Proposed Redevelopment at

Nos. 383-385 King’s Road, North Point, HK

Method Statement for Pre-drilling Works BD Ref.: 3/3022/19

Method Statement
for
Pre-drilling Works
(Rev.1)
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK

Method Statement for Pre-drilling Works BD Ref.: 3/3022/19

CONTENTS

1. Introduction

2. Construction Works
2.1 Preparation Works
2.2 Working Procedures
2.3 Monitoring Check Points around the Site

3. Health and Safety

3.1 Manpower
3.2 Equipment
3.3 Safe Lifting Procedure

4. Environment Protection

APPENDICES

Appendix A - Pre-drilling Layout Plan

Appendix B - Monitoring Check Points Layout Plan around the Site

Appendix C - Plant Catalogue

Appendix D - Method Statement for Verticality Check by Inclinometer


Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK

Method Statement for Pre-drilling Works BD Ref.: 3/3022/19

1. INTRODUCTION
This method statement describes the details and sequence for the pre-drilling works.

In general 4nos. of pre-drilling borehole will be carried out by using drilling rig.

Pre-drilling layout plan shall refer to drawings attached in Appendix A.

2. MONITORING CHECK POINTS INSTALLATION


2.1 Working Procedures

I. Before commencement of pre-drilling works, monitoring check points shall


be installed around the site.

III. Setting out of pre-drilling borehole shall be marked on site for inspection.

2.2 Working Procedures

Step 1: Setting out for predrilling borehole and the coordinates are listed below:

Borehole No. E N
PD1 838480.503 816906.112
PD2 838487.595 816908.147
PD3 838481.129 816897.212
PD4 838490.956 816899.394

Step 2: Drilling to proposed bottom level with temporary casing. The drilling
depth can be controlled by counting numbers of drilling rod used
during the drilling process. Maximum depth shall be 40m below
ground level.
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK

Method Statement for Pre-drilling Works BD Ref.: 3/3022/19

Step 3: For pre-drill holes inside 10m zone