Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual

Thank You
使用产品前,请先阅读使用

For Selecting RISEN

Read this manual carefully before operating or

servicing the equipment

The information contained in this document is believed to correct but RISEN accepts no liability for any
errors it contains, and reserves the right to alter specifications without notice.
Rev.PZS3000 Manual-eng./06-03-05 1
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual

Catalogue

Ⅰ.Summary 1

Ⅱ. Main Technical Data 1

Ⅲ. Main Structure&Working Principle 1

Ⅳ.Operation 3

Ⅴ. Troubleshooting 5

Ⅵ. Maintenance 7

Ⅶ.Sealing plate, Rotor disk Repair 7

Ⅷ.Appendix-1 Diagram 9

Ⅸ.Appendix-2 Attachment Tools 19

Ⅹ.Appendix-3 Dosing Pump Manual 20

Ⅺ Appendix-4 Liquid Accelerator/Concrete Table 22

The information contained in this document is believed to correct but RISEN accepts no liability for any
errors it contains, and reserves the right to alter specifications without notice.
Rev.PZS3000 Manual-eng./06-03-05 2
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Operation

Ⅰ、Summary
Risen PZS3000 wet-mix shotcrete machine is an updated version, based the popular
wet-mix equipments in China. And it mainly is used for wet spraying concrete. With
comparing the popular wet-mix equipment, its advantages are easy sealing, smooth
stream and uniform spraying. It also has some obvious advantages such as advanced
technology, Perfect structure, stable performance, convenient operation and longevity of service
etc. It is widely employed in mining, tunnel, culvert, subway, hydropower engineering,
underground excavation engineering etc.

Ⅱ. Main Technical Data


Rated output 5m3/h
Max. horizontal conveying distance 35m
Max. aggregate size Ф15mm
Concrete slump 8~15cm
Conveying hose Ф50/65mm
Operating air pressure 0.2~0.6MPa
Air consumption 9~10m3/min
Loading height 1.17m
Rotor Rev. 11r/min
Rebound ≤10 %
Main electric motor power 7.5kW
Dosing pump model BRJ15
Dosing pump rated pressure 0.6MPa
Dosing pump output 17.5~88L/h
Overall dimension(L×W×H) 2050×1100×1270mm
Weight 1200Kg

Ⅲ. Main Structure&Working Principle


The structure and working theory of PZS300 WET-MIX shotcrete Machine is shown as fig. 1,2,3.
The mixed concrete complying with the required W/C ratio and material ratio is filled into vibrating
hopper, From there it flows into the through-going chambers of rotor and moves to the discharge
outlet with rotor running, where it is blown to Whirl Stream Implement by compressed air leaded
by air pipe. Here it is blown by scattering, accelerating, whirling, and floating vortex stream and
through conveying hose to the nozzle, where the required volume liquid accelerator is added.
PZS3000 WET-MIX Shotcrete Machine mainly includes driving unit, rotor assy., sealing unit,
vibrating hopper, air-conveying unit, spraying unit, dosing pump unit and electric control casing
etc.
A. Driving unit
This unit consists of main electric motor and gearbox, etc.
Full sealing, Oil-immersed gearbox is mounted on the machine bottom and is transferred by
three pairs gears (Fig.4). Its overall efficiency is about 93%.
B. Rotor assy.
This unit consists of rotor body, rubber chamber and rotor disk etc (Fig.5).
This shotcrete machine adopts non-adhesive, through-going rotor with lining plastic chamber in

