RAB GUDANG GUNUNG SINDUR

NO URAIAN Q'TY EQUIPMENT INSTALL JUMLAH KETERANGAN


E TATA UDARA
Lantai 1
Peralatan Utama AHU 1.00 unit - - - -
Type DX Coll
Caps : 125.000 BTUH
Air Flow : 5.000 cfm
Static Press : 750 Pa
Vol Dumper : Manual, In, Out, Fresh Air
Type Outdoor : Air Cooled Condenser

Air Filter
Pre Filter + Housing built in) G4 size 24" x 24" 1.00 set - - - -
Medium Filter + Housing built in) FB size 24" x 24" 1.00 - - - -

Accessories
Diffrential Pressure Gauge u/Medium Filter terkalibrasi type
@Medium Filter 1.00 set - - - -
@Ruangan 17.00 - - - -

Heater Kap 1 kW 2.00 pcs - - - -


- - - -
Peralatan Utama AC Single Split - - - -
Type : Single Split 3.00 unit - - - -
Caps : 24.000 BTUH - - - -
Area : Ruang kemas Sekunder - - - -
c/w Pipa Refrigrant, Pipa Drain, Kabel Power - - - -
- - - -
Type : Single Split 1.00 unit - - - -
Caps : 18.000 BTUH - - - -
Area : Ruang Resepsionis - - - -
c/w Pipa Refrigrant, Pipa Drain, Kabel Power - - - -
- - - -
Type : Single Split 4.00 unit - - - -
Caps : 12.000 BTUH - - - -
Area : Ruang Gudang bahan baku & Bahan Kemas - - - -
c/w Pipa Refrigrant, Pipa Drain, Kabel Power - - - -
- - - -
Type : Single Split 2.00 unit - - - -
Caps : 7.000 BTUH - - - -
Area : Ruang Labeling & Karantina - - - -
c/w Pipa Refrigrant, Pipa Drain, Kabel Power - - - -
- - - -
Peralatan Utama Exhaust Fan - - - -
Type : Wall 2.00 unit - - - -
Caps : 100 cfm - - - -
Area : Toilet - - - -
- - - -
Type : Ceiling 1.00 unit - - - -
Caps : 100 cfm - - - -
Area : Water Filtration Plan - - - -
- - - -
Type : Ceiling 1.00 unit - - - -
Caps : 150 cfm - - - -
Area : Ruang Cuci - - - -
- - - -
Type : Wall 2.00 unit - - - -
Caps : 275 cfm - - - -
Area : Ruang Compressed Air - - - -
- - - -
Type : Wall 1.00 unit - - - -
Caps : 200 cfm - - - -
Area : Ruang Elektrik - - - -
- - - -
Type : Wall 2.00 unit - - - -
Caps : 150 cfm - - - -
Area : Ruang Genset - - - -
- - - -
Type : In line Duct 2.00 unit - - - -
Caps : 500 cfm - - - -
Area : Toilet - - - -
- - - -
Pekerjaan Instalasi - - - -
Instalasi Ducting - - - -
Ducting Supply & Return bahan BJLS dengan insulasi bahan - - - -
PE Dencity 0,025g/cm2 thick 15 mm, almunium tape, hanger, accessories - - - -
BJLS 50 116.00 m - - - -
BJLS 60 59.00 m - - - -
BJLS 80 35.00 m - - - -
- - - -
Supply Air Diffuser + Power Coating - - - -
300 x 300 11.00 pcs - - - -
250 x 250 9.00 pcs - - - -
- - - -
Return Air Grill + Powder Coating 5.00 pcs - - - -
400 x 300 11.00 pcs - - - -
250 x 250 - - - -
- - - -
Louver + Powder Coating c/w insect screen 1.00 pc - - - -
350 x 350 - - - -
- - - -
Volume Dumper - - - -
300 x 300 1.00 pcs - - - -
250 x 250 3.00 pcs - - - -
NO URAIAN Q'TY EQUIPMENT INSTALL JUMLAH KETERANGAN
250 x 200 1.00 pcs - - - -
