OBRA:AMPLIACIÓN DE ALMACÉN
CONTRATISTA: MARCO CASAS CONTRATISTAS GRLS.
PROPIETARIO: SENCICO
ANTERIOR
ITEM DESCRIPCIÓN UND. CANT. P.UNIT PARCIAL CANT. IMP.
1.00 CONCRETO ARMADO
1.01 COLUMNA
1.01.01 CONCRETO F'C=175 KG/CM2. M3. 12.00 333.94 4,007.28
1.01.02 ENCOF.-DESENCOF. M2. 60.00 42.00 2,520.00
1.01.03 ACERO KG. 800.00 4.94 3,952.00
1.02 VIGA
1.02.01 CONCRETO F'C=175 KG/CM2. M3. 8.00 305.15 2,441.20
1.02.02 ENCOF.-DESENCOF. M2. 40.00 46.53 1,861.20
1.02.03 ACERO KG. 500.00 4.94 2,470.00
1.03 LOSA ALIGERADA
1.03.01 CONCRETO F'C=175 KG/CM2. M3. 9.00 279.22 2,512.98
1.03.02 ENCOF.-DESENCOF. M2. 120.00 33.07 3,968.40
1.03.03 ACERO KG. 700.00 4.94 3,458.00
1.03.04 LADRILLOS 0.15X0.30X0.30 UND. 1020.00 2.67 2,723.40
2.00 MURO
2.01 LAD. KK. 18 HCO. SOGA M2. 30.00 48.84 1,465.20
2.02 LAD. KK. 18 HCO. CABEZA M2. 48.00 76.09 3,652.32
COSTO DIRECTO 35,031.98
GG (15%) 5,254.80
U ( 10%) 3,503.20
SUBTOTAL 43,789.98
% AVANCE 100.00
SALDO V1 V2 V3
12.00 12.00
40.00 20.00 40.00
800.00
8.00 8.00
40.00 30.00 10.00
500.00 500.00
9.00 9.00
120.00 100.00 20.00
700.00 200.00 500.00
1,020.00 600.00 420.00
OBRA: AMPLIACION
CONTRATISTA: P.B= 43,789.98
ESPECIALIDAD: ESTRUCTURAS FECHA= ENE.
AREA GEOGRAFICA: LAMBAYEQUE
OBRA:
SUPERVISOR:
CONTRATISTA:
PRESUPUESTO BASE:
PRESUPUESTO CONTRATADO:
K= COEFICIENTE DE REAJUSTE
D = DEDUCCION Ka=
VRC = V x K - A x V / C (K / Ka - 1)
AVANCE DE OBRA
Nº FECHA APA ARA ESTADO
REAJUSTE
Nº FECHA Vpro Vre K-1 Rprog Rreal Rrecon.
CUADRO RESUMEN DE VALORIZACION N° 01 ()
DEL 01 AL 31 AGOSTO DE..
VALORIZACIÓN (V)
TOTAL CONTRACTUAL
Avances en porcentaje
REAJUSTES (R)
DEDUCCIONES (D)
POR ADELANTO DIRECTO
POR ADELANTO PARA MATERIALES
TOTAL DEDUCCIONES
AMORTIZACIONES (A)
AMORTIZACION DEL ADELANTO DIRECTO
AMORTIZACION DEL ADELANTO PARA MATERIALES
RETENCIONES ( C )
MULTA
TOTAL