3
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Operation

its each hole. With this special rotor, it can improve the capacity to handle wet mixture and reduce
clearing and maintenance work.
Rotor disk: There are two rotor disks on the opposite sides of rotor, it is made of high-qualified
alloy steel and can handle concrete more than 4000m3 during its working period.
C. Sealing unit
This unit consists of upper sealing plate, lower sealing plate and clamping device, etc.
Rubber sealing plate: Here are two plates (upper and lower). Both of the upper and lower plates
are made of anti-abrasive special rubber and can handle concrete 300-400m3 during its working
period.
Clamping Device: This device is specially designed four points clamping with screw rod, by this
device, the force is acted through the screws and cylindrical springs, which works as elastic
auto-clamping device. This device can provide a constantly uniform pressure at the sealing
surfaces with a high tightening effect and low dust emission, and can avoid rubber plate
over-worn, too.
D. Vibrating hopper
This unit consists of hopper, vibrator, and screen, etc.
For this unit, with the forcing vibrating of vibrator, the wet concrete can smoothly go through the
rubber chamber.
E. Air-conveying unit
This unit consists of main air valve, upper air valve, lower air valve, pressure gauge and air
conveying line attachments, etc.
There are three ball valves separately to control main air pipe, upper air pipe leading to rotor and
lower air pipe leading to Vortex Stream Implement. A pressure gauge is mounted on the lower air
pipe to monitor the operating pressure of conveying hose.
F. Spraying unit
It consists of conveying hose and nozzle unit. Conveying hose is made of anti-abrasive rubber,
nozzle unit is made of high polymer. Water pipe, water valve and water ring are fixed on the
nozzle unit.
G. Dosing pump unit
This unit consists of dosing pump, pressure gauge, inlet hose line, adding pressure air system
and outlet hose line, etc(FIG.6).
The dosing pump is a hose pump that is used for precise adding liquid accelerator. The
advantages of this pump are reliable, high repeat dosing precision, so that the added volume of
liquid accelerator also are stability and precise. For the detailed description of dosing pump,
please refer to the Dosing Pump Manual enclosed to this Manual.
The pressure gauge of liquid accelerator, installed in the cover of the machine, is used for
watching the air pressure of accelerator hose line.
The pressure air of adding pressure air system comes from the main air hose, it is necessary to
make the liquid accelerator atomization, in this case, the liquid accelerator can be sprayed into
the nozzle with uniform condition.
H. Electric control casing
This unit consists of Breaker, contactors and overload relay, etc. For the electric route diagram,
please refer to Fig.7.

4
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Operation

Ⅳ.Operation
Operators must be trained and be familiar with this manual and the machine structure before
operating the machine.
1 Preparation before operation

Power supply must be AC380V, 50HZ, 3-phase.


Connecting wire must be over 4mm2.

A. Check all the joint points of electric control casing, and ensure all the joint points are fixed.
B. Check the lubrication in the reducers, and ensure the lubrication is right, enough and no
expired.
The required lubrication of main gearbox is No.50 Gear Oil (SY1172-77S) or No.30
Machinery Oil.
C. Check the connections of the parts, ensure that all the connections are fixed.
D. Check the Dosing pump referring to the Dosing pump manual.
E. Adjusting the adding volume of liquid accelerator
As per the demand of shotcrete project, the required volume of liquid accelerator should be adjusted
by the hand wheel of the no-class reducer, and by referring to the appendix Ⅲ, Ⅳ.
F. As per the description of FIG.1, Connect compressure air inlet hose, conveying hose, liquid
accelerator hose and nozzle. For the compressure air inlet hose, the required ID should
50mm.
G. Start the machine and make it working for a short time checking its working condition. (Note:
machine running should be the same with the arrow marked on the machine. Do not race the
machine for a long time. Referring to the dosing pump manual, and also should ensure the
rotation direction is correct.)
H. Check the clamping force on rubber sealing plate. Tighten the clamping nut step by step
until there is no air leakage from rubber sealing plate.
2. Shotcreting Operation
A. Open the main air valve and upper air valve, close the lower air valve, and then see if the air
goes through the nozzle. Then close the upper air valve and open lower air valve to see if the air
goes through nozzle. If no air or little air goes through, it indicates that the conveying hose don’t
go through. Please clean the conveying hose and ensure the conveying hose go through.
B.Open the accelerator air valve, start the dosing pump and liquid accelerator should spray from
the nozzle.
C. After the above check and preparation, now start to wet spraying concrete and open the air
valves in following order:
Completely open the accelerator air valve, main air valve, lower air valve by 2/3, upper air valve,
at this moment, the pressure of main conveying hose should be 0.2Mpa. Start main electric motor,
vibrating electric motor, dosing pump, then add the mixed concrete into the hopper and start to
wet spray concrete.
D. During spraying, the operator of machine should farther adjust the main air valve as per the
spraying man’s request. In general, the recommending spraying distance is about 0.8 to 1.2
meters.
3. Stop Spraying Concrete