200 x200 8.00 pcs - - - -
200 x 150 24.00 pcs - - - -
- - - -
Pemipaan AHU - - - -
Pipa Tembaga 5/8 x 1 3/8 c/w isolasi 19 mm 50.00 m - - - -
Pipa Drain PVC c/w insulasi 19 mm 1.00 ls - - - -
- - - -
Lantai 2 - - - -
Peralatan Utama AHU - - - -
Type DX Coll 1.00 unit - - - -
Caps : 75.000 BTUH - - - -
Air Flow : 1.800 cfm - - - -
Static Press : 750 Pa - - - -
Vol Dumper : Manual, In, Out, Fresh Air - - - -
Type Outdoor : Air Cooled Condenser - - - -
- - - -
Type DX Coll 1.00 unit - - - -
Caps : 60.000 BTUH - - - -
Air Flow : 3.000 cfm - - - -
Static Press : 750 Pa - - - -
Vol Dumper : Manual, In, Out, Fresh Air - - - -
Type Outdoor : Air Cooled Condenser - - - -
- - - -
Air Filter - - - -
Pre Filter + Housing built in) G4 size 24" x 24" 2.00 set - - - -
Medium Filter + Housing built in) F8 size 24" x 24" 2.00 set - - - -
- - - -
Accessories - - - -
Diffrential Pressure Gauge u/Medium Filter terkalibrasi type - - - -
@Medium Filter 2.00 set - - - -
@Ruangan 6.00 set - - - -
- - - -
Peralatan Utama AC Single Split - - - -
Type : Single Split 5.00 unit - - - -
Caps : 18.000 BTUH - - - -
Area : Ruang Lab Fisika. Lab Kimia & R Rapat - - - -
c/w Pipa Refrigrant, Pipa Drain, Kabel Power - - - -
- - - -
Type : Single Split 1.00 unit - - - -
Caps : 12.000 BTUH - - - -
Area : Ruang Manager - - - -
c/w Pipa Refrigrant, Pipa Drain, Kabel Power - - - -
- - - -
Type : Single Split 4.00 unit - - - -
Caps : 9.000 BTUH - - - -
Area : Ruang Musholla & Office - - - -
c/w Pipa Refrigrant, Pipa Drain, Kabel Power - - - -
- - - -
Peralatan Utama Exhaust Fan - - - -
Type : Wall 3.00 unit - - - -
Caps : 100 cfm - - - -
Area : Toilet Pria & Wanita - - - -
- - - -
Type : Wall 1.00 unit - - - -
Caps : 100 cfm - - - -
Area : Tempat Wudhu - - - -
- - - -
Type : Wall 1.00 unit - - - -
Caps : 150 cfm - - - -
Area : Musholla - - - -
- - - -
Pekerjaan Instalasi - - - -
Instalasi Ducting - - - -
Ducting Supply & Return bahan BJLS dengan insulasi bahan - - - -
PE Dencity 0,025g/cm2 thick 15 mm, almunium tape, hanger, accessories - - - -
BJLS 50 79.00 m - - - -
BJLS 60 32.00 m - - - -
- - - -
Supply Air Diffuser + Power Coating - - - -
300 x 300 12.00 pcs - - - -
250 x 250 3.00 pcs - - - -
- - - -
Return Air Grill + Powder Coating - - - -
400 x 300 2.00 pcs - - - -
250 x 250 3.00 pcs - - - -
- - - -
Louver + Powder Coating c/w insect screen 1.00 pcs - - - -
350 x 350 - - - -
- - - -
Volume Dumper - - - -
300 x 300 1.00 pcs - - - -
300 x 250 1.00 pcs - - - -
250 x200 12.00 pcs - - - -
200 x 150 6.00 pcs - - - -
- - - -
Pemipaan AHU - - - -
Pipa Tembaga 5/8 x 1 1/8 c/w isolasi 19 mm 30.00 m - - - -
Pipa Tembaga 1/2 x 3/4 c/w isolasi 19 mm 35.00 m - - - -
Pipa Drain PVC c/w insulasi 19 mm 1.00 ls - - - -

