Professional Documents
Culture Documents
BILL OF QUANTITIES
FOR
TENDER No.PA/069/2022-2023/HQ/W/05/04
FOR
REHABILITATION OF RESIDENTIAL HOUSES AT MOROGORO -
FOREST – LOT 1
2023
GENERAL SUMMARY
GENERAL DESCRIPTIONS
INSURANCE CLAUSES:
GS/1
BILL NO. 01 - PRELIMINARIES
ERATION (NIC)
05/04
ES AT MOROGORO -
ARY
AMOUNT(TSHS)
46,300,000.00
60,150,000.00
325,129,434.07
34,076,308.03
465,655,742.10
931,311.48
2,328,278.71 46,565,574.21
468,915,332.29
84,404,759.81
553,320,092.10 558,817,565.11
…..
2023
NARIES
ITEM GENERAL DESCRIPTIONS OF WORKS
DESCRIPTION OF SITE:
B The Contractor shall provide and maintain any necessary temporary roads; sleeper
tracks; and temporary cross over during the execution of the works; clear away
the same at completion and reinstate and make good any work disturbed to the
satisfaction of the Local Authority and the Employer.
C The Contractor shall be deemed to have visited the site and satisfied himself as to:-
commencement.
iii) The nature of proximity and size of adjoining building and property.
vi) The availability of land for the erection and positioning of all
T
O
C
The whole of the site will be available to the Contractor immediately upon the issue
of the order to commence.
A
B
Any sand; aggregate to or other building materials shall be the property of the
Employer and shall not be used in the construction of the works without the
written consent of the Employer.
C The Contractor is to satisfy himself as to any difficulties that the site may present
and to make all necessary enquiries to any point which in his opinion requires
further elucidation as no claim for lack of information on any of the above will be
entertained.
DESCRIPTION OF WORKS:
D The work within this contract comprises of: Demolitions and Removal;
Rehabilitation of existing residential houses.
METHOD OF MEASUREMENT:
G These Bills of Quantities have been prepared in accordance with the standard
method of measurement of Building Works for East Africa first edition (metric)
published by the architectural association of Kenya chapter of Quantity Surveyor
Act; 1970; and applied equally to the measurement of proposed works and of
variations by Quantity Surveyors.
T
O
C
DEFINITIONS OF ABBREVIATIONS:
A The Contractor should take due notice of the under mentioned abbreviations:-
mm - millimetres
cm - centimetres
M3 - cubic meters
M2 - square metres
M - linear metres
No - Number
Kg - Kilograms
P.C - Prime cost
B The Contractor shall allow for keeping all records appertaining to the work and
shall keep on the site a daily diary recording weather conditions; temperature;
visitors to the site, etc.
EMPLOYER’S INSPECTION:
E The Employer may at any time before the end of defects liability period or during
any extended time where any defect are being made good, instruct the Contractor
to open up; pull down; test or expose any part of the works in order to satisfy
himself as to the quality of materials or workmanship used. If in the opinion of the
Employer such parts are not in strict accordance with the contract documents he
may order the Contractor to remove all defective work, replace with approved
materials and reinstate any such part of the works and any other disturbed at his
own expenses and to the entire satisfaction of the Employer. If any such parts of
the works are found to be in accordance with the contract documents the
Contractor will be reimbursed with the General conditions of contract.
T
O
DISTURBANCE OR NUISANCE:
C
A The Contractor shall allow for taking all necessary precautions in the order and
execution of the work so as to avoid causing disturbance or nuisance to the
occupants of existing buildings and those adjacent to the works and for complying
with the Employer‟s instructions in this respect. The Contractor shall be in tort for
such nuisance.
D The Contractor shall be responsible for the protection of any adjacent building;
boundary walls; fences; services either overhead or underground and for the
making good of or paying for all damage thereto; should such be caused in the
course of building operations.