5
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Operation

A. Stop to add concrete into the hopper, when confirming no concrete remains in the hopper
and no concrete is sprayed from nozzle, firstly close the dosing pump, then close vibrating
electric motor.
B. Add clean water into the hopper, the main electric motor is not closed until the clean water
flow out from the nozzle.
C. Close the main air valve, then close the accelerator air valve, shut down electric supply in the
end.
D. Clear the remainder around rotor and machine, inner of exhaust, keep the machine clean.
E. Interruptedly spraying in short time, the concrete can be remained in hopper, if the
interruptedly spraying for a long time, please don’t keep concrete in hopper, and clear the
machine in time.
4. Notice
A. During spraying, if suddenly no concrete sprays out from the nozzle, in general, there are two
possibilities:
The conveying hose is not completely blocked, but the property of concrete in the hose
changes badly, in this case, close the vibrator. After all the concrete in the hose are sprayed
out, and the pressure recovers in normal value, then restart the machine.
The conveying hose is completely blocked, in this case, shut down the machine, and clear
conveying hose.

When
During clearing machine, when remove any joint, confirm the
please ensure no pressure remains in hose/pipe. conveying
hoses are complete clean, then restart the machine.
B. During spraying, the operator of machine should pay attention to the lever of liquid
accelerator in the case, which the manufacturer doesn’t supply this case for the client, and
the pressure value of accelerator gauge. When the lever of accelerator is below the required
lever, please add the enough liquid accelerator. When the value of accelerator gauge is
beyond 0.6Mpa, please shut down the machine, and check if the accelerator hose is blocked.
C. During spraying, uniformly to add concrete into hopper is recommended.

6
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Figure

Farther Notice!
D. Attention must be paid to prevent large article entering rotor chambers to damage the machine.
E. Pleas keep the circumambience of exhaust of gearbox clean to avoid main electric motor
damage.
F. Please clear the accelerator hose to avoid the hose to be clocked after stopping spraying.
G. When clear the machine, forbid using water to flush electric control case, electric motor and any
electric elements.

If the liquid accelerator is corrosive, when the accelerator


splashes down person’s body, please timely flush out it by lots of
clean water.
Forbid remove air hose, conveying hose and accelerator hose
under pressure.

Ⅴ. Troubleshooting
Phenomena Possible Reasons Solutions
Defect of fuses;
Inspect by electrician refer to Fig.7
contactors or button
Motor coil damage Check and maintain

Main Motor not Sealing parts of gear box


start damage, dirty material go Clear the gearbox body and renew sealing
into box body and make parts
the load changes heavy

Overload Decrease the clamping force

Damaged gear Check up one by one


Motor is running,
rotor will not turn Square rod in rotor
Replace rotor
defective
Rotor does not
Wrong connection of
turn in direction for Invert phase by change over switch
phases
arrow
Clamping Device is too
loose or no evenly force Re-adjust clamping device
between four devices
Rotor disk wear out, Check Rotor Plate, if it is carved, grind it or
break change a new one(refer to Maintenance)
Air leaks between
Rotor and Sealing Sealing plates wear out Check Sealing plates, rubbing or change a
Plate and reinforce bar extrude new one(refer to Maintenance)

Exhaust is blocked Clear it

Rubber chambers partly


Clear and re-assemble them
or completely are blocked

7
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Maintenance

The slump don’t workable


or the material is not Adjust the slump to required standard
uniform
The cross section area of
air inlet pipe is too small Chang a new pipe with a larger cross
or Air supply is section or change a larger air compressor
insufficient.

If conveying hose is blocked, stops the


machine, close air valve, dismount
conveying hose from Vortex Stream
Implement, open air valve to blow the
remaining material in Rotor out, then check
the conveying hose. Strike the blocked
Rotor, vortex position to make the blocked material loose
stream Implement Oversized aggregate
or draw it out. (Note: reduce the conveying
or conveying hose pressure to zero before dismounting Vortex
blockage Stream Implement).
Rotor, vortex Now re-connected conveying hose to
stream Implement Vertex Stream Implement and blow the
or conveying hose material out.
blockage The material is sift out by required mesh.