JUMLAH - - -
RAB GUDANG GUNUNG SINDUR

NO URAIAN Q'TY EQUIPMENT INSTALL JUMLAH


H PEK. COMPRESSOR UDARA
Peralatan Utama
Oil Free Air Compressed 5,5 kW 1.00 unit
Caps : 0,6 m3/min
Working Pressure : 8 bar
Rating 3 phase, 50 Hz, 220/380 V

Tangki penampung Udara Caps 0,5 m3 1.00 set


Stainless Steel 304 + Pressure Gauge + Safety Valve
Izin Depnaker

Prefiltter 3.00 pcs


Filter : general Purpose Protection
Caps 0,6 m3/min @ 1 micron ex Festo / setara

Refrigerated Dryer 1.00 unit


Caps 0,6 m3/min

After Filter 2.00 pcs


Filter : High Efficiency Oil Removal Filtration
Caps 0,6 m3/min @ 1 micron ex Festo / setara

Final Filter Active Carbon 2.00 pcs


Filter : Oil Vapor and Odour Removal
Max remaining Oil Content of <0,003 mg/m3
Caps 0,6 m3/min @ 1 micron ex Festo / setara

Pekerjaan Pondasi dudukan Compressor 1.00 lot


Testing & Commisssioning dan uji instalasi 1.00 lot

Pek. Pemipaan & Accessoiries


SS 304 stainless steel 1 1/2" seamless ex China 3.00 m
SS 304 stainless steel 3/4" seamless ex China 58.00 m
SS 304 stainless steel 1/2" seamless ex China 66.00 m
Ball Valve 3/4" SS 304 ex China 2.00 pcs
Ball Valve 1/2" SS 304 ex China 19.00 pcs
Pressure Gauge 10 bar c/w sertifikat kalibarasi 5.00 pcs
Safety Valve 1/2" SS 304 ex China 1.00 pcs
Flexible Hose 1/2" SS 304 ex China 1.00 pcs
Water Mur 1/2" SS 304 ex China 5.00 pcs
Fitting & material bantu 1.00 lot

