Aarti Industries Ltd.

Job Safety Analysis (JSA)


Connected
JSA Code: JSA/CO/07 JSA Description: Work at Height Permit

Job specific PPE Required (check ✓ if provided, mention NA if not applicable) (Other than mandatory PPE i.e. Safety Shoes, Helmet & Safety Goggle, Gloves)
Acid-Alkali
Full Body proof Hand
Hand cotton Gloves Harness (FBH) SCBA Gloves High Voltage Electrical Hand Gloves
Chemical
Online Splash
High temperature hand gloves Respirator Chemical Suit Goggles Cut Resistance Hand Gloves
Online air Mention Job Specific PPE (By
Cartridge mask Dust Mask Mask Face Shield execution team)

Compliance
Applicable status
Sr. No. Sub activity (✓,NA) Hazard Control Measures to be taken (✓,NA) Remark
Toolbox talk conducted before start the work
Untrained personnel Trained & experience person to be deployed
Scaffolding need to be inspected before start the
work.
Ensure green tag
Segregate different parts of scaffold and stored it
separately at site.
Material Inspection All tools to be inspected before use
Check and verify Work at height permit precautions
Surrounding Hazards at workplace..
1 Pre – Work *
Any person working above 1.5m height shall be
Fall from height. considered as working at height.
Ensure all personnel assigned to work at height are
not afraid of height and medically fit for height
works
Acrophobia test must be done for workers assigned
for height work jobs.
Sufficient work space should be available for
a) Person persons to execute the job safely.
Opening cut outs must be covered with adequate
strength or hard barrication to be provided around
the opening.
Stop work at height in high wind velocity.
Personnel must worn full body harnesses and 100%
tie‐off to be maintained while working at heights.
Loose materials should not be kept or carry out on
the working platform
Loose materials should be remove from the edge of
the working platform before start the work at height
8 mm wire rope sling must to be used as a life line If
Elevated work platform will not be installed on that
location
Life line to be tightly tied with three U clamps both
side and Verticals pole should be provided every 5
meters
Safety net should to be installed below job location
when working at 7 meters height
Multi layer activity job not allowed
Loose materials at height should be secured
b) Materials properly to prevent fall.
No one should access a scaffold if there is a red tag
or no tag. Works on scaffold must be supervised at
all times.
All tools tie up with rope.
Use Full Body harness (FBH) with proper anchoring
one by one.ensure FBH not anchoring with Process
line
No equipment and tools will be stored on the
scaffold.
All persons working on scaffold must be trained on
working at heights and use of harnesses.
All harness must be checked daily by a competent
person and inspected monthly and logged. NO
workers should alter the scaffolding
Ensure that the scaffold is approved inspected by
authorised officer prior to use and tagged.
Ensure Rope is safe to use.Use rope to liftgrating
and pipe.
Health Hazards Don't throw clamps up and down.
2 Work at Height *
Three point contest policy to be used during the
Fall of objects / Tools. ascending or descending from the ladder
Quarterly inspected the access ladder by competent
person.
Colour coding to be provided after inspection of
ladder
Ladders and stepladders are visually inspected
Industrial
before use.type ladder to be used only .Do not use
any stool ladder
Operatives for performing
are trained height in
and competent work
the use of
Ladder to bestepladders
ladders and tied with the ladder clamps.
Ladder to be installed by 1:4 ratio formula light Work
Ladders and stepladders are only used for
and for short periods of time (no longer than 30
Ladder
mins) to be fixed at only 75 degree angle
Ladder toandbestepladder
fitted one inspections
meter abovetofrom
be the
documented
working in line with inspection schedules
platform.
Ladders are footed and / or
Ladder rungs should not be damagedtied into position
Gradient of ladder one in four or 75 degrees
Damaged Ladder All
Stephand toolsused
ladders tie with rope surfaces and facing the
on even
3 Access ladder * direction of work
Additional devices used to secure the ladders for the
task such as spreaders or spacers
Specification of ladders / stepladders to be checked
to ensure the correct type is used
Step Falls from a height / slips trips and falls for the job
4 ladders *
Remove the Unwanted Materials from workplace
Fall of person or material Barricade the area properly
Ensure that workplace is dry & non slippery, free
from spillage / leakage / obstacle
Ensure environmental condition is good - no rainfall
Material or person may fall due to wet, slippery or oily surface. or direct expose of gas or steam vent.
5 Housekeeping at workplace *

**

**
Additional Precaution to be taken:

Legends (*): Mandatory (hand written) to write at least 1 job specific and work condition hazard and their control measures. In case of no job specific hazard, please write "No Job specific hazard identified".
(**): In case, new sub activity found on job site, write it's job specific and work condition hazard and their control measures. Else write NA.
Declaration: I/We hereby declare that, I/we have identified & understood all the possible hazards while performing the job (including job / site specific) and adequate control measures have been mentioned (including job specific). Same have been
explained to execution team members.
Day 2 Day 3 Day 4
Date: Date: Date: Day 5 Day 6
Day 1 _____________ _____________ _____________ Date: _____________ Date: _____________

Issuer (Name & Sign)

Prepared by Permittee (Name & Sign)

Issuer (Name & Sign)

Approved by Permittee (Name & Sign)