Today:- 2/3/2022
Progress Date Till:- 1/2/2022
PROGRESS REPORT
PIPING WORKS
Fabrication in In-Mtr Erection in In-Mtr Remarks
Today:-
Progress Date Till:-
Sl
MANPOWER 22-Jan 23-Jan 24-Jan 25-Jan 26-Jan
No
STAFF
1 SITE SUPERVISOR 9 8 10 10 0
2 Q.A & Q.C ENGINEER 5 3 5 5 0
3 SAFETY OFFICER 4 2 4 3 0
4 FOREMAN
5 STORE KEEPER
Sub Total 18 13 19 18 0
Manpower
1 FABRICATOR 3 2 3 2 0
2 WELDER 15 14 13 15 0
3 FITTER 15 14 14 15 0
4 GAS CUTTER 1 1 1 1 0
5 GRINDER 14 11 14 13 0
6 ELECTRICTION
7 RIGGER 59 51 56 49 0
8 HELPER 21 19 19 19 0
Sub Total 128 112 120 114 0
Total 146 125 139 132 0
27-Jan 28-Jan 29-Jan 30-Jan 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb
9 9 9 0 9 8 7
5 5 5 0 5 3 2
3 3 3 0 3 3 2
17 17 17 0 17 14 11 0 0 0
1 2 2 0 2 2 2
16 14 14 0 14 8 8
15 15 15 0 14 8 6
1 1 0 0 0 0 0
14 14 10 0 10 5 5
44 40 42 0 43 32 30
17 15 13 0 15 10 11
108 101 96 0 98 65 62 0 0 0
125 118 113 0 115 79 73 0 0 0
6-Feb 7-Feb
0 0
0 0
0 0
C/O AARTI INDUST
PROJECT NAME- GOL
DAILY PROGRESS RE
DAILY WORKS UNDER PRO
Sr. No NAME ISO No/LOOP.NO Line No. SIZE
1
8 VIJAY YADAV DRYER
2
18 KAMLESH 58 607 1
LOOP -9 1.5"
4 CHHOTE LAL KASYAP
LOOP -59 1
5 MANOJ KUMAR VESSEL PT WORK
1 MANISH LOOP 12
1 MANISH LOOP 13 1
1 MANISH LOOP 12
0.5
6 PRABHASH KUMAR DRYER
1
LOOP 13 1 9
1 MANISH KUMAR
LOOP 93 1 3
JUMPERS PATTI
5 MANOJ KUMAR WORKS
1
6 PRABHASH KUMAR DRYER
2
HANDRAILING WORK
9 VIJAY BAHADUR
1st FLOOR
HANDRAILING WORK
10 AJAY RAY 1.5
2nd FLOOR
11 DHANANJAY SINGH LOOP-74
LOOP 13 1 6
1 MANISH KUMAR
LOOP 11 10005 1 5
10004 1 4
2 SUNIL KASYAP LOOP 11
9905 1 5
JUMPERS PATTI
5 MANOJ KUMAR
WORKS
1
6 PRABHASH KUMAR DRYER
2
HANDRAILING WORK
9 VIJAY BAHADUR
3rd FLOOR
HANDRAILING WORK
10 AJAY RAY
2nd FLOOR
LOOP 13 1 6
1 MANISH KUMAR
LOOP 11 10005 1 5
10004 1 4
2 SUNIL KASYAP LOOP 11
9905 1 5
JUMPERS PATTI
5 MANOJ KUMAR WORKS
1
6 PRABHASH KUMAR DRYER
2
HANDRAILING WORK
9 VIJAY BAHADUR
3rd FLOOR
HANDRAILING WORK
10 AJAY RAY
2nd FLOOR
11 DHANANJAY SINGH LOOP-174/231/157 1 5
10005 1 8
1 MANISH KUMAR LOOP 11&13
9906 1 3
10004 1 5
HANDRAILING WORK
9 VIJAY BAHADUR
3rd FLOOR
HANDRAILING WORK
10 AJAY RAY 2nd FLOOR
10005 1 8
1 MANISH KUMAR LOOP 11&13
9906 1 3
10004 1 5
JUMPERS PATTI
5 MANOJ KUMAR
WORKS
HANDRAILING WORK
9 VIJAY BAHADUR
3rd FLOOR
2 4
3 CHHOTE LAL KASYAP LOOP NO -09 9613
1 2
LOOP NO-208 2 2
6 DHANANJAY SINGH
LOOP NO-57 1 4
7 VISHAL PANDEY FIRE LINE 6" 6 1
LOOP-79
HARENDAR
5335 1 8
PRASAD
2 SUNIL KASYAP
10110 1 2
6915 1 3
3 CHHOTE LAL KASYAP LOOP NO -09 6915 2 3
6913
FIRE LINE 6" 6
RAMDARASH
5380
BIND
4 VISHAL PANDEY
5369
5321
HANDRAILING WORK
7 UTTAM SHAHU ASHOK YADAV 1.5
GROUND & 3rd FLOOR
RTI INDUSTRIES,JHAGADIA
OJECT NAME- GOLD PIPING WORKS
LY PROGRESS REPORT (20-01-2022)
WORKS UNDER PROGRESS IN GOLD AREA
MOC ID(FITUP) ID(WELD) VALVE VALVE support
IM(ERECTION) BOXUP TYPE
CS
CS
CS
CS
CS
CS
CS
5 5
6 6
1 1
4 4
RTI INDUSTRIES,JHAGADIA
OJECT NAME- GOLD PIPING WORKS
LY PROGRESS REPORT (21-01-2022)
WORKS UNDER PROGRESS IN GOLD AREA
MOC ID(FITUP) ID(WELD) IM(ERECTION) VALVE VALVE support
BOXUP TYPE
SS 6 6 5.5
SS 4 24 3.5
SS 4.5 4.5
SS 2 2
1 1 3
RTI INDUSTRIES,JHAGADIA
OJECT NAME- GOLD PIPING WORKS
LY PROGRESS REPORT (22-01-2022)
WORKS UNDER PROGRESS IN GOLD AREA
VALVE VALVE
MOC ID(FITUP) ID(WELD) IM(ERECTION) BOXUP TYPE support
1 1 3
RTI INDUSTRIES,JHAGADIA
OJECT NAME- GOLD PIPING WORKS
LY PROGRESS REPORT (23-01-2022)
WORKS UNDER PROGRESS IN GOLD AREA
NOS OF VALVE VALVE
MOC ID(FITUP) ID(WELD) IM(ERECTION) support
JOINT BOXUP TYPE
6 6
4 4
40
12
2 2
RTI INDUSTRIES,JHAGADIA
OJECT NAME- GOLD PIPING WORKS
LY PROGRESS REPORT (24-01-2022)
WORKS UNDER PROGRESS IN GOLD AREA
MOC ID(FITUP) NOS OF ID(WELD) IM(ERECTION) VALVE VALVE support
JOINT BOXUP TYPE
2 11 13
2 2
2 2
20 60
6 2 6 36
6 2 6
18 6 36
RTI INDUSTRIES,JHAGADIA
OJECT NAME- GOLD PIPING WORKS
LY PROGRESS REPORT (25-01-2022)
WORKS UNDER PROGRESS IN GOLD AREA
NOS OF VALVE VALVE
MOC ID(FITUP) JOINT ID(WELD) IM(ERECTION) BOXUP TYPE support
9 9 9 4
3 3 3
4.5 4.5
4 4 3
INSTRUM
4 4 0.5"*2 ENT
VALVE
1.5
22.5
9 3 9
CS 12 2 12 42 1 GET VALVE
RTI INDUSTRIES,JHAGADIA
OJECT NAME- GOLD PIPING WORKS
LY PROGRESS REPORT (27-01-2022)
WORKS UNDER PROGRESS IN GOLD AREA
NOS OF VALVE VALVE
MOC ID(FITUP) ID(WELD) IM(ERECTION) support
JOINT BOXUP TYPE
6 6 6 9
5 5 5
4 4 4 12
5 5 5
4.5 4.5
4 4 3
INSTRUM
4 4 0.5"*2 ENT
VALVE
5 5 5
CS 6 1 6
CS 6 1 6
RTI INDUSTRIES,JHAGADIA
OJECT NAME- GOLD PIPING WORKS
LY PROGRESS REPORT (28-01-2022)
WORKS UNDER PROGRESS IN GOLD AREA
NOS OF VALVE VALVE
MOC ID(FITUP) ID(WELD) IM(ERECTION) support
JOINT BOXUP TYPE
6 6 6 9
5 5 5
4 4 4 12
5 5 5
4.5 4.5
4 4 3
INSTRUM
4 4 0.5"*2 ENT
VALVE
5 5 5
CS 6 1 6
CS 6 1 6
RTI INDUSTRIES,JHAGADIA
OJECT NAME- GOLD PIPING WORKS
LY PROGRESS REPORT (29-01-2022)
WORKS UNDER PROGRESS IN GOLD AREA
MOC ID(FITUP) NOS OF ID(WELD) VALVE VALVE support
IM(ERECTION) BOXUP
JOINT TYPE
8 8 8 10
3 3 3
5 5 5
4 4 4
9 9 9 BALL 1
CS 6 1 6
CS 6 1 6
CS 1.5 3 4.5 7.2
RTI INDUSTRIES,JHAGADIA
OJECT NAME- GOLD PIPING WORKS
LY PROGRESS REPORT (31-01-2022)
WORKS UNDER PROGRESS IN GOLD AREA
MOC ID(FITUP) NOS OF ID(WELD) IM(ERECTION) VALVE VALVE support
JOINT BOXUP TYPE
8 8 8 10
3 3 3
5 5 5
4 4 4
9 9 9 BALL 1
CS 6 1 6
CS 6 1 6
CS 1.5 3 4.5 7.2
RTI INDUSTRIES,JHAGADIA
OJECT NAME- GOLD PIPING WORKS
LY PROGRESS REPORT (01-02-2022)
WORKS UNDER PROGRESS IN GOLD AREA
NOS OF VALVE VALVE
MOC ID(FITUP) JOINT ID(WELD) IM(ERECTION) BOXUP TYPE support
2 2 2
8 4 8
2 2 2
11 11 11 5
4 2 4 0.15
4 4 4 5
6 1 6 46.8
RTI INDUSTRIES,JHAGADIA
OJECT NAME- GOLD PIPING WORKS
LY PROGRESS REPORT (02-02-2022)
WORKS UNDER PROGRESS IN GOLD AREA
MOC ID(FITUP) NOS OF ID(WELD) IM(ERECTION) VALVE VALVE support
JOINT BOXUP TYPE
5 5 5 1.5
SS304 8 8 8 1
2 2 2
CS 3 3 3
CS 6 3 6
34.394
SS304 6 6 6 4.5
SS304 10 10 10 10.02
CS
PROGRESS DETAILS
10 MTR HANDRAILING
FABRICATION AND ERECTION
06 MTR HANDRAILING
FABRICATION AND ERECTION
06 MTR HANDRAILING
FABRICATION AND ERECTION
06 MTR HANDRAILING
FABRICATION AND ERECTION
5 MTR HANDRAILING
FABRICATION AND ERECTION
5 MTR HANDRAILING
FABRICATION AND ERECTION
08 MTR TOE GUARD FITUP AND
WELDING
1.5" SAFETY VALVE INSTALLED-
02NOS, ISMC 75*900*200-01NOS,
PUFF SUPPORT INSTALLED-02NOS
ISMC 100*400-03NOS., SHOE
SUPPORT 02NOS
TOE GUARD FITUP AND WELDING -
925-01NOS, 900-01NOS, 800-
02NOS
ISMC 100*300-01NOS,
100*450*200-01NOS, BASE PLATE
150*150*10-01NOS, FLATE BAR
20*200-01NOS, 20*75-01NOS
PROGRESS DETAILS
PROGRESS DETAILS
HANDRAILING FABRICATION -
12MTR
SUPPORT MODIFICATION ISMC
75*1100*350-01NOS
PROGRESS DETAILS
PROGRESS DETAILS
HANDRAILING FABRICATION -
05MTR ISMC 200*3500 FOR DOOR
ERECTION GROUND FLOOR
MAINBUILDING, PLATE
300*300*16-03NOS FIXING
HANDRAILING FABRICATION -
05MTR ISMC 200*3500 FOR DOOR
ERECTION GROUND FLOOR
MAINBUILDING, PLATE
300*300*16-03NOS FIXING
PUNCH POINT ATTEND SORT BOLT
REPLACE 16*110-70NOS , RD
FIXING -02NOS, LOOP-157 PG LINE
FITUP AND WELDING
PROGRESS DETAILS
PROGRESS DETAILS
PROGRESS DETAILS
PROGRESS DETAILS
Actual