JUMLAH - - -
RAB GUDANG GUNUNG SINDUR
NO URAIAN Q'TY EQUIPMENT INSTALL JUMLAH KETERANGAN
F PEK. ELEKTRIKAL, PANEL & PENANGKAL PETIR
Pekerjaan Penyambungan Listrik PLN
Biaya Penyambungan 1.00 lot - - -
Biaya Jaminan Listrik 1.00 lot - - -
Biaya Lain-lain 1.00 lot - - -
- -
Pekerjaan Listrik Arus Kuat - -
Pekerjaan panel-panel - - -
MV Panel 1.00 unit - - -
Travo 315kVA 1.00 unit - - -
Panel LV MDP 1.00 unit - - -
Capasitor Bank Caps. 200 kVAr 6 step 1.00 unit - - -
Step 1-4 Cap 30 kVar - -
Step 5-6 Cap 40 kVar - -
- -
PP Compressor 1.00 unit - - -
PP HVAC Lantai 1 1.00 unit - - -
PP Lantai 1 1.00 unit - - -
PP HVAC lantai 2 1.00 unit - - -
PP Lantai 2 1.00 unit - - -
PP WTP 1.00 unit - - -
- -
Pekerjaan Kabel Feeder - -
Kabel N2XSEFGBY 3 x 240 Panel PTM 50.00 m - - - Dari PLN ke Panel PTM
Kabel N2XSY 3 x (1 x 120) 13.00 m - - - Dari PTM ke Travo
Kabel NYY 2 x (4 x 1c x 120) 16.00 m - - - Dari Travo ke LVMDP
Kabel NYA 120 mm2 25.00 m - - -
Kabel NYYHY 4 X 70 + NYAF 35mm2 36.00 m - - - Dari LVMDP ke PP lantai 1
Kabel NYYHY 4 x 50 + NYAF 25mm2 30.00 m - - - Dari LVMDP ke PP HVAC Lt2
Kabel NYYHY 4 x 35 + NYAF 25mm2 32.00 m - - - Dari LVMDP ke PP HVAC Lt1
Kabel NYYHY 4 x 25 + NYAF 16mm2 20.00 m - - - Dari LVMDP ke PP lantai 2
Kabel NYYHY 4 x 4 + NYAF 2,5mm2 61.00 m - - - Dari LVMDP ke PP WTP
Kabel NYYHY 4 x 4 + NYAF 2,5mm2 150.00 m - - - Dari LVMDP ke PP WWTP
Kabel NYYHY 4 x 4 + NYAF 2,5mm2 28.00 m - - - Dari LVMDP ke PP Compressor
- -
Kabel NYYHY 4 x 16 c/w Conduit PVC HI 20 mm 49.00 m - - - Dari PP Lt 1 ke Ruang Ekstrak
Kabel NYYHY 4 x 10 c/w Conduit PVC HI 20 mm 24.00 m - - - Dari PP Lt 1 ke Ruang Oven
Kabel NYYHY 4 x 10 c/w Conduit PVC HI 20 mm 33.00 m - - - Dari PP Lt 1 ke R. Mixing Ekstrak
Kabel NYYHY 4 x 10 c/w Conduit PVC HI 20 mm 26.00 m - - - Dari PP Lt 1 ke R Filling
Kabel NYYHY 4 x 4 c/w Conduit PVC HI 20 mm 30.00 m - - - Dari PP Lt 1 ke R kemas Sekunder
Kabel NYYHY 4 x 2,5 c/w Conduit PVC HI 20 mm 31.00 m - - - Dari PP Lt 1 ke R labeling
- -
Kabel NYYHY 4 x 4 c/w Conduit PVC HI 20 mm 58.00 m - - - Dari PP Lt2 ke R Lab Fisika & Kimia
Kabel NYYHY 4 x 4 c/w Conduit PVC HI 20 mm 28.00 m - - - Dari PP Lt2 ke Lab Microbiologi
- -
Kabel NYY 2 x (4 x 1c x 120 mm2) 22.00 m - - - Dari Genset ke LVMDP
Kabel BC 1c x 120 mm2 22.00 m - - -
- -
Kabel NYYHY 4 x 2,5 35.00 m - - - Dari PKG ke LVMDP
- -
Kabel HVAC - -
Kabel NYYHY 4 x 10 mm 47.00 m - - - Dari PP HVAC Lt 1 ke Outdoor AHU 1.1