E The Contractor shall allow for making good all damage to the road; kerbs; surface
water channels; etc. occasioned by heavy traffic; delivery of materials and building
operations generally to the entire satisfaction of the Employer and shall be
responsible for observing any by law of Local Authority regarding keeping the road
free from mud; filth dirt; etc, out of the execution of the works.
T
O
PROTECTION FROM THE WEATHER:
C
A The Contractor shall allow for covering up and protecting all new work from injury
by weather or any other cause. Any damage; loss or expense caused by non-
compliance with the clause shall be at sole risk of the contract.
Provide all necessary cranes, hoists, concrete mixer and other plant
including ladder, staging, access gangways tackle, tarpaulins, tools, moulds
templates and other requisites necessary for proper executing, adapting from time
to time as may be necessary and maintain all plant and equipment during the
course of the contract.
C
The Contractor shall allow for providing adapting from time to time as may be
necessary and maintaining all scaffolding scaffold boards and temporary staging,
etc, necessary for the execution of
D The Contractor is to provide everything necessary for the proper execution of the
works according to the true intent and meaning of the drawings; etc. whether the
same may or may not be particularly shown on the drawings; specifications
provided that the same is reasonably to be inferred there from.
SITE ACCOMODATION:
E The Contractor shall provide and maintain any necessary temporary office
accommodation required by himself and his Sub-Contractors suitably equipped
with desks; chairs; drawing boards; and electric lighting and telephone.
F The Contractor shall provide and maintain for his workers latrine facilities washing
and drinking water, first aid equipment‟s and shelters equipped with tables;
benches and checking facilities all to the reasonable satisfaction of the workers and
approved by the Employer and Health Authorities.
G The Contractor shall provide and maintain any temporary storage, shed or
buildings which in his opinion are necessary for himself and his Sub-Contractors
for the execution of the works.
T
O
C
A WATER FOR THE WORKS
B The Contractor shall allow for all necessary clean fresh water for the works,
C including that required by Sub-Contractors and for any temporary plumbing
D metres and storage facilities and pay all charges in connection therewith and clear
E away on completion and make good works disturbed.
F LIGHTING AND POWER FOR THE WORKS
The Contractor shall allow for providing and maintaining a temporary electricity
supply for the works including that required by Sub-Contractor and for any meters
and fittings to give artificial lighting and power necessary for the execution of the
works and pay all charges, in connection and make good all works disturbed.
WATCHING AND LIGHTING:
The Contractor shall allow for providing and maintaining any barriesrs; hoalding;
watching; lighting which must comply with the By-laws of requirements of the
Local Authority and polycy regulations and the Contractor must give all requiste
policies to those authorities and provide everything necessary to protect the
general public workmen; plant; materials and the whole of the works
No advertisement will be permitted without the written authority of the Employer.
SIGN BOARD:
The Contractor shall provide and erect a large sized sign board on the site showing
the title of the contract, the name and address of the Employer; consultant,
nominated suppliers and Sub-Contractor and such information as may be required
by the Employer who shall provide the sign layout and colours of the Board. The
board shall be repainted when necessary and removed when no longer required.
PROTECTION:
The Contractor is required to protect works section until completion.
T
O
TESTING:
C
A Allow for testing all the installations required to be tested and provide everything
necessary for this purpose and leave the whole in perfect working order to the
satisfaction of the Employer and Local Authority.
The Contractor shall make good all defects and injuries to the
works, clean down external faces wash off stains to face work, clean off marks
mortar and cement, clean windows inside and out, scrub floors, flush drains run
and leave all parts of the works clean, free from rubbish and waste materials and
perfect on completion.
C The Contractor shall clean and cart away all rubbish as it accumulate and keep the
works in orderly condition to the satisfaction of the Employer
TO COLLECTION
COLLECTION
BILL
NO.
01-BI
L
PREL
L
N
TSHS.
