Method Statement
for
Pre-drilling Works
(Rev.1)
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK
CONTENTS
1. Introduction
2. Construction Works
2.1 Preparation Works
2.2 Working Procedures
2.3 Monitoring Check Points around the Site
3.1 Manpower
3.2 Equipment
3.3 Safe Lifting Procedure
4. Environment Protection
APPENDICES
1. INTRODUCTION
This method statement describes the details and sequence for the pre-drilling works.
In general 4nos. of pre-drilling borehole will be carried out by using drilling rig.
III. Setting out of pre-drilling borehole shall be marked on site for inspection.
Step 1: Setting out for predrilling borehole and the coordinates are listed below:
Borehole No. E N
PD1 838480.503 816906.112
PD2 838487.595 816908.147
PD3 838481.129 816897.212
PD4 838490.956 816899.394
Step 2: Drilling to proposed bottom level with temporary casing. The drilling
depth can be controlled by counting numbers of drilling rod used
during the drilling process. Maximum depth shall be 40m below
ground level.
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK
Step 3: For pre-drill holes inside 10m zone of MTRC tunnel (ie. PD3 & PD4),
verticality of pre-drill holes shall be monitored by inclinometer
(method statement refer APPENDIX D). The maximum deviation
from vertical of channel planking in any direction shall be less than 1 to
100.
Monitoring Criteria
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK
3.2 Equipment
- The emergency contact list will be displayed near the gate.
- The protection barrier will be provided during the works.
- An effective ventilation system shall be provided to keep the air quality in
the working area at an acceptable level.
- All lifting gear including lifting clamp should be tested and thoroughly
examinated by RPE.
- All machine, equipment and lifting gear shall be checked by site safety
team.
- The design of lifting eye should be certified by Independent Checking
Engineer.
- Spare lifting gears shall be provided to prevent inappropriate equipment
were used.
- During lifting, in order to prevent the swing of the object, a 3-4m long
tagline shall be attached to the lifting object and controlled by Rigger or
Signalman.
- Prior to lifting operation, the balance conditions shall be checked at about
0.5m above ground.
- Rigger or Signalman must stop the work if any abnormal operation is
observed. Material storage zone should be set up and fenced off. During
lifting operation, only Rigger or Signalman stays inside the storage zone to
help processing lifting.
- A color coding system shall be adopted on all lifting gears such as wire
ropes and slings, etc. The color system is Blue (Jan – Mar), Yellow (Apr –
Jun), Green (Jul – Sep) and Orange (Oct – Dec).
4. ENVIRONMENT PROTECTION
- Sump pit will be set up for each drilling machine to collect the fluid to
pump to settlement tanks prior to discharging to the drainage system for
the standpipe installation.
- All cement bags and grout bags will be placed in the disposal bin on
site.
- Emission generated by mechanical plant shall be monitored and
controlled.
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK
Appendix A -
Pre-drilling Layout Plan
-14.00 ≥ ≥
FN-08
FN-09
FN-06
C
D
WING FAT BUILDING
B
NOS. 114~120 CHUN YEUNG STREET
(FOUND ON CONCRETE PILE FOUNDATION)
1 2 3 4 SCAVENGING LANE
13670
(3.0m WIDE) PD1
3670 3400 6600
838480.503 E
L L 816906.112 N
-11.00
E F E
-12.00
.00
00
-13.00
-15
FN-10 C-1 C-14 C-34 FN-10
-14.
C-24 C-40
2600
C-29
E C-2
C-19 C-35 C-42
F F CP-01
2600
816908.147 N
C-6 C-45
-13.00
9500
C-13 C-39
A A
21300
-15.00
-16.00
-11.00
10m
FN-05 C-7 C-46 FN-05
-14.00
10m
C-13a C-39a
PROPOSED PRE-DRILL LOCATION
ZONE
TB TB
(PD1 - PD4)
ZONE
(500x2000) (500x2000)
PC-A PC-B
A-4 2000mm THK. 2000mm THK. B-4
C (U.S.S.) (U.S.S.)
A-3 TB B-3
(500x2000)
A-2 B-2
-10.