Kabel NYYHY 4 x 4 mm 26.00 m - - - Dari PP HVAC Lt 1 ke Fan AHU 1.1
Kabel NYYHY 3 x 2,5 c/w Conduit PVC HI 20 mm 26.00 m - - - Dari PP HVAC Lt 1 ke Heater A AHU 1.1
Kabel NYYHY 3 x 2,5 c/w Conduit PVC HI 20 mm 26.00 m - - - Dari PP HVAC Lt 1 ke Heater B AHU 1.1
Kabel NYYHY 3 x 2,5 + NYYHY 3 x 1,5 c/w Conduit PVC HI 52.00 m - - - Dari PP HVAC Lt 1 ke AC 2,5 PK
Kabel NYYHY 3 x 2,5 + NYYHY 3 x 1,5 c/w Conduit PVC HI 20.00 m - - - Dari PP HVAC Lt 1 ke AC 2 PK
Kabel NYYHY 3 x 2,5 + NYYHY 3 x 1,5 c/w Conduit PVC HI 70.00 m - - - Dari PP HVAC Lt 1 ke AC 1,5 PK
Kabel NYYHY 3 x 2,5 + NYYHY 3 x 1,5 c/w Conduit PVC HI 35.00 m - - - Dari PP HVAC Lt 1 ke AC 0,75 PK
Kabel NYYHY 3 x 2,5 c/w Conduit PVC HI 20 mm 35.00 m - - - Dari PP HVAC Lt 1 ke Exhaust 1
Kabel NYYHY 3 x 2,5 c/w Conduit PVC HI 20 mm 45.00 m - - - Dari PP HVAC Lt 1 ke Exhaust 2
Kabel NYYHY 3 x 2,5 c/w Conduit PVC HI 20 mm 45.00 m - - - Dari PP HVAC Lt 1 ke Exhaust 3
Kabel NYYHY 3 x 2,5 c/w Conduit PVC HI 20 mm 40.00 m - - - Dari PP HVAC Lt 1 ke Exhaust 4
- -
Kabel NYYHY 4 x 4 mm 31.00 m - - - Dari PP HVAC Lt 2 ke Outdoor AHU 2.1
Kabel NYYHY 4 x 2,5 mm 28.00 m - - - Dari PP HVAC Lt 2 ke Fan AHU 2.1
Kabel NYYHY 3 x 2,5 + NYYHY 3 x 1,5 c/w Conduit PVC HI 28.00 m - - - Dari PP HVAC Lt 2 ke Heater A AHU 2.1
Kabel NYYHY 3 x 2,5 + NYYHY 3 x 1,5 c/w Conduit PVC HI 28.00 m - - - Dari PP HVAC Lt 2 ke Heater B AHU 2.1
Kabel NYYHY 4 x 4 mm 32.00 m - - - Dari PP HVAC Lt 2 ke Outdoor AHU 2.2
Kabel NYYHY 4 x 2,5 mm 27.00 m - - - Dari PP HVAC Lt 2 ke Fan AHU 2.2
Kabel NYYHY 3 x 2,5 + NYYHY 3 x 1,5 c/w Conduit PVC HI 27.00 m - - - Dari PP HVAC Lt 2 ke Heater A AHU 2.2
Kabel NYYHY 3 x 2,5 + NYYHY 3 x 1,5 c/w Conduit PVC HI 27.00 m - - - Dari PP HVAC Lt 2 ke Heater B AHU 2.2
Kabel NYYHY 3 x 2,5 + NYYHY 3 x 1,5 c/w Conduit PVC HI 85.00 m - - - Dari PP HVAC Lt 2 ke AC 2 PK
Kabel NYYHY 3 x 2,5 + NYYHY 3 x 1,5 c/w Conduit PVC HI 85.00 m - - - Dari PP HVAC Lt 2 ke AC 1 PK
Kabel NYYHY 3 x 2,5 c/w Conduit PVC HI 20 mm 40.00 m - - - Dari PP HVAC Lt 2 ke Exhaust 1
Kabel NYYHY 3 x 2,5 c/w Conduit PVC HI 20 mm 45.00 m - - - Dari PP HVAC Lt 2 ke Exhaust 2
Kabel NYYHY 3 x 2,5 c/w Conduit PVC HI 20 mm 45.00 m - - - Dari PP HVAC Lt 2 ke Exhaust 3
- -
Kabel Tray - -
Kabel Tray 300 x 100 470.00 m - - -
- -
Genset - -
Genset 250 kVA - Silent 1.00 unit - - - c/w Panel PKG
Tangki Solar Caps 500 ltr 1.00 unit - - - c/w manhole, inlet, outlet, valve, pipa
Pipa Exhaust dari Silencer residential 1.00 ls - - - c/w hanger
