INDEX
_______________________________________________________
Engg/Gen-10/2003-15 4th November, 2003
Re: MB Insurance - Rating of AC/DC Generators under Group I - ‘Rate Schedule’
---------------------------------- 111
Tariff Advisory Committee
1-1-01
It has been decided to amend the tariff entry "AC/DC Generator other than those covered by
item ------------------" under Sl No.: IV(3) of Group-1, ‘Rate Schedule’ on ‘Electrical Machinery
installed in Plants other than Cold Storages and Ice Plants’ of MB Tariff to read as under:
The change will be effective for all new business/renewals incepting/falling due on or after 1st
December, 2003.
Insurers are requested to make a note of the change and advise the operating offices accordingly.
Secretary
GO TO INDEX
ENGINEERING CIRCULARS 2004
Circular No. Date of Circular Effective Date Subject
---------------------------------- 112
Tariff Advisory Committee
1-1-01
Engg/Gen-16/2004/6 7/5/2004
Rating under MB Tariff : Group
II - ‘Mechanical Items’
---------------------------------- 113
Tariff Advisory Committee
1-1-01
Arising out of representation from an insurer, Tariff Advisory Committee has decided to charge
an additional rate of Re.1.00%o per month or part thereof if the trial operation at full load is
allowed to be conducted for periods in excess of 72 hours and upto 720 hrs..
Insurers are requested to take note and advise their operating offices accordingly.
Secretary
GO TO INDEX
1 2 3 4 5 6 7 8 9
a) Oil/Liquid
140308 Chemical/ 3.50 0.15 0.20 0.50 100,000 500,000
Liquid
Petroleum
products
Pipelines
Insurers are requested to take note and advise their operating offices accordingly.
Secretary
---------------------------------- 114
Tariff Advisory Committee
1-1-01
GO TO INDEX
Insurers are requested to take note and advise their operating offices accordingly.
Secretary
GO TO INDEX
_________________________________________________________________________
Engg/Gen-10/16/17/2004/5 7th May, 2004
Re: General Regulations under MB/EEI/CPM Tariffs -
Sequence of Computation of Premium Rate
Arising out of representation from an insurer, it is clarified that the following sequence should be
adopted for computation of the final rate:
EQ extension
MB/EEI policies CPM policy (other than EQ) under CPM
policy
Apply claims
Add 10% floater
experience
2 2 extra on rate as in Not applicable
discount/loading
(1) (if applicable)
on (1) above
---------------------------------- 115
Tariff Advisory Committee
1-1-01
Add 50% extra
Net rate after on 1/1+2 as
applying higher applicable for
3 3 Not applicable
excess discount equipment
on (2) above working
underground
Apply claims
experience
discount/loading
4 on As basic rate.
1/1+2/1+2+3/1+3
above as
applicable
N.B.: 1.The net rate shall not be less than 50% of the basic rate.
* In case of Floater Policy, the basic rate shall be the rate applicable for the highest zone (E.Q.)
Insurers are requested to take note and advise their operating offices accordingly.
Secretary
GO TO INDEX
_______________________________________________________________________
Engg/Gen-16/2004/6 7th May, 2004.
Re: Rating under MB Tariff : Group II - ‘Mechanical Items’
A tariff entry for ‘Electrostatic Precipitators’ under Group II - ‘Mechanical Items’ of MB tariff
reading as under has been introduced.
---------------------------------- 116
Tariff Advisory Committee
1-1-01
Electrostatic
205708 0.60 As per Tariff
Precipitators
Insurers are requested to take note and advise their operating offices accordingly.
Secretary
GO TO INDEX
___________________________________________________________________________
Engg/Gen-16/2004/7 7th May, 2004
Re: Higher Excess scheme under EEI Tariff
It is clarified that Circular No.Engg/Gen-16/2002/21 dated 30.12.2002 would supercede the
provisions of earlier Circular No.Engg/Gen-10/16/17/2001/18 dated 4th May, 2001.
Insurers are requested to take note and advise their operating offices suitably
Secretary
GO TO INDEX
Reference is drawn to items (iv), (v) & (vi) of tariff entry ‘Gas Turbine/Combined Cycle Power Plants’
under “Rate Schedule” of EAR Tariff. With immediate effect, these items stand replaced by the following table:
Secretary GO TO INDEX
Upto 05 30 Normal
---------------------------------- 118
Tariff Advisory Committee
1-1-01
Above 50 and upto 60 Nil Nil Normal
Excess - 5% of claims
Risk code Sl. No. Risk Premium Rates (%0) amount subject to Minium
of Rs.
---------------------------------- 119
Tariff Advisory Committee
1-1-01
Minium Addl. Rate
Rate up to per month AOG/Major
Normal
first 3 beyond 3 Perils/Collapse
months months
Below
132167 i 10 0.10 400000 800000
water
Insurers are requested to take note and advise their oprating offices suitably.
