Installation Instructions

CAUTION

Before performing any work, be sure to refer to and follow all recommended safety precautions set out in the applicable Crown Service and Parts Manual. In
addition, Crown recommends that all mechanics wear appropriate protective items, such as safety glasses, work gloves, and steel-toed shoes, whenever
performing work on Crown equipment.

ADDITIONAL PARTS NEEDED FROM CROWN


Includes:
140023-008 KIT UNIVERSAL INFOLINK NON CAN W/CLAMPS
157698-001 KIT MOUNT 1.5" BALL-SOCKET ARM

NOTE: EE RATED INSTALLS REQUIRE UL LABEL 068165 BE INSTALLED


ON THE MODULE

INSTALLATION (EXAMPLE PHOTOS ONLY)


1. Move truck to secure and safe work area with sufficient space and overhead clearance.
Chock drive tires. Remove battery power.
2. Refer to the Control of Hazardous Energy section of the service manual and
lockout/tagout the truck.
3. MOUNTING: Mount InfoLink using the RAM mount kit. Verify module is easily
accessible to the operator, yet provides adequate clearance to enter and exit the truck.
Make sure the module is not positioned in a way that obstructs the operators line of sight.
4. CAN TERMINATION: Make sure that the 143198 6 pin jumper, with the terminating
resistor, is plugged into the program plug on the truck harness in order to complete the CAN network.
5. If the lift truck is equipped with an aftermarket speed control, it is recommended to interrupt the
Key Switch as close to the switch a possible.
6. Ensure any bolt or nut removed is properly tightened to allow for safe lift truck operation.
ER114901 E 5/10/2021 REVISE PER SERVICE TECH FINISH: This document contains information which is confidential and proprietary to Crown Equipment Corporation. Any form
ER112683 D PROJECT: INFOLINK of disclosure, reproduction, or distribution without prior written consent of Crown Equipment is strictly prohibited.
9/03/2020 REVISE PRESENCE PAGE
ER108051 C 9/24/2019 ADD EE RATED NOTES DRAWN BY: MCANTWIL Sheet 1 of 8
MATERIAL SPEC:
ER105789 B 9/24/2018 REVISED TO CURRENT STANDARDS DATE: 5/10/2021 DRAWING NO. C.L.
EO-47768 A 12/14/2016 RELEASE CHECKED BY: MCANTWIL
CH. NO. LET DATE CHANGE SCALE:
PART NAME: INFOLINK RAYMOND 750 H48833-477 E
Installation Instructions
7. POWER: Remove BV+ from the Keyswitch terminal and attach to InfoLink 25BVB. Re-attach InfoLink 24KEY to the now empty Keyswitch
terminal. Secure 15IGN along with the switched BV+ side of the Keyswitch. Also secure InfoLink 13GND along with truck battery gnd/negative.

BV+ To
BV+ Truck
From Key
Battery Switch

13GND

25BVB
24KEY
15IGN
ER114901 E 5/10/2021 REVISE PER SERVICE TECH FINISH: This document contains information which is confidential and proprietary to Crown Equipment Corporation. Any form
ER112683 D PROJECT: INFOLINK of disclosure, reproduction, or distribution without prior written consent of Crown Equipment is strictly prohibited.
9/03/2020 REVISE PRESENCE PAGE
ER108051 C 9/24/2019 ADD EE RATED NOTES DRAWN BY: MCANTWIL Sheet 2 of 8
MATERIAL SPEC:
ER105789 B 9/24/2018 REVISED TO CURRENT STANDARDS DATE: 5/10/2021 DRAWING NO. C.L.
EO-47768 A 12/14/2016 RELEASE CHECKED BY: MCANTWIL
CH. NO. LET DATE CHANGE SCALE:
PART NAME: INFOLINK RAYMOND 750 H48833-477 E
Installation Instructions

