Professional Documents
Culture Documents
School Closures
200065 Humber Elementary will close. Grade K-6 students who would have gone to
Humber Elementary will attend Eastside Elementary (200498).
200070 St. Gerard’s Elementary will close. Grade K-6 students who would have gone to
St. Gerard’s Elementary will attend Eastside Elementary (200498).
School Opening
200498 Eastside Elementary (K-6) will open in September 2017. Grade K-6 students
who would have gone to Humber Elementary (200065) and Grade K-6 students who
would have gone to St. Gerard’s Elementary (200070) will attend Eastside Elementary
(200498). Address: St. Johns Avenue, Corner Brook, NL A2H 2E5
Note: Eastside Elementary is a combined elementary school housed at the former G.C.
Rowe Junior High building.
School Reconfiguration
300417 Gander Academy will become a K-3 effective September 2017. Grades 4-6
students that would have attended Gander Academy will attend Gander
Elementary(300495)
School Closures
400364 Virginia Park Elementary K-6 students will move to a new building, East Point
Elementary (400364) and will retain the same population that would have attended
Virginia Park Elementary.
School Reconfigurations
400320 Beachy Cove Elementary is reconfigured from a K-6 to a K-4 school. Grades 5
and 6 students that would have attended Beachy Cove Elementary will attend the new
Portugal Cove-St. Philip’s Intermediate school in September 2017.
400334 Larkhall Academy is reconfigured from a K-6 to a K-5 school. Grade 6 students
who would have attended Larkhall Academy will attend Leary’s Brook Junior High
(400335) in September 2017. Larkhall Academy also has a catchment zone reduction,
with a section of the Old Penneywell Road area rezoned from Larkhall Academy to St.
Andrew’s Elementary (400349).
400349 St. Andrew’s Elementary is reconfigured from a K-6 to a K-5 school. Grade 6
students who would have attended St. Andrew’s Elementary attend Leary’s Brook Junior
High (400335) instead. St. Andrew’s Elementary also has a catchment change, with a
section of the Old Penneywell Road area rezoned from Larkhall Academy (400334) to St.
Andrew’s Elementary.
400303 St. Edward’s Elementary has a reduced catchment with a portion of the
catchment rezoned to the new CBS K-7 school.
400371 Upper Gullies Elementary has a reduced catchment with a portion of the
catchment rezoned to the new CBS K-7 school.
School Openings
400364 East Point Elementary will open in September 2017. Grade K-6 students who
would have attended Virginia Park Elementary (400364) will attend East Point
Elementary instead.
400496 Brookside Intermediate (5-9) is expected to open in September 2017. Grade 5 and
6 students that would have attended Beachy Cove Elementary (400320) will attend
Brookside Intermediate in September 2017. Grade 7-9 students that reside in the Beachy
Cove Elementary catchment who would have attended Leary’s Brook Junior High will
attend Brookside Intermediate in September 2017.
Address: 835 Conception Bay Highway , Conception Bay South, NL, A1X 7T4
School Reconfigurations
500460 École des Grand Vents will be reconfigured from a K-12 to a K-6 school. Grades
7-12 students that would have attended École des Grand Vents will attend École
intermédiaire et secondaire de St. Jean (7-12).