FACILITY/EASEMENT RIGHTS ON
TERMS FOR PERMITTING WAY LEAVE 576
AGREEMENT OF 01-04-2016 TO 31-0:-2025
AMEWAYLANS HoR THEPERIOD OF TEN YEARSie FROM100mm dia. for OFC crossing at
GF'6i mm
for GAS &
dia. API Carrier pipe between station
324 Km.396/20-22
Proposed NRG-SQQ &
between station
Km.401/15-17(Km.401.441) GAIL (India) Ltd, Gas
line for General Manager (Con)
KIS-SQQ on NRG- TLHR branch Dy Bhuaneswar-752101(By
HDD
herein contained.
understood by the Permittee that irrespective of the permission, the Railway will
That it is distinctly
of access, inspection and control over the use & disposal of the
retain full legal title, ownership. rights
land hereby temporarily permitted to be used and that the permission for way leave facility will only
Permittor.
4. Permission of way leave facility shall not confer upon the Permittee any right of possessionof
and interest for
Occupation of land and without in any way affecting the Railway's title, possession
use of land
In the event of way leave facility being discontinued with for any reasons whatsoever, Railway will
5
neither be liable to pay any compensation nor reimburse any amount nor provide any alternative
arrangement for access etc. to the Permittee. In such a case any installations of pipe line raised by
6 The above way leave facility should not infringe the Railways safety, security etc.
7 Provision should be kept for revision of way leave charges from time to time as per guidelines of
Railway Board.
8 The above way leave permission may be terminated by the Railway at any time without assigning any
reason thereof.
9 Railway Board's instructions vide letter No.97/LML/24/3 dtd. 27.11.01& 16.11.05, 03-10-02,16-11-05
and advance correction slip No 47 for Engineering code para No. 1033 and circulated by Railway
Board vide letter No. 97/LML/24/3 dtd 24-04-2014 for granting way leave facility/easement right being
12 Railway Boards Guide lines regarding Safety/Security are to be followed by the Permittee.
Page 2 of 7
14 That, the Railway reserves the right to use the strip of land for
collection of materials,
movement of
vehicles & all other purposes without any notice to the Permittee
Proposed 324mm dia. API Carrier pipe for GAS & 100mm dia. for OFC
crossing at
Km.401/15-17(Km.401.441) between station NRG-SQQ & Km.396/20-22 between
station
KIS-SQQ on NRG- TLHR branch line for Dy General
Manager (Con) (India) Ltd, GAIL
Gas Pipe line Project Office, 612,Utkal sugnature,Pahal,
HDD Method)
NH-5,Bhuaneswar-752101(By
That, the way leave/ Easement right on / across/ over/ under Rly. land involves occasional or limited
use of land
by a party for a specific purpose like passage/ path way/ roads or public roads/ water
pipeline crossing for cultivation by individual farmers/ water or sewage pipelines crossing for
individual upto 300 mm dial pipelines for water or sewage or effluent/Oil/ Gas/electric lines crossing
for individual houses, shops etc./electrical crossing by State Electricity Boards and Central
Agencies/ laying telecommunication cables and Alignments including track crossing In the above
caseof Way Leave facilities
(Except ROBs/RUBs, and underground pipe lines), no construction
(whether permanent, quasi permanent or temporary), other than a kaccha or pucca road in cases
the facility is expressly given for the same, is to be
permited on Rly land.If any construction comes
up subsequently, the same should be immediately removed as soon as noticed, and the way leave
facilities discontinued with.
15 That, during the execution of the work on availing way leave facility/ easement rights and also during
maintenance, any loss/ damage occurring directly/ indirectly to the Railways, the Permittee shall be
responsible and the cost there of shall be realized from the Permittee as assessed by the Permittor
16 That, the Permittor shall not be party to any local problem that may arise during execution of the
work as well as during maintenance and the same ill have to be dealt with
by the Permittee/
beneficiary
17 That, the construction work of kacchal pucca road where facility is given for the same, under way
leave/ easement right is to be executed strictly adhering to the drawing approved by the competent
authorities of the Railway as
The work is executed in terms of approved drawing No CE's Drg.No 4873/2021 any addition and/ or
alteration should be got approved before execution of the work. No construction other than the above
will be made and no request will be entertained for regularization of any work under the way leave
easement right is executed without the prior approval of the competent authorities and the
agreement
would be liable to be cancelled"
Page 3 of 7
no
TRPTTIAnanta Narayan
T5(T)/Oy. Gen.Manager
) 1at-/GAIL (India)L Sr. Divnl. Engineer (East)
012, T, IEA, V INiH-5
7
month he shall have to pay liquidated damages 1% per month or part thereof from
period of one
the due date to the date of actual payment. In case payment of way leave/ easement right charges s
not made within a further period of three months the Govt. the Permittor shall be entitled to
way leave/ easement right charges and liquidated damages up to the date of actual vacation as
per the provisions of the Public Premises (Eviction of authorized occupants)Act. 1971
(c)Evicion charges to be realized from the Permittee as per the provisions of the Public premises Evicton of
unauthorized occupants)Act.1971.
