Abstract.
The purpose of this project which is entitled Web Based COC information management system
for SNNPR Region .To Reduce the error that made by the users, to change the manual storage
mechanisms into computerized system (database), provide fast, efficient, flexible, reliable and
secure services for better satisfaction of users and improvement of motivation of the users. The
existing system of the organization is facing different problems such as data redundancy, lack of
data security and lots of paper work. To do this proposal the project team will uses different data
collection methods such as Interview, Document analysis and Practical observation. In order to
analyze and design the system we will use Object oriented approach for both analyzing and
designing the new system. Since the current system is manual, to change this system to web
based, we will used different software and hardware tools like PHP, sublime text editor, XAMPP,
RAM, different flashes and some others.
II
Table of Contents
CHAPTER ONE ................................................................................................................................1
1. Introduction .................................................................................................................................1
III
Tables
IV
CHAPTER ONE
1. Introduction
COC examination is an examination which is provided to college/TVET graduating students as a
final assessment mechanism for the purpose of educational quality assurance. The exam asses the
knowledge of every candidate in every course they have taken during their stay in their respective
institutions. The occupational assessment and certification system is in support to the provisions of
the Article 11 of the “Technical and Vocational Education and Training (TVET)” Proclamation
No-/20-, authorizing the Federal TVET Agency to design, innovate and adopt processes suited for
the development of Occupational Standards, and the proper implementation of the Assessment and
Certification System. The overall objective of the new national TVET strategy is to create a
competent, motivated, adaptable and innovative workforce that plays pivotal roles in the poverty
reduction and socio-economic development efforts of the country. This is achieved through
facilitating demand-driver, self-employment oriented, relevant and outcome based TVET at all levels.
That is why the Ethiopian TVET system is reorganized into an outcome-based system. This means
that identified competences of the labor market that are described in the occupational standards are
the final benchmarks not only for training and learning activities but also for the assessment of
competences and certification as well. Moreover, building an outcome-based TVET system creates
access for equal recognition of competences acquired through whatever the means and ways of being
competent. SNNPR Region is organized in late 2000 E.C under the responsibility of TVET Agency,
but officially it started full function in 2001E.C. Today this organization responsible under
Occupation Competence Assurance Agency(OCAA). Now a days, this organization provide exam in
different streams such as agriculture, Industry development, Economic infrastructure, culture, sport,
truism, trade, mining, social affairs and health The COC Exam in TVET College is given in different
level those are level one, level two, level three, level four and level five and in different ways
like oral exam, practical exam, and written exam. These documents will propose all features and
procedures to develop system this documentation contain detail about objective, scope, design,
limitation as well as description of existing system their strength and weakness. This document is
organized into different main parts; those are user requirement and specification, system analysis,
system design and data modeling.
1
1.2. Statement of problem
In current system there are two big processes. Firstly, COC office prepares registration form and
sent this form to TVET College and Candidates registered for exam by filling this form. Then
after this form sent back to office, the Office prepare exam, schedule exam time and select
supervisor randomly lastly inform schedule to TVET college. Usually exam conducted within
ten days after registration deadlines. Secondly, exam prepared by COC office sent to TVET
College with Assigned supervisor. Then after exam supervisor takes result back to office and
report to certification team (the team that produce certificate) and registry (store). Generally all
this process take place manually using paper due to this many problems occur repeatedly. We as
users of the system are identified the following major problems of the existing system.
filling forms and the like. Much searching is required. It is very difficult to find the required
information even if it exists in the database. A list of all individuals of similar name will result.
Because, while data is stored in different place using shelf or other older data store method we
have to search every place until we get what we want.
3. Reporting: some parts of the reporting pages do not work properly and it is difficult or
paper by filling forms those forms are filled by hand writing so the other person may can’t
2
creates a number of problems; changes at one place are to be made at a different number
store information at proper place at that very moment. This is because the person is unable to
quickly locate the place where the information is to be stored.
6. Lack of reliability – The reliability of the current manual system is considered to be low.
Because, all tasks related to this agency done by human and any task that is performed by
men, always contain the risk of errors so it is difficult to rely on the current manual system.
7. Lack of security: –Since it is difficult to store information at proper place at that very
moment security issue is very low in the current manual system and all files are kept on
cabinets by a box file they are exposed to theft and other environmental disaster
8. Data duplication: since there is no well-developed database and any filtration mechanism
The main objective of this project is to develop web based COC information management system
In order to achieve the main objective, we have developed the following specific objectives:
The realization of this project benefits all the major stakeholders. Here is some of significance of
our project.
improve performance of the organization: the organization can provide more flexible
service.
Provide better security: The existing system use hard copy document to store
data and it may be stole by unauthorized user easily and it causes a serious problem.
since the files stored physically if they damaged there is no back up.
4
For Employees of Office:
For Candidates:
able information.
The scope of this project will focus on developing a web based COC information management
system for SNNPR Region , more focus on managing candidate’s information start from
registration to certification. But, sub system like online exam and payment system are out of our
scope. Our systems do not include section management.
Our system contains some limitations. The reason for these limitations is the time constraints.
Time is the major problem. We have to deliver the project in a particular time period. That’s why
We have to leave some topics that actually We want to cover, We are still working on this
system and our next goal is to work up on these limitations and develop a more efficient and
elegant system. Limitations of the system are:
5
laptop computer not support on mobiles.
use the system.
user name.
The new proposed system will be economically feasible because it takes less capital. Because the
team uses open source software like MYSQL and PHP because of that no license fee therefore,
our project is economically feasible.
To complete our project starting down from the beginning up to the end of this project we
planned the following cost list.
Total 17 15,790
6
Table 1 The overall cost of the project
We expect that the project will be completed within the time frame stated, so that the system will
be feasible regarding schedule.
2 System
requirement
specification
3 System
designing
4 System
implementation
5 Operation
testing