Stop machine and air supply. If Rotor


chambers Implement is blocked, open the
Air conveying pressure is
turnover frame, open Rotor, and then clean
too low
Rotor Chambers with brush, raise air
pressure.

Upper air valve or lower Shut down machine, clear machine, then
air valve close open the valve

Whirl stream implement is


Clear and change cone casing pipe
blocked

Exhaust outlet is blocked Clear exhaust outlet

Vibrator not work Check the vibrator

Air valve doesn’t correctly


Output Capacity installed or air leakage Check and correct
declines from air hose

Due to material adhere or


block, the section of
rubber chamber and whirl Clear
stream implement is
decreased
The liquid No enough accelerator is
accelerator Add the accelerator into the case
in the case
doesn’t uniformly
mixed into The filter is blocked Clear the filter
concrete or no
Accelerator hose is
accelerator spray Maintenance and clear the hose
blocked or leakage
out from nozzle

8
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Figure

out from nozzle The holes of nozzle are


Check nozzle and clear them
blocked
Dosing pump doesn’t
Check and maintenance pump
work

Adding Air direction valve


Clear or renew it
is blocked

Blocking begins Handle blocked hose if necessary


Conveying Hose Conveying pressure is
vibrates too Check air supply
too low
strongly
Air pressure is too high Adjust air pressure

Sucking hose leakage or


No output of liquid Check hose
blocked
accelerator from
No accelerator in the
Dosing pump Add enough volume accelerator
case
Direction valve is blocked Clearing the valve
Direction valve is installed
Correct the direction
in reversed order
The output of The hose line of dosing
dosing pump is Check the leakage places
pump leakage
not up to rated The seal of direction
output or the Renew the valve
valve is disable
pressure is not
stability Adding air valve of
Open the valve`
accelerator close

Filter mesh is blocked Clear or renew the mesh

The sieve curve is not


Adjust sieve ratio when necessary
suitable
The distance between
nozzle and the surface
Enlarge the spraying distance to 0.8m
being sprayed is too
close
The distance between
nozzle and the surface Reduce the spraying distance to about 1m
Rebound rate too being sprayed is too far
high
Spraying direction is not
perpendicular to the Adjust spraying angle by about 90 degree
surface being sprayed
No liquid accelerator or
enough volume is added Check the dosing pump unit
into concrete
The compressure air is
Adjust the main air valve
too large or small

Ⅵ. Maintenance
PZS3000 WET-MIX Shotcrete Machine is suitable for arduous environment and little trouble
occurrence. However, maintenance and care should be taken to stable its function and prolong its

9
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Maintenance

working duration.
1. Sealing Plate and Rotor Plate are key parts and must pay more attention to ensure no failure
occurs during working.
Before spraying, please check the clamping force between rubber sealing plate and rotor disk,
because if the force is too small, compressed air will leak from the friction surface with little granular
which will lead dust emission around the machine. These little granular can damage sealing plate
and make sealing degrade in a short time. If the force is too high,over wear will be occurred by
friction. Sealing plate’s temperature limit is 110℃. In working , its suitable temperature is below 80
℃.
Each shift should clear sealing plate and check it tear condition. If its rubber surface is worn to
the same height as the end of reinforce bar inside it(Fig.8) it must be repaired, grind reinforce
bar or changed, otherwise its sealing capacity will be reduced.
Check Rotor Plate once a week. If Rotor Plate is deeply carved (/1mm), it should be re-grinded.
The hole of edges in Rotor Plate should be checked frequently. It should be kept sharp all the time.
If the hole of edges are blunt; small particles will enter the friction faces and lead more wearing.
Polish Rotor Plate in time will decrease much trouble and save cost.
2. Chambers and Vortex Stream Implement are made of non-adhesive material and are not
clogged in normal condition. However, they should be checked and cleared after every shift.
3. Pay attention to speed reducer frequently.
A. Its lubrication oil should be of No.50 Gear Oil (SY1172-77S) or No.30 Machinery Oil.
B. Reducer temperature rising should not exceed 40℃.
C. After every shift, the clogged material on Reduce surface should be cleared off.
D. Monitor Oil level indicator regularly, fills it up when lubrication oil is not enough.
E. Change new lubrication oil after 250 working hours (about 3 mouths).
F. Check it regularly if there is any oil leakage of Reducer and handles it in time.
G. Add lubrication grease to the bearing on the square shaft of Rotor every week.
4.Check the liquid accelerator hose line
Check and clear the hose every week.