19 That. the Permittee will pay the rates to the Permittor as way leave charges as per Rly Board's letter
No.97/LML/24/3 Dated 24.04.2014 & 27.11.01 and as per revised guidelines of Board from tme to
time, subject to reviewI renewal of the agreement every TEN years
20 That, the way leave charges provided for in the agreement shall be liable to be enhanced by the
Permittor from tme to tume at their sole discretion and the Permittee shall be bound to pay the way
Page 4 of 7
T Ananta Narayan
F(T)/ Dy. Gen. Marer af isT 3fU=T7 (5a)
TgAT) TTEZE/ GAIL (Indie) Li 5 Sr. Divnl. Engineer (East)
HIIG, i
612, 3 i TTR,
NH- 5
S12, Utkal Signature, Pahala,
AR-752101/ Bhubaneswar-752101 E.Co.Rialway, Khurde Road
leave charges at the enhanced rates, with retrospective efect, if necessary, on receipt of a notice
Rly. land
new works in Government
desiring to execute
22 That, in the event of the Permittor to
the Permittee agrees
leave facility permitted,
the alteration or shifting of the way
necessitating the East Coast Railway
of the said officer of
out these alteration or shifting under the supervision
carry Coast Railway's said
done by the East
to the work being
concerned or that he will raise no objection
such works are required
Permittee or in the opinion of
the East Coast Railway
officer at the cost of the
claim against the
Permittee shall have no
Coast Railway. In either event, the
to be done by the East
leave facility permitted.
Permittor to interruptions in the way
owing
Government or the
for
which ever will be applicable
liable to the extra way leave charges
be pay
23 That, the Permittee shall either by the
shifted on requirement
in the event of way leave facility being
the extra area of land
of arrear amount of way
liable to pay for recovery
Permittee. Permittee shall be
Permittor or by the
increase due to increase of land value.
leave charges
caused to the pipeline by the running of
not be responsible for any damage
24 That. the Permittor shall
de-railments or accidents to trains by any other cause
26 That, the Permittee shall not transfer or assign this agreement or any of the privileges hereby granted
or part with permission for using the land without of the Permittor.
prior approval
27 That the Permittee, if uses more area of Rly land than the permitted area, it will be treated as
unauthorized occupation and breach of agreement which will result for termination of the agreement
for the way leave facility permitted and will be processed under the provision of the public premises
(Eviction of unauthorized occupations( Act 1971)
28 nat, In the event of the way leave facility / easement right being discontinued with by the Permittee,
the Permittor will not be liable to pay any compensation or reimburse any amount to the Permittee,
29 That this agreement for way leave permission will be got reviewed / renewed once in every 10 (TEN)
years
30 That. in the event of scheduled / natural expiry of the agreement, the beneficiary will be bound to hand
suspend temporarily and / or terminate this agreement and all of the privileges here by granted upon
the expiry of one month's notice in writing of its intention so to do being left at are sent by registered
post to the registered office/ address of the Permittee and notwithstanding the Permittee may have
executed any work of a permanent or temporary character and incurred expenses in the execution
thereof. The Permittee shall not be entitled to any damages or compensation by reason of such
termination or suspension.
32 The Permittee may on giving to the administration one month's notice in writing. terminate this
and such notice shall be sufficiently served by sending it through registered post to the
agreement
Divisional Railway Manager, (Engineering) East Coast Railway, Khurda Road at or left at his office
in Khurda Road
33 That the beneficiary will pay the cost of all stamping charges and execution of this agreement
34 Subject to as otherwise provided in this agreement all notices to be given on behaif of the President of
India and all other actions to be taken on his behalf by the Divisional Railway Manager oft Khurda
weather during the progress/lease period be referred by the permittee, shall be dealt under clause 63
&64 of GCCof East Coast Railway
against each
38 Arbitration
In the event of any dispute or difference of opinion between the parties as to the respective right and
obligations of the parties hereunder or as to the true intent and meaning of these presents or any
articles or conditions thereof arising such dispute or difference of opinion (except the matters regarding
which the decision has been specifically provided for in this agreement) shall be referred to the sole
Arbitration and Conciliation Act. 1996 will applicable for this purpose.
If the Arbitrator appointed by the General Manager, East Coast Railway resigns from his appointment
as an Arbitrator or vacates his office or is unable or unwiling to act so far any reason what so ever or
dies the General Manager, East Coast Railway will have the power to appoint a new Arbitrator to actin
his place Such Arbitrator shall be entitled to proceed with the reference from the stage at which it was
left by the previous Arbitrator.
The Arbitrator may from time to time, with the consent of parties to these presents enlarge time for
making and publishing the award.
Witness
1.
2
Signed by:
PERMITTEE
Dy.General Manager (Const.)
GAIL India,Limited,612,Utkal,SignaturePahal, A Ananta Narayan Sa
HU Oy
NH-5,Bhubaneswar, District-Khurda,Odisha-752101. f 1 R
Cen Mana er
Regd. Office-GAIL Bhawan,16Bhikaiji Camp Place, GAL Lm
New Delhi-110066This day of 12, Uk
gnature, Palhaa, NH- 5
Witness:1 2. ChranjeeV Jena a l T52101/ Bhubaneswar-75210
Page 7 of7
9103615)
H ZTH/Sourabh Das
ore (trd7Senior Manager(Project)
ra )f AIL a} Limited
1-o -5
610-61:.i IH-5
15 032