4655
A-5 B-5
00
3m AWAY
-17.00
MTRC TUNNEL TUNNEL
DEVELOPMENT BUILDING
PD3
-9.00
PD4
NOS. 387~389 KING'S ROAD
-11.00
-12.00
-13.00
-14.00
-15.00
B
-16.00
PD4
UP TRACK
838490.956 E
816899.394 N
PD3
838481.129 E
EXISTING RAILWAY
KING'S ROAD 816897.212 N
TRACK TUNNEL
TUNNEL MTRC TUNNEL
MTRC DOWN TRACK
L
3m AWAY
FN-09
FN-06
D
B
Appendix B -
Monitoring Check Points Layout Plan around
the Site
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK
Appendix C -
Plant Catalogue
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK
Appendix D -
Method Statement for Verticality Check by
Inclinometer
DATASHEET
Overview
APPLICATIONS
Dams & embankments
Bridges
Ground improvement
USED TO MONITOR
Lateral displacement of soil or rock
www.geosense.co.uk MEMS
Portable MEMS Inclinometer
Specifications
RANGE
Full Scale Range1 ±30° from vertical
PROBE
Sensor type Biaxial MEMS
CABLE
Diameter 7.5mm
Weight 5.8kg/100m
Jacket Polyurethane
Connector Piston & face seal with robust stainless steel alignment keyway (30 bar rated)
1
Other ranges available on request
www.geosense.co.uk
Portable MEMS Inclinometer
Specifications
Material Polycarbonate
SYSTEM
Total system accuracy ± 3mm/30m (within 3° from vertical)
COMPLIANCE
CE Directives EMC 2014/30/EU Industrial, RED 2014/53/EU,
RoHS 2 2011/65/EU
www.geosense.co.uk
Portable MEMS Inclinometer
IncloPRO App
The IncloPRO app allows the user to take readings, visualise various plots
and send data form site via FTP, API, email etc.
Wizard guides you through Step-by-step guide to ensure Auto mode provides handsfree
setting up sites & boreholes. correct survey methodology is automated data recording
carried out. which ensures consistency &
quality of surveys.
Checksum, cumulative Quick data check available Borehole location can be set
displacement, incremental during the survey to highlight using GPS coordinates.
displacement, mean deviation any problems.
& absolute position graphs can
all be viewed.
www.geosense.co.uk
CAT® S41 Smartphone
Overview
APPLICATIONS
On-site data collection
FEATURES
44 days stand-by-time
CAT® phones are built to Military Defence Specification MIL SPEC Stand-By Time: Up to 44 days
810G and are IP68 water and dust resistant. The scratch-resistant
DATA SPEED2
screen has been drop-proof tested onto concrete from up to 1.8
metres. It’s also tough enough to handle thermal shocks and salt Maximum Downlink Data Rate: 300Mbps
mist spray.
Data Speed (Maximum Uplink Data Rate): 50Mbps
It has a 5,000mAh battery to give you up to 38 hours talk-time and
MEMORY3
44 days stand-by-time. You can even use it as a power bank for
other mobiles with the Battery Share feature. ROM Flash: 32GB
RAM: 3GB
NETWORK4
4G compatible, user SIM dependent
1
Battery: Times (talk time, standby time, and more) are based on
3G and are subject to network and phone usage.
2
Data Speed: Upload and download speeds also depend on the
mobile operator.
3
Memory: Available storage is less due to phone software.
4
Network: Bands in regions may be different, depending on the
mobile operator and your location.
www.geosense.co.uk
CAT® S41 Smartphone
Specifications
DISPLAY
Display Type: Super Bright 5” Display – FHD (1920 x 1080) IPS, auto switch support and wet finger/glove-on working technology**
CAMERA
Main/Rear: 13MP autofocus with PDAF, LED flash
CONNECTIVITY
Audio Jack: 3.5mm
Bluetooth: 4.1
PROCESSOR
Processor Type: MTK P20 MT6757 Octacore 2.3GHz
RUGGED
IP Rating: IP68 Certified
Military Standard: MIL-SPEC 810G, Shock and Drop, Operating Temp: -25°C to +55°C, Category 4 vibration
SIZE
Size: 152 x 75 x 12.85mm
Weight: 218g
** We cannot guarantee that all gloves will work with this feature. A stylus is supplied for use in wet weather conditions.
www.geosense.co.uk
Geosense Ltd, Nova House, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND, England