8. PRESENCE – Secure InfoLink 22 wire along with the Deadman Switch 1 (-2 – JPC22-8 Wire).

IL-22 PRESENCE

ER114901 E 5/10/2021 REVISE PER SERVICE TECH FINISH: This document contains information which is confidential and proprietary to Crown Equipment Corporation. Any form
ER112683 D PROJECT: INFOLINK of disclosure, reproduction, or distribution without prior written consent of Crown Equipment is strictly prohibited.
9/03/2020 REVISE PRESENCE PAGE
ER108051 C 9/24/2019 ADD EE RATED NOTES DRAWN BY: MCANTWIL Sheet 3 of 8
MATERIAL SPEC:
ER105789 B 9/24/2018 REVISED TO CURRENT STANDARDS DATE: 5/10/2021 DRAWING NO. C.L.
EO-47768 A 12/14/2016 RELEASE CHECKED BY: MCANTWIL
CH. NO. LET DATE CHANGE SCALE:
PART NAME: INFOLINK RAYMOND 750 H48833-477 E
Installation Instructions
9. TRAVEL – Route harness to traction controller behind backrest cover and place current sensor on the U cable in correct sensor orientation
and in a position not to interfere with the cover. Cable tie the sensor in place and run the sensor cable into cable mount on truck. Solder / attach
InfoLink wire 20 to InfoLink wire 19. Reattach cable, and connect the current sensor to the
TRAVEL connector from the InfoLink harness.

IL – 20 TRAVEL
IL – 19 TRAVEL

ER114901 E 5/10/2021 REVISE PER SERVICE TECH FINISH: This document contains information which is confidential and proprietary to Crown Equipment Corporation. Any form
ER112683 D PROJECT: INFOLINK of disclosure, reproduction, or distribution without prior written consent of Crown Equipment is strictly prohibited.
9/03/2020 REVISE PRESENCE PAGE
ER108051 C 9/24/2019 ADD EE RATED NOTES DRAWN BY: MCANTWIL Sheet 4 of 8
MATERIAL SPEC:
ER105789 B 9/24/2018 REVISED TO CURRENT STANDARDS DATE: 5/10/2021 DRAWING NO. C.L.
EO-47768 A 12/14/2016 RELEASE CHECKED BY: MCANTWIL
CH. NO. LET DATE CHANGE SCALE:
PART NAME: INFOLINK RAYMOND 750 H48833-477 E
Installation Instructions
10. HYDRAULICS – Remove the U, V, or W cable to the Pump Motor, and install a current sensor, in the correct orientation, on this cable
(current flows through the doughnut with the harness oriented towards battery positive). Solder / attach wire 33 to wire 32. Reattach cable, and
connect the current sensor to the LIFT connector from the InfoLink harness. Ensure any bolt or nut removed is properly torqued to recommended
spec.

IL – 33 LIFT

ER114901 E 5/10/2021 REVISE PER SERVICE TECH FINISH: This document contains information which is confidential and proprietary to Crown Equipment Corporation. Any form
ER112683 D PROJECT: INFOLINK of disclosure, reproduction, or distribution without prior written consent of Crown Equipment is strictly prohibited.
9/03/2020 REVISE PRESENCE PAGE
ER108051 C 9/24/2019 ADD EE RATED NOTES DRAWN BY: MCANTWIL Sheet 5 of 8
MATERIAL SPEC:
ER105789 B 9/24/2018 REVISED TO CURRENT STANDARDS DATE: 5/10/2021 DRAWING NO. C.L.
EO-47768 A 12/14/2016 RELEASE CHECKED BY: MCANTWIL
CH. NO. LET DATE CHANGE SCALE:
PART NAME: INFOLINK RAYMOND 750 H48833-477 E
Installation Instructions

11. IMPACT SENSOR - Locate open area of chassis to the hydraulic motor to mark and drill holes for Impact Sensor mounting,
ensuring correct orientation of the sensor. Using bracket and nuts included in the installation kit, mount sensor to the platform
ledge.
Tech Tip – You will need to slide the battery fully or partially out to drill the proper holes for the impact sensor
Tech Tip – Ensure no connectors or other items will tap against the sensor during equipment operation.

ER114901 E 5/10/2021 REVISE PER SERVICE TECH FINISH: This document contains information which is confidential and proprietary to Crown Equipment Corporation. Any form
ER112683 D PROJECT: INFOLINK of disclosure, reproduction, or distribution without prior written consent of Crown Equipment is strictly prohibited.
9/03/2020 REVISE PRESENCE PAGE
ER108051 C 9/24/2019 ADD EE RATED NOTES DRAWN BY: MCANTWIL Sheet 6 of 8
MATERIAL SPEC:
ER105789 B 9/24/2018 REVISED TO CURRENT STANDARDS DATE: 5/10/2021 DRAWING NO. C.L.
EO-47768 A 12/14/2016 RELEASE CHECKED BY: MCANTWIL
CH. NO. LET DATE CHANGE SCALE:
PART NAME: INFOLINK RAYMOND 750 H48833-477 E
Installation Instructions

12. FILTER BLOCK - For this model, it will be necessary to ensure you have connected the filter block (supplied in the kit) into the power circu it
between the 3 pin connectors marked “Power”

