You are on page 1of 2

23A A project schedule has the following characteristics as shown in Table given below

Activity Nam Time Activit Name Tim


e (days) y e
(da
ys)
1-2 A 4 5-6 G 4
1-3 B 1 5-7 H 8
2-4 C 1 6-8 I 1
3-4 D 1 7-8 J 2
3-5 E 6 8-10 K 5
4-9 F 5 9-10 L 7
1. Compute Te and TL for each activity.
2. Find the critical path.
3. Calculate the project duration.

23A A project schedule has the following characteristics as shown in Table given below

Activity Nam Time Activit Name Tim


e (days) y e
(da
ys)
1-2 A 4 5-6 G 4
1-3 B 1 5-7 H 8
2-4 C 1 6-8 I 1
3-4 D 1 7-8 J 2
3-5 E 6 8-10 K 5
4-9 F 5 9-10 L 7
1. Compute Te and TL for each activity.
2. Find the critical path.
3. Calculate the project duration.

24A R and D project has a list of tasks to be performed whose time estimates are given in the
table. Draw the network diagram for the R&D project.

Activity Activ Time Time Time


ity (da (da (da
name ys) ys) ys)
To Tm TP
1-2 A 4 6 8
1-3 B 2 3 10
1-4 C 6 8 16
2-4 D 1 2 3
3-4 E 6 7 8
3-5 F 6 7 14
4-6 G 3 5 7
4-7 H 4 11 12
5-7 I 2 4 6
6-7 J 2 9 10

24A R and D project has a list of tasks to be performed whose time estimates are given in the
table. Draw the network diagram for the R&D project.

Activity Activ Time Time Time


ity (da (da (da
name ys) ys) ys)
To Tm TP
1-2 A 4 6 8
1-3 B 2 3 10
1-4 C 6 8 16
2-4 D 1 2 3
3-4 E 6 7 8
3-5 F 6 7 14
4-6 G 3 5 7
4-7 H 4 11 12
5-7 I 2 4 6
6-7 J 2 9 10