Aarti Industries Ltd.

Job Safety Analysis (JSA)


JSA Code: JSA/ME/18 JSA Description: Pipeline / Equipment Hydro Pressure Test JSA No:

PPE's Required (check ✓ if provided, mention NA is not applicable) - Other than mandatory PPE's (Safety Shoes, Helmet & Safety Goggle)
Safety
Faceshield
Harness
Ear Plug
(For
Apron
Pneumatic
test)
Hand
Gloves

Sr. Applicable Observation


Activity Hazard & Risk Counter Measures to be taken Remark
No. (✓,X) (✓,NA)
1 Shifting of materials Unskilled Manpower or Human error Ensure trained & experience manpower to be
and Tools & Tackles Use damage vehicle or trolley for deployed for shifting of the materials for
shifting hydrotest.
Fall of material during shifting Ensure proper inspected farhana ,Tempo or
Injury Hazard trolley to be used for hydrotest equipments
Property damage shifting . Ensure its properly tie to avoid fall or
slip during shifting.
Tie equipment in such a way that it should not
imbalance during shifting.
Person holding guide rope shall keep safe
distance of 10 mtr. away from farhana while
traveling.

2 hydrotest of Pipeline / Human error or Unskilled manpower Ensure skilled / trained manpower is deployed
Equipment Injury Hazard due to excessive water
pressure Inspect hydrotest pump and other accessories
Use faulty/damage pressure gauge area in good condition / working condition
Slip & trip hazard due to Slippery Only calibrated test gauges shall be used and
surface & land pollution they shall be mounted in the upright position.
Fall of person if work at height Pump discharge gauges must be visible to the
Fall of material if work at height pump operator for the duration of the test.
Minimum of two pressure gauges with block
and bleed valves shall be provided on the
system.
Use of face shield.
Ensure safety belt / harness to be used while
working at height.
Suitable size Pressure Relief valve (PRV) to be
provided on equipment /pipeline considering
equipment design pressure .
An accessible bleed valve shall be provided for
the protection of the piping system in case an
immediate depressurizing when needed.
area to be Barricade where hydrotest take
place
Warning sign / board is provided where
hydrotest take place
Designated place or drainage is available for
draining the pipeline / equipment after
hydrotest to avoid stagnancy
Housekeeping shall be done after completion
of all the works
1All the work shall be done under proper
supervision
1Pressure shall be increased gradually with 10
minutes hold at each step, no rapid change in
pressure.
13 ) DM water to used for SS pipelines or
equipments hydrotest to avoid corrosion.
1All pipelines Gasket shall be specified
according to standard and to be permanently
used.

3 Pneumatic test of Unskilled manpower or Human error Ensure trained & experience manpower to be
Pipeline / Equipment Lack of (or) damage parts of testing deployed for pneumatic test
equipment and other accessories Inspect testing equipment and other
damage (or) Erroneous Pressure accessories area in good & working condition
Gauges and Pressure Relief Valve
Personal injury due to sudden leak of Verify the calibration certificate of Pressure
pressurized air gauges and Pressure Relief valve (PRV)
Noise Pollution during pressure leak or Ensure required PPEs including Ear Plugs to be
release used
Fall of person if work at height Ensure safety belt / harness is weared while
Fall of material if work at height working at height
Suitable size Pressure Relief valve (PRV) to be
provided on equipment /pipeline considering
equipment design pressure .
An accessible bleed valve shall be provided for
the protection of the piping system in case an
immediate depressurizing when needed.
Fall of material if work at height

Barricade the area where pneumatic test take


place
Warning sign / board to be provided where
hydrotest take place
Pressure shall be increased gradually with 10
minutes hold at each step, no rapid change in
pressure.
All the work shall be done under continuous
supervision
1Needs very careful checking of weld joints
thoroughly before testing . (Refer ASME Sec. V
Div. 1, UW – 50)
1Testing should be done with small segmental
lengths at a time.

4 Housekeeping Slip fall, trip leading to injury Do proper Housekeeping after completing the
Oil spillage on floor while oil filling work
Wear PVC laminated Hand Gloves
Use Oilcan for oil filling and hold cotton waste
on surface.
Cotton waste to be disposed off in proper
container after work