4 THE PLANNING PHASE AND THE PROJECT MANAGEMENT APPROACH

PLAN THE PLANNING THE PRELIMINARY PROJECT PLAN THE PROJECT PLAN

GENRAL SUBPHASE DESCRIPTION

This is the phase during which the This is the phase during which a This is the phase during which we
Project Manager prepares the relatively “rough” plan is developed for establish in detail, the EPCC Objectives
project Assignment Sheet (Project the project, so that we have a “rough” and basic for control (Scope, Quality,
Charter), reviews available idea what it is we have to plan. The Cost and Time) and resources. The
information and the contract, preliminary Project Planning phase details are “detailed enough” to have
establishes objectives, policies, includes activities to establish the Scope, “good” planning information. (Example:
etc. He/She reviews these with the Quality, Cost, Time, Resources, but as Work and Manpower control planning is
Chiefs of Disciplines, and the said before, in a “rough” or preliminary come from the “second level” on
Project Key Managers. He plans way. Preliminary Engineering has to be upwards during this phase. The “first
how he wants to accomplish the done. level” details, like listing each drawing,
two following sub phases, or each specification can be done to a
establishes a budget for it, selects large degree “just before” the actual
key people for the project and design and crafting activities start).
arranges for the project Panel
Review. If the resulting Preliminary Project Plan The degree of detail required depends on
shows that any of the Project Objectives the size of the project, the importance of
or Resources required are not acceptable the portion under consideration, the depth
we have to re-do our preliminary of information available, and most
planning until we are “in the ball park”. important, the degree of the control
After the necessary approvals we can go required. The closer the control of any
to the next sub-phase, to the actual portion, the greater the detail required for
project planning planning and subsequent monitoring.

ESSENTIAL ACTIVITIES

1. PRELIMINARY SCOPE DEFINITION 1. EVALUATING THE PROJECT PANEL REVIEW


1. PREREQUISITES
 Scope of the work (facility) 2. COMPLETE SCOPE DEFINITION
2. BASICS
3. COMPLETE PRELIMINARY DESIGN
 Scope of the services
3. FAMILIARIZATION
4. COMPLETE PROJECT INSTRUCTIONS
4. PRELIMINARY BUDGET FOR (PROJECT PLAN)
PLANNING PHASES 2. PRELIMINARY ENGINEERING PART 1 5. FINALIZE PROJECT ORGANIZATION
5. SELECTION OF KEY PEOPLE, 3. INITIAL SITE INVESTIGATION 6. FINALIZE PROJECT WORK BREAKDOWN
STAFFING
4. INITIAL LOCAL INVESTIGATION 7. FINALIZE PACKAGES
6. DATA COLLECTION AND
PLANNING FOR PLANNING 8. FINALIZE PROJECT CODING
5. PRELIMINARY DESIGN CRITERIA
MEETING 9. UPDATE WORK AND MANPOWER CONTROL
6. ESTABLISH CONTROL SYSTEMS TO BE
7. DEVELOPING THE PLAN USED 10. DEFINITIVE ESTIMATE ASSEMBLY

8. PROJECT PANEL REVIEW 7. PROJECT INSTRUCTIONS – Initial 11. SITE MANPOWER AND LEVELING
issue/updates
12. UPDATE NETWORK PLAN
8. ESTABLISH RESOURCES REQUIRED 13. DEFINITIVE ESTIMATE REVIEWS
AND SOURCES
14. UPDATE SERVICE BUDGET
9. INTIAL PROJECT ORGANIZATION
CHART 15. CASH FLOW PLAN

10. UPDATE PRELIMINARY SCOPE 16. DEFINITIVE CAPITAL AND COMMISSIONING


ESTIMATES
11. PRELIMINARY PROJECT WORK
17. PROJECT PANEL REVIEW
BREAKDOWN STRUCTURE AND
PACKAGES

12. PRELIKMINARY MILESTONE


SCHEDULE

13. PRELIMINARY MASTER NETWORK


AND SCHEDULE

14. PRELIMINARY CAPITAL COST


ESTIMATE