-
-
-
-
10,000,000.00
3,000,000.00
600,000.00
1,700,000.00
15,300,000.00
15,000,000+7,000,000+5, 28,000,000.00
000,000+1,000,000
2,000,000.00
1,000,000.00
31,000,000.00
15,300,000.00
31,000,000.00
46,300,000.00
ITEM DESCRIPTION OF WORKS QTY UNIT RATE
The following Provisional Sums are for the
works or costs which cannot entirely be
foresees, defined or detailed during the
preparation of Bills of Quantities and should
be used in whole or in part at the discretion
of the Architect:
A Landscaping Sum
C Contingencies Sum
BILL NO. 02 - PRIME COSTS AND PROVISIONAL SUMS CARRIED TO GENERAL SUMMARY
30,000,000.00
150,000.00
30,000,000.00
60,150,000.00
OUSE}
ITEM GENERAL DESCRIPTIONS OF WORKS QTY UNIT RATE
Work to Floor:
- Item -
C Carefully scrap off existing internal paint; make good disturbed
surfaces to receive new paint; remove debris away from site;
(Approx. 406M²) - Item -
D Carefully scrap off existing external paint; make good disturbed - Item -
surfacse to receive new paint; remove debris away from site;
(Approx. 196M²)
- Item -
Work to Roof:
- Item -
Work to Doors:
TO COLLECTION
Windows:
A Carefully remove existing windows complete; irrespective of
their sizes; make good disturbed surfaces; (In 14No)
- Item -
Work to Sanitary Fittings :
TO COLLECTION
C O L L E C T I O N:
960,000.00
170,400.00
1,948,800.00
940,800.00
180,000.00
1,230,000.00
984,000.00
518,400.00
6,932,400.00
453,600.00
192,000.00
187,200.00
144,000.00
156,000.00
960,000.00
2,092,800.00
6,932,400.00
2,092,800.00
9,025,200.00
ITEM DESCRIPTION OF WORKS QTY UNIT RATE AMOUNT
27 M³ 6,500.00 175,500.00
B Excavate foundation trench commencing at stripped
level not exceeding 1.5m deep 22 M³ 6,500.00 143,000.00
Hardcore
F 150mm thick stone hardcore bed; leveled; compacted
and sand blinded to receive polythene membrane;
measured separately. 20 M² 4,500.00 90,000.00
CONCRETE WORK:
TO 812,000.00
COLL
ECTIO
N
Reinforced in situ concrete grade ‘25’;
including vibrating around reinforcement bars:
REINFORCEMENTS:
FORMWORK
TO 5,532,000.00
COLL
ECTIO C O L L E C T I O N:
N
PAGE 8/3/2/1 ……...…….. 812,000.00
ELE 6,344,000.00
MEN
T
NO.
ELEMENT NO. 03 – FRAMES
CONCRETE WORK:
REINFORCEMENTS:
FORMWORKS
Wrought Formwork to
ELE 7,977,196.00
ME
NT
NO.
ELEMENT NO. 04 - WALLING
BLOCK WORK:
CONCRETE WORKS:
ELEM 1,099,600.00
ENT
NO. ELEMENT NO. 05 - ROOFING
04 –
FLAT ROOF TREATMENTS
SLAB TREATMENT
ELE 10,066,950.00
ME
NT
NO.
ELEMENT NO. 06 - DOORS
HARDWOOD DOORS
4 No
B 900x2100x40mm thick; ditto; (TYPE-D2) 10 No 661,500.00 6,615,000.00
GLAZING:
TO 24,478,000.00
COLL
ECTIO
N
IRON MONGERY:
TO 4,146,000.00
COLL
ECTIO C O L L E C T I O N:
N
PAGE 8/3/6/1 ……...…….. 24,478,000.00
ELE 28,624,000.00
MN
ENT
NO. ELEMENT NO. 07 - WINDOWS
Composite Window Units; 100x45x1.2mm thick Ex-
UAE Anodised Aluminium profile framing; Ex-
UAE as microns manufactured;
bedding frame in proprietary bedding
compound; pointing with mastic; stripping
with protective tape; including mosquito
panel; including all fittings and accessories
and all necessary ironmongeries:
A 2570 x 1800mm high; divided into panels; filled in with 925,200.00 1,850,400.00
5mm clear glass {TYPE-W1) 2 No
METAL WORK:
ELE 15,182,400.00
MEN
T
NO.