ER114901 E 5/10/2021 REVISE PER SERVICE TECH FINISH: This document contains information which is confidential and proprietary to Crown Equipment Corporation. Any form
ER112683 D PROJECT: INFOLINK of disclosure, reproduction, or distribution without prior written consent of Crown Equipment is strictly prohibited.
9/03/2020 REVISE PRESENCE PAGE
ER108051 C 9/24/2019 ADD EE RATED NOTES DRAWN BY: MCANTWIL Sheet 7 of 8
MATERIAL SPEC:
ER105789 B 9/24/2018 REVISED TO CURRENT STANDARDS DATE: 5/10/2021 DRAWING NO. C.L.
EO-47768 A 12/14/2016 RELEASE CHECKED BY: MCANTWIL
CH. NO. LET DATE CHANGE SCALE:
PART NAME: INFOLINK RAYMOND 750 H48833-477 E
Installation Instructions
Pinout Chart
# Description Location - Pin # Active/Inactive Label on Wire MISC Connection to Vehicle
1 Proximity Reader Prox-1 10V To Prox Sensor Connector
2 Proximity Reader Prox-3 2PRD0 To Prox Sensor Connector
3 Proximity Reader Prox-4 3PRD1 To Prox Sensor Connector
4 CAN High CAN-1 4CANH To CAN Connector
5 CAN Low CAN-2 5CANL To CAN Connector
6 Impact Sensor Power Shock-1 5V-SS To Impact Sensor Connector
7 Impact Sensor GND Shock-2 GND To Impact Sensor Connector
8 Impact Sensor X-Axis Shock-3 8-XIN To Impact Sensor Connector
9 Impact Sensor Y-Axis Shock-4 9-YIN To Impact Sensor Connector
10 LGND Battery Negative 10GND To Battery Negative
11 RS232 TX RS232-1 11TX To RS232 Connector
12 RS232 RX RS232-2 12RX To RS232 Connector
13 LGND Battery Negative 13GND To Battery Negative
14 Proximity Reader Prox-2 PRGND To Prox Sensor Connector
15 "+" BV After Key Switch Key Switch 15IGN Connects along with the switched side of the Key Switch.
16 Forward Input N/A 16 Not Connected at this time.
17 Reverse Input N/A 17 Not Connected at this time.
18 LGND Battery Negative 18GND To Battery Negative
19 Pot Input Traction Power Amp 19 Using the Travel Plug, Connects to the B+ line to the Traction Power Amp. Expected voltages for our current sensors would
20 Pot Input N/A 20 Not Connected at this time.
21 LGND Battery Negative 21GND To Battery Negative
22 Seat Brake Switch 22 Connects along with the Brake Switch (-1 – JPC20-14 Wire).
23 Brake Switch N/A 23 Not connected at this time.
24 Power to Key Switch Key Switch 24KEY Attached to PMM brown wire.
25 "+" BV Key Switch 25-BV Attached to PMM orange wire.
26 "+" BV Alarm-1 26AL To Alarm Connector
27 Buzzer, Strobe Light Alarm-2 27AL- To Alarm Connector
28 Steering CMD Ph. A N/A 28 Not Connected at this time.
29 Steering CMD Ph. B N/A 29 Not Connected at this time.
30 LGND Battery Negative 30GND To Battery Negative
31 LGND Battery Negative 31GND To Battery Negative
32 Hydraulics Lidt Power Amp 32 Using the Lift Plug, Connects to the B+ line to the Lift Power Ampr. Expected voltages for our current sensors would be app
33 Hydraulics N/A 33 Not Connected at this time.
34 Hydraulics N/A 34 Not Connected at this time.
35 Hydraulics N/A 35 Not Connected at this time.

ER114901 E 5/10/2021 REVISE PER SERVICE TECH FINISH: This document contains information which is confidential and proprietary to Crown Equipment Corporation. Any form
ER112683 D PROJECT: INFOLINK of disclosure, reproduction, or distribution without prior written consent of Crown Equipment is strictly prohibited.
9/03/2020 REVISE PRESENCE PAGE
ER108051 C 9/24/2019 ADD EE RATED NOTES DRAWN BY: MCANTWIL Sheet 8 of 8
MATERIAL SPEC:
ER105789 B 9/24/2018 REVISED TO CURRENT STANDARDS DATE: 5/10/2021 DRAWING NO. C.L.
EO-47768 A 12/14/2016 RELEASE CHECKED BY: MCANTWIL
CH. NO. LET DATE CHANGE SCALE:
PART NAME: INFOLINK RAYMOND 750 H48833-477 E