Ⅶ. Sealing plate, Rotor disk Repair


1.Surface turning and grinding of Sealing Plate
To avoid Sealing Plate deformation while being restored. A magnetic clamping plate or a rigidly
fixing device should be used to clamp Sealing Plate on the lathe, then lathe its surface about
2-3mm till the deepest carves disappear, then grind its surface by a grinding machine or an emery
wheel 2-3 times.
The reinforce bar inside Sealing Plate must be about 2mm lower than the plate surface (Fig.2).
Work piece speed——200r/min
Grinding wheel speed——about 1600r/min
Feeding speed——0.2-0.3mm/r
2. Rotor disk Restoration
Separate Rotor disk and Rotor with a delicate chisel. Heavy hammers must not be used so as not
to damage brittle Rotor disk.
Clear the friction surfaces of Rotor and Rotor disk.
Grind Rotor Plate until all the nicks disappear.
When assembling Rotor disk to Rotor. Insert the pin into the positioned pin hole first and make it

10
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Figure

1-1.5mm lower than the surface of Rotor disk. More attention should be paid that the pin must not
be higher than the surface of Rotor disk so as not to damage Rubble Sealing Plate.

Ⅷ.Appendix-1 Diagram
1.Overall layout
2.Overall structure
3.Working principle
4.Transmission system of gearbox
5.Detailed list of bearings and gears
6.Exploded drawing of rotor assy.
7.Detailed list of rotor assy.
8.Conveying principle of liquid accelerator
9.Electric control system principle
10.Structure of rubber sealing plate
11.Detailed list of consumption parts

11
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Dosing Pump

FIG.1 Overall Layout

12
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Figure

Overall Structure
FIG..2

13
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Dosing Pump

FIG.3 Working Principle

14
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Figure

FIG.4 Transmission System of Gearbox

TABLE 1 Detailed List of Bearings and Gears


Being
No. Code Name Model Qty
parts of
1 GB276-64 Bearing 310 2 Gearbox
2 GB276-64 Bearing 311 1 Gearbox
3 GB276-64 Bearing 216 1 Gearbox
4 GB276-64 Bearing 316 1 Gearbox
5 GB276-64 Bearing 314 1 Gearbox
m=7
6 PZS15-13 Gear 1 Gearbox
z=53
m=7
7 PZS15-07 Gear 1 Gearbox
z=14
m=5
8 PZS15-17 Gear 1 Gearbox
z=74
m=5
9 PZS15-04 Gear 1 Gearbox
z=13
m=3.5
10 PZS15-03 Gear 1 Gearbox
z=103
11 PZS15-02 Gear m=3.5 z=17 1 Gearbox

15
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Dosing Pump

FIG.5 Exploded Drawing of Rotor Assy.

16
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Figure

TABLE 2 Detailed List of Rotor Assy.

No. Code Name Qty. Remark


1 GB119 Pin A16×30 4
2 GB3452.1 O-ring 1 95×3.55
3 PZS13 Lower Rubber Sealing Plate
4 GB70 Screwer 10 M10×25
5 GB93 Washer 10 10mm
6 PZS14 Rotor Assy. 1
7 PZS10 Upper Rubber Sealing Plate 1
8 GB3452.1 O-ring 1 95×3.55
9 PZS00-03 Hopper House 1
10 GB3452.1 O-ring 1 85×3.55
11 GB5783 Bolt 4 M12×15
12 GB93 Washer 4 12mm
13 PZS14-02 Press Washer 4
14 PZS14-04 Rotor Disk 2
15 PZS14-01 Rotor Body 1
16 PZS14-05 Rubber Chamber 10
17 PZS14-03 Rubber Cover 1
18 PZS14-06 Pin 8

17
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Dosing Pump

FIG.6 Conveying Principle of Liquid Accelerator

18
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Figure

FIG.7 Electric Control System Principle

19
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Dosing Pump

FIG.8 Structure of Rubber Sealing Plate

20
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Figure

TABLE 3 Detailed List of Consumption Parts


Qty.
Code Name Model Being Part of
Unit
Gearbox output
GB7452.1 O-ring Φ80×5.3 1
Shaft
GB7452.1 O-ring Φ75×3.55 Nozzle Assy. 1
GB7452.1 O-ring Φ85×3.55 Nozzle Assy 1
PZS10 Upper Sealing Plate Sealing System 1
PZS13 Lower Sealing Plate Sealing System 1
PZS-05 Rubber Chamber Rotor Assy. 10
PZS14-04 Rotor Disk Rotor Assy. 2
GB7452.1 O-ring Φ95×3.55 Sealing System 1
GB7452.1 O-ring Φ95×3.55 Sealing System 1

Ⅸ.Appendix-2 Attachment Tools

1) Inner Hex. Spanner 10(For M12) 1PC


2) Fixed Spanner 14×17 1PC
3) Fixed Spanner 17×19 1PC
4) Screwer 6” 1PC

21
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Dosing Pump

Ⅹ.Appendix-3 Dosing Pump Manual


1. Summary
BRJ15 dosing pump is an updated version based the popular type of domestic and oversea
manufacturers. Thanks to the simply structure with a little consumption parts, no-class adjusting
output and 1% repeat precision, almost clients would like to select it as dosing pump to convey
corrosive, viscous, high-density material.
2.Work Principle

Key cement is a remarkable composite reinforced hose which connects to the inlet and outlet
joints. The rotor of pump is directly installed the output shaft of reducer, and two special design
shoes are symmetrically installed in the body of rotor. When the rotor rotates, the hose is
squeezed again and again, and the material in the hose also is continuously pump with rated
output.
The special lubrication is filled at a required lever into body of pump, which can act as lubricating
and cooling, thus promote the life of hose.
The rotor Rev. can be no-class adjusted, so the output of pump also is variable.
3.Operating
1. Check the connections of the parts, ensure that all the connections are fixed.
2. Check the indicator of reducer, pump body, and ensure that the oil volume is enough and
correct.
3. Connect the inlet and outlet hose/pipe, and ensure the sealing between the hoses is good.
And the pressure gauge in the outlet line is required to monitor the output pressure.
4. Start the pump at a short time, and ensure the direction to comply with the request.
5. The hand wheel should be adjusted only when the pump is working, and forbid to adjust
hand wheel when the pump shut down. For adjusting the required output with less than 0.8

22
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Figure

Mpa, please refer to the Appendix Table.


6. Shut down pump, and close the electric supply. When pumping the easy crystal and deposit
liquid, please clear the hose line timely.

4.Maintenance
1. Variator must be lubricated by Ub-1 or Ub-3 traction liquid. And don’t add the engine oil, gear
oil into this variator. The lever of traction liquid should reach to the oil tag. The reducer should
be lubricated by gear oil 130-160EP. And required replaced traction liquid period is every
2000 hours.
2. Check the lever of special lubrication in the pump body, if renewing the lubrication, the
recommending volume is about 600ml.
3. When the distort of hose is heavy, please change the hose timely.
5.Main Technical Data

Rated Output 17.5~88L/h


Rated Pressure 0.6MPa
Max.Pressure 0.8MPa
Electric Power 0.55kw
Hose ID Ф15mm
Overall Dimension 600×280×430mm
Weight 110KGS

6.Output of RBJ15 Dosing Pump Table

23
Risen PZS3000 WET-MIX SHOTCRETE MACHINE User’s Manual Dosing Pump

Ⅺ Appendix-4 Liquid Accelerator/Concrete Table

Calculation what is the volume of liquid accelerator to add into concrete:


1. As per the required/designed accelerator volume, such as 3%, and cement weight per cubic
meter concrete, find the demand hose pump output from the Table(47.5L/h corresponding
3%)
2. As per the output from step1, find the Digit value of gauge from the Table(Value 57.2
corresponding 47.5L/h)
3. When the pump is working, adjust the hand wheel to make the value up to 57.2.