ELEMENT NO. 08 - FINISHING
FLOOR FINISH
WALL FINISH
TO 13,528,240.00
COLL
ECTIO Beds and backings; one coat work; cement
N and sand (1:4); wood floated
C Kitchen Worktop
2 Nr
TO 13,490,950.00
COLL
ECTIO
N C O L L E C T I O N:
ELEME 27,019,190.00
NT NO.
08 –
FINISH
ELEMENT NO. 09 – PAINTING AND DECORATING
INTERNAL WORK:
EXTERNAL WORK
ELEM 8,333,000.00
ENT
NO. 09 ELEMENT NO. 10-PLUMBING AND
– ENGINEERING INSTALLATIONS:
2 No 550,000.00 1,100,000.00
B White vitreous china Asian type size 540x400x210mm
with high level flushing cirstern 6 litres capacity
complete with flush valve cistern, cameo seat and cover
with domex screws ''Castleware''.
2 No 300,000.00 600,000.00
C White vitreous china wash hand basin (HWB), size
750x440x200mm complete with self closing; full
pedestal and chain stay hole; fairline ½in pillar taps
with clear acrylic handles; 1¼in bead chain waste and
plug; 80cm slotted tail bolt stay; isovalve servicing
valves. rubber plug with slotted tail; 32mm plastic
bottle trap with 75mm seal. And other accesories
"Castleware"
4 No 341,000.00 1,364,000.00
D 125mm Diameter high quality plastic floor drain trap
built in concrete bed 4 No 30,000.00 120,000.00
TO 3,424,000.00
COLL
ECTIO
N
A 150mm long toilet roll holder (stainlessteel), plugged
and screwed to blockwall approved by Services
Engineer
4 No 25,000.00 100,000.00
B Shurtuff ( Dotche spray) 13mm diameter X 1000mm
long flexible hose RAYA 4 No 50,000.00 200,000.00
4 No 300,000.00 1,200,000.00
E Supply and install soap dish 4 No
12,000.00 48,000.00
F Towel 1000mm towel rail in shower area
Bobo 4 No 35,000.00 140,000.00
Supply pipes:
G Allow provision sum for water connection from the - Item 3,000,000.00
authority
TO 5,570,000.00
COLL
ECTIO
N Distribution pipes:
Dizany pipes, IPS PIPE PN 16 painted with
special paint; including joints in running
length.Fixing in accordance with
manufacture's instructions.
Flexible piping:
TO 1,141,000.00
COLL
ECTIO
N
SOIL AND PIPES:
ROOF DRAINAGE
E Supply and install fulbora 5 No 40,000.00 200,000.00
Supply and fix down pipes 110mm Diameter for rain
water collettion from the gutter and accesssories
F 30 M 12,931.03 387,931.03
5 No 650,000.00
TO 4,417,431.03
COLL
ECTIO Draw off taps; stop valves; copper alloy to
N BS 5154 or BS 1010:
2 No 400,000.00 800,000.00
MANHOLE:
3 No 700,000.00 2,100,000.00
GULLY TRAP
H Construct a standard gully trap 300*300mm deep;in 3 No 450,000.00 1,350,000.00
thick concrete block walls complete with benching and
all fittings and gully trap cover
TO 4,511,250.00
COLL
ECTIO
N
SEPTIC TANK
-
Construct septic tank overall internal
dimensions; size 2400 x 1200x 5300mm. deep in
230mm. thick solid concrete blocks walls; 230mm.
thick plain in-situ concrete grade „15‟ bed; 100mm.
thick reinforced in-situ concrete grade „20‟
suspended slab reinforced with 10mm diameter x
100 x 100mm BRC square mesh; 80mm. thick baffle
wall; complete with necessary pipe fittings; 2No.
cast iron manholes covers and frames; vent
A pipe; finished to wall sides and top of slab with 1 No 7,500,000.00 7,500,000.00
15mm thick, water proof cement and sand
render; including excavation back filling and removal
of surplus material; all as per and shown in the
drawings.