Secretary
GO TO INDEX
---------------------------------- 120
Tariff Advisory Committee
1-1-01
Clarification on determination of
Engg/Gen-4/2005/17 14/11/2005 Sum Insured and volume discount
under EAR Tariff.
__________________________________________________________________________
Engg/Gen-6-VI/2005/11 1st April, 2005
Re: Discount/Loading scheme for claim experience under MLOP tariff
Arising out of references from insurers for fixing loading/ excess for cases where claim
experience exceeds 300% , it has been decided to replace the existing table by the following
table in Section 1.10 of the norms for rating of MLOP Proposals :
No. of Yrs Discount (-)/Loading (+) scheme with additional Excess for claims
of experience (in %) under MLOP tariff.
Experience
Upto >5% >10 % >15 % >30 % >50 % >100 %
---------------------------------- 121
Tariff Advisory Committee
1-1-01
5% to
to to to to to
<=15
<=10% % <=30 % <=50 <=100 % <=300 %
%
Note : Time excess is to be specified in number of days . Where the time excess increased as above results in
fraction, the same is to be rounded off to the next higher number of days.
Rate for 1
month +1 Rate for 1
month Rate for 1
month or part Rate for 1
testing month or part
thereof, for month or part
thereof, for
period thereof, for Excess per claim is
subsequent 10
Risk exceeding 12 testing period 5% of claim amount
Sr.No Description months
Code months extension within subject to minimum of
policy period Rs.
(Rs.%o)
(Rs.%o)
(Rs.%o)
(Rs.%o)
Testing
Normal
Period
1 2 3 4 5 6 7 8 9
15400 10 (d) To be rated at par with Steam Power Plant (Risk Code 171106/Sl.no-11) subject to the following conditions:
---------------------------------- 123
Tariff Advisory Committee
1-1-01
1. Equipment in hot zone shall not be insured.
Arising out of a representation from an insurer, it has been decided to combine the existing entries “Flyovers on land (Sl. No. 8)”
and “Road Bridges on land made of (Sl. No. 10)” in the CAR Rate Schedule and replace them with a new entry as under :
10. Bridges / flyover on land -
Excess – 5% of claim
Risk Sl.
Risk Premium Rates (%o) amount subject to
Code No.
minimum of Rs.
2) Refer item 5 – Roads, for Road bridges forming part of ‘Road Construction’.
It has also been decided to delete tariff entries “Flyovers on Land” and “Road Bridges on Land made of”.
Insurers are requested to inform their operating offices accordingly.
Asst. Gen. Manager & In-charge
GO TO INDEX
---------------------------------- 124
Tariff Advisory Committee
1-1-01
Engg/Gen-24/2005/16 Date : November 14, 2005
It has been decided to revise the wordings of the notes under the tariff entry “Roads – Sl. No. 5”. The existing entry “Road – Sl. No.5” shall stand modified to read as below in view of the above
change :
5. Roads –
Excess – 5% of claim
Risk Sl.
Risk Premium Rates (%o) amount subject to
Code No.
minimum of Rs.
Insurers are requested to inform their operating offices accordingly.
Asst. Gen. Manager & In-charge
GO TO INDEX
GO TO INDEX
---------------------------------- 125
Tariff Advisory Committee
1-1-01
Sub : Duration of testing period cover for Thermal Power Plant under EAR Tariff
Arising out of a reference from an insurer, it has been decided that for extension of testing period upto 12
months within the policy period, normal testing period rate of Re.0.50%o shall apply.
In no case the duration of the testing period shall exceed 12 months. The excess applicable shall be as per EAR
tariff risk codes 181204, 181206, 181207, & 181217 under tariff entry “Turbo Generator Sets (Sl. No. 12)”.
Insurers are to use Endorsement No. ENGG/END-107 suitably modified to take care of the above change.
Insurers are requested to inform their operating offices accordingly.
Asst. Gen. Manager & In-charge
GO TO INDEX
Sub : Deterioration of stocks (Potatoes) insurance tariff – change in the wordings of Exclusions – 1 a (i) under
DEFINITION.
Arising out of a reference from an insurer, it has been decided to modify the existing wording for Exclusion No. 1 a (i) of
DEFINITION as below :
“1 The Term accident shall mean and be limited to
(a) Any sudden or unforeseen loss of or damage to the Refrigeration Machinery described in Schedule I of this policy due to
any accidental cause covered by machinery Insurance Policy specified in Schedule I and not hereinafter excluded.
Exclusions
(i) Failure of any part or parts requiring periodical renewal (such as failure of belts, gaskets, packing material, insulation and
joints of any kind except welded joints)”
Insurers are requested to inform their operating offices accordingly.
GO TO INDEX
---------------------------------- 126
Tariff Advisory Committee
1-1-01