Pompa Solar Tangan 1.00 pc - - -
NYA 1 x 95 mm2 grounding 1.00 ls - - -
Testing & Commissioning 1.00 ls - - -
- -
PENTANAHAN & PENANGKAL PETIR - -
NO URAIAN Q'TY EQUIPMENT INSTALL JUMLAH KETERANGAN
Grounding Gardu PLN 1.00 ls - - -
Instalasi Kabel BC 120 mm - 20 m - -
Grounding Rod 5/8" c/w clamp 4 btg @ 4 m - -
Galian dan Bak Kontrol 400x400x400 - -
- -
Grounding PTM dan Trafo 1.00 ls - - -
Instalasi Kabel BC 120 mm - 20 m - -
Grounding Rod 5/8" c/w clamp 4 btg @ 4 m - -
Galian dan Bak Kontrol 400x400x400 - -
- -
Grounding Netral Travo 1.00 ls - - -
Instalasi Kabel BC 95 mm - 20 m - -
Grounding Rod 5/8" c/w clamp 4 btg @ 4 m - -
Galian dan Bak Kontrol 400x400x400 - -
- -
Grounding Genset 1.00 ls - - -
Instalasi Kabel BC 120 mm - 20 m - -
Grounding Rod 5/8" c/w clamp 4 btg @ 4 m - -
Galian dan Bak Kontrol 400x400x400 - -
- -
Grounding LVMDP 1.00 ls - - -
Instalasi Kabel BC 120 mm - 20 m - -
Grounding Rod 5/8" c/w clamp 4 btg @ 4 m - -
Galian dan Bak Kontrol 400x400x400 - -
- -
Grounding Penangkal Petir 1.00 ls - - -
Instalasi Kabel BC 70 mm - 20 m - -
Grounding Rod 5/8" c/w clamp 4 btg @ 4 m - -
Galian dan Bak Kontrol 400x400x400 - -
Pedestal Pondasi 400x400x150 - -
Penangkal Petir Elektrostatis R60-80m - -
- -
PEKERJAAN LAMPU - -
Lampu & Stop Kontak - -
Lantai 1 - -
Downlight 24 watt 11.00 pc - - -
Clean Room 2 x 18 W 38.00 pc - - -
Clean Room 1 x 18 W 15.00 pc - - -
PJU 100W 7.00 pc - - -
Emergency 2 x 18 W 8.00 pc - - -
Emergency 1 x 18 W 1.00 pc - - -
TL 1 x 36 W 11.00 pc - - -
Saklar Ganda 5.00 pc - - -
Saklar Tunggal 25.00 pc - - -
Stop Kontak Dinding 1 ph 34.00 pc - - -
Titik Nyala Lampu Kabel NYM 3 x 2,5 c/w conduit PVC HI 2 75.00 pc - - -
Titik Nyala Stop Kontak Kabel NYM 3 x 2,5 c/w conduit PVC 34.00 pc - - -
Titik Nyala Saklar Kabel NYM 3 x 2,5 c/w conduit PVC HI 2 30.00 pc - - -
- -
Lantai 2 - -
Downlight 24 watt 54.00 pc - - -
Clean Room 2 x 18 W 18.00 pc - - -
Clean Room 1 x 18 W 2.00 pc - - -
Explosion Proof 1 x 18 W 7.00 pc - - -
Emergency 2 x 18 W 6.00 pc - - -
Emergency 1 x 18 W 1.00 pc - - -
Saklar Ganda 7.00 pc - - -
Saklar Tunggal 4.00 pc - - -
Stop Kontak Dinding 1 ph 28.00 pc - - -
Titik Nyala Lampu Kabel NYM 3 x 2,5 c/w conduit PVC HI 2 81.00 pc - - -
Titik Nyala Stop Kontak Kabel NYM 3 x 2,5 c/w conduit PVC 28.00 pc - - -
Titik Nyala Saklar Kabel NYM 3 x 2,5 c/w conduit PVC HI 2 11.00 pc - - -
- -
Testing & Commissioning 1.00 ls - - -
- -
JUMLAH - - -