C Allow for water connection from the autority for - Item 3,000,000.00
each family
TO 18,000,000.00
COLL
ECTIO
N C O L L E C T I O N:
BILL
NO.
37,063,681.03
09 -
PLU
ELEMENT NO. 11 - ELECTRICAL WORKS:
POWER POINTS
D 45A Double Pole switch with neon indicator for cooker 2 Nr 35,000.00 70,000.00
as Tronic make or approved equivalent
TO 1,763,000.00
COLL
ECTIO LIGHT FITTINGS, FANS AND SWITCHES
N
A Light fittings X: IP 54 H35mm x W120mm CL YSRD-
09-DL Tronic LED ceiling light features anti-glare PVC
Surface or approved equivalent
14 Nr 30,000.00 420,000.00
TO 4,219,000.00
COLL
ECTIO WIRING AND CABLES
N -
CABLES
A 1C x 1.5mm² PVC copper cable as
ELSEWEDY Cable make
EARTHING
TO 4,737,200.00
COLL
ECTIO
N
FIXED ENCLOSURES FOR CABLE RUNS
-
A 20mm Dia heavy gauge PVC conduit for incoming 166 Pc 3,300.00 547,800.00
supply cable c/w all necessary accessories as MCL/
PLASCO or approved equivalent
TO 1,110,300.00
COLL
ECTIO
N C O L L E C T I O N:
ELEME 11,829,500.00
NT NO.
11 -
ELECT
SUMMARY
BILL NO. 03 - MEASURED WORKS
ELEMENT D E S C R I P T I O N S PAGE NO
9,025,200.00
6,344,000.00
7,977,196.00
1,099,600.00
10,066,950.00
28,624,000.00
15,182,400.00
27,019,190.00
8,333,000.00
37,063,681.03
11,829,500.00
162,564,717.03
325,129,434.07
CE WORK}
ITEM DESCRIPTION OF WORKS QTY UNIT RATE AMOUNT
A FENCE AND GATES: {PROVISIONAL}
B
C
Site Clearance:
Clear site of small bush; scrub; trees not
exceeding 600mm girth and the like and
grubbing up their roots 321 M² 1,500.00 481,500.00
Disposal of water
Allow for keeping excavations free from
general water by any means necessary; except
spring or running water - Item - 100,000.00
TO 2,865,000.00
COLL
ECTIO
N Plain in situ concrete grade ‘10’:
A 50mm thick; Blinding 20 M² 13,500.00 270,000.00
BLOCKWORK WALLS
TO 17,076,695.20
COLL
ECTIO Pre-cast concrete grade ‘20’ including
N hoisting to position; bedding and pointing in
cement mortar (1:4)
49 M 7,225.00 354,025.00
B 300x300x75mm thick rebated; weathered and
throated; coping to columns
20 No 8,000.00
160,000.00
7,142.86
METAL/STEEL WORKS:
C 38mm diameter vertical and horizontal pipes; welded
together as per details drawings; acnhored into
concrete columns; protected from rust by applying
three coats of zinc chromate primer; two full coats of
gloss painting. protected from rust by applying three
coats of zinc chromate primer; two full coats of gloss
painting; all as per Architects instructions
65 M² 33,620.69 2,185,344.83
D 3mmØ x 1500mm high chainlink; tied to straining wirs
(m/s) 141 M 10,400.00 1,466,400.00
48 No 40,054.00 1,922,592.00
H Ditto; for bracing poles 12 No 40,054.00 480,648.00
TO 9,861,984.83
COLL
ECTIO
N
FINISHING
METAL GATE.
TO 4,272,628.00
COLL
ECTIO
N C O L L E C T I O N:
BIL 34,076,308.03
L
NO.
04 -