Sr.

no+A1 Description Rate


:F12
Erection of control
1
vB2:E13alve.  500/- per inch dia
2 Fabrication of PTFE Line .
 280/- inch dia
Flange alignment.
 250/- inch dia
3

DP test.  100/- inch dia


4

5 Hydro test. 2500/- per day/per person


Pickling and passivation.  100/- inch dia
6

Supervisor-2500  FOR 08 HOUR


FITTER-1600 FOR 08 HOUR
WELDER-2000 FOR 08 HOUR
7 Man power supply. RIGGER-1500 FOR 08 HOUR
HELPER-1000 FOR 08 HOUR
GASCUTTER-2500 FOR 08 HOUR
GRINDER-2500 FOR 08 HOUR

8
Installation of hose reel.
 3000/- per no

9
Installation of hose box.
 3500/-  per pc
Earthing jumper   70/- inch dia
10

Fabrication of GI pipe
 480/- per inch dis
11

12
Erection of GI pipe
 200/ inch m
13 SHOE SUPPORT WITH SS PAD 2500 PER PICE
14 SHOE SUPPORT WITH CS PAD 2000 PER PICE