1) Common Standard Forms
FIDIC document
JCT standard Form
NEC contracts
ICC conditions of Contract
ICTAD conditions
All things are used for construction Industry in Sri Lanka.
FIDIC Document
The most commonly used standard forms of contract for intemational construction Project.
Endorsed by may multilateral development banks (MDBS) , such as the world Bank.
FIDIC contracts are generally know by the colour of their corer the Red Book
Yellow Book
Sillver Book
Green Book
Pink Book
Gold Book
White Book.
Choice of FIDIC document
Contractor design (the Provision of plant and for building or engineering Works on a design/
build basis) - Yellow Book
Yellow Book
Sillver Book
Conditions of contract for Epc/ Turnkey Project
Representative
Green Book
The joint Contracts Tribunal (JCT) publishes a suite of standard form building
Contracts.
The most popular suite of Contract for the commercial property and development
sctor and its design and build form’s on large Project.
NEC contracts
The New Engineering Contracts (NCE) are in their third edition. Originally published in
theearly1990 s, the current edition is the NEC 3 Appril 2013 edition.
May be used for works of higher Values, which are not of a complex nature
ICTAD/SBD/02
Recommeded for use on works Contract Over Rs 100 million and for Contract s of a
lesser Value, which are of a complex nature.
ICTAD/SBD/04
Recommeded to use for works Contract s where the contractor is responsible for the desing
and construction of the works on specifiedapprovals obtained from the Employet.
Reference
Lefure note.
2) Procurement method
The Various procurement methords that are available for procurement of Goods,
works,services and Informaition system.
It should be a fair and ressonable judgement that should be arrived considering the nature of
the particular procurement to local and foreign market Situations.
I. The size, type, nature and availability of the good and services to be procured.
II. Value of the procurement.
III. Availability of in house labour ormanpower.
……….etc.
1. International competitive bidding (ICB)
When the Capacity of the domestic contractors, Suppliers and Service Providers are limited
for foregin founded Projects.
National Competitive Bidding is the Competitive Bidding procedure that shall be applicable
for most Govemmntof Sri Lanka funded projects.
Invitation to bid is published by Local news papers and in relevant procurement Entrey
Websits and National Procurement Website.
Foreign funded project may be used with the agreement of the Foreign Funding Agency as
agreed in the agreement following point to be applied for foreign frems.
Bidder should have the registated in appropriate category under the ICTAD
Bid/ proposal on same conditions applicable to the domestic contractor / suppliers
Limited /Restricted bidding procedure is more appropriate when there are limited number of
Suppliers/ contractors.
The requests for Bids is directly addressed to a pre- Selected list of international or national
Suppliers international or national Suppliers or contractors.
Invitation to bid is direct addressed to pre Selected list of national (in Sri Lanka) Suppliers or
Contractors.
Invitation for bid is directly address pre - Selected list of Intemational Suppliers or contra
ctors.
Shopping – Works
Thefinanciaal limit may be enhanced by the Government depending on the disaster Situation.
This authority can be delegated down as appropriate.
Bidding period is the above period may be reasonable and practical depending on the event.
Reterance
Procurement Manual
Principle tendering method
Open tendering
Selective tendering
Nomination
Open tendering
Stats with invitating the tenders by advertising in newspapers or in the technical publications.
Advatages
Dis advantages
Tenders are called upon from certain number of contractors who are already listed.
Process
All the drawings are detailed and ask bidders to give a comprehensive BOQ
st
1 Stage – No detail design at the beginning and ask for an approximate BOQ
with Rates for main or Significant items only.
nd
2 Stage – Negotiations on detailed prices with the selectived Contractor’s
who participate in developing the design.
The advantage of this method is about bringing the contractor in the project planning
and design and earlier start of construction.
Advantages
Disadvantages
Negotiation
one contract is selected and negotiations become more detailed as the final agreement
is reached.
Negotiation advantages and disadvantages.
Advantages
Disadvantages.
Frist stage
Sedule of rates
Prices of preliminaries
% addtionfor over head and profite.
Second stage
Design, BOQ and shedules are finalized with consultantion of the contractor.
Rates and prices are negotiations and agreed work at site usually starts while negotiations are
ongoing.
Two envelop tendering
This is a combination of selective and open tendering.
Tenderers are invited to tender in the same manner as in open tendering.
However , the tenders have to submit their tender in two envelops.
Technical proposal
Financial proposal
1 Technical proposal
This includes the information regarding the tenderers tee technical, financial and managerial
capabilities.
2 Financial proposal
This includes the tenderers financial submission.
Form of tender
Priced BOQ
Process
Technical proposals are open frist, evaluate and score according to a predetermind marking
scheme.
Draw up a list of only the technically qualitied tenderers based on the scores.
3 Serial tendering
The contractor is selected through combination of selective tendering and nomination.
Used when the project can be carried out in successive phases.
The contractor is selected for the frist phase through selective tendering.
Rates and prices for the second phase will then be negotiated based on the rates and prices
agreed in the first phases.
Usually , a mechanism to adjust Rates for Successive phases are agreed in the first phase.
4 E- tendering
E- tendering can be defined as the electronic issusing and receipt of any tender
documentation in electronic format as part of the procurement process.
Physical media
Ex:- CD , DVD and Memory Sticks.
Advantages Disadvantages
Reduces paper use hence storage printing Uses advance technology
waste generation are limited
Fast and efficient Users must be familiar with the procedure.
Easy to evaluate
Referance
Lecture note