Contents
1. Introduction
3. Loads
5. Cooling System
1. Introduction
This guide outlines the general design requirements that should be considered for generator
systems including gas turbine or diesel sets, and base load or standby operation. It does not
outline the requirements for Combined Heat & Power installations.
2.1. Where it is deemed necessary for a building/facility to be provided with standby generation,
the design and installation should be efficient, cost effective and suitable for the operations
undertaken within the building. The selection should be based on the following general criteria:
• for loads in excess of 1.5 MVA considerations should be given to generation at HV
• For sites with multiple buildings consideration should be given to locating generators either at
each building or centrally and distributing to each building.
1
• Base load generation should be considered where: - o For Greenfield sites the mains electrical
supply is either unavailable or uneconomic to install o Additional supply security is required o
Mains supply is of poor quality o Base load is high enabling generators to run efficiently
2.2. The selection of either diesel or gas turbines should be considered with respect to: -
• Size of load
• Availability of fuel
• Load steps
2.3. Consideration should be given to the location of generators with regard to: -
• Fuel supplies
• Installation constraints
2.4. Consideration should be given to the environment and operating conditions i.e.: -
• Ambient temperature
• Humidity
• Altitude
2
2.5. The system must be arranged for safe operation under normal and maintenance
operations.
2.6. The output from the generator should generally comply with the following tolerances: -
• Voltage tolerance (steady state): + 2.5% • Frequency tolerance (steady state): + 1% • Voltage
output should be sinusoidal with no more than 2.5% total harmonic content. 2.7. Consideration
should be given to the transient output voltage and frequency limits and tolerances with respect
to the type of load supplied
3. Loads
• Non-linear loads including UPS, variable speed controllers, PC’s, discharge lighting, etc.
• Voltage drop with regard to motor starting currents and the effect on other connected loads
• Ambient conditions
3
4.2. Where generator sets are run in parallel consideration should be given to the following: -
• The preferred control philosophy is for the duty set to start and accept load (a load step
controller may be required to prevent overloading). The standby set will then start and
synchronizes with the duty set and accept the remaining load.
• Where it is not possible to achieve the above, both sets should start concurrently,
synchronizes and then accept load.
• Circulating currents should be eliminated, e.g. by ensuring only one generator neutral is
earthed.
4.3. Where generator sets are run in parallel with the mains, consideration should be given to: -
• Means should be provided to trip the generator in the event of a mains failure whilst in
parallel with the generator. The preferred method is by use of a ROCOF relay. (Rate of Change of
Frequency)
4.4. Power factor correction capacitors, where provided, should be switched out of circuit prior
to the generator starting.
4.5. Either the generator vendor or the switch panel vendor should be designated to take the
lead to ensure that signals are correctly interfaced.
4.6. Where UPS loads are supplied via a generator suitable time delays, as necessary, should be
incorporated into the changeover circuit to allow the UPS to synchronize with the mains supply
upon mains restoration.
4
4.7. A generator control panel should be provided to house all control and protection
equipment. The following control switches should be provided: -
• Frequency meter.
• KW Meter.
• Hours-run recorder.
• Battery Voltmeter.
4.9. The generator must be protected against faults, the selection being based upon generator
rating and whether sets are standalone or run in parallel. Upon occurrence of any of the typical
faults listed below the engine should automatically shutdown, individual fault indication be
provided on the control panel together with audible alarm, manual reset and common fault
volt-free contacts provided for remote indication.
• Over current
5
• Over-voltage
• Over speed
• Reverse Power
• Under-voltage
• Over-temperature
• Fire Shutdown.
• Emergency Stop.
4.10. Upon occurrence of any of the typical alarms listed below individual alarm indication
should be provided on the control panel together with audible alarm, automatic reset on
correction of the fault, and common alarm volt-free contacts provided for remote indication.
• Systems normal.
6
5. Cooling System
5.1. The engine should be provided with an efficient radiator cooling system capable of meeting
the water and lubricating oil requirements of the engine on continuous full load and for one
hour at 10% overload under the local climatic conditions for standby sets.
5.2. Thermostatically controlled engine water jacket immersion heaters should be provided to
prevent freezing and to aid starting.
6.1. All fuel and lubricating oils used should be in accordance with the Manufacturer's
recommendations.
6.2. A daily service tank with sufficient capacity (to allow for reasonable filling during full load
running) should be located near the diesel alternator. The location should be suitable for easy
access for re-filling. Where required bulk fuel storage should be arranged at a central point, or
points. The tanks should be provided with a bund to take 110% of the tank capacity in overflow.
Consideration should be given to frost protection of the tank and pipelines and the provision of
a sunscreen around the tanks. Tanks should not be installed underground.
6.4. The engine should be totally enclosed with forced lubrication from an integral mechanical
engine driven pump. Manual lubrication of any part of the engine should not be required. The
capacity of the lubricating oil system should be sufficient to allow the engine to run for a
minimum of 24 hours at any load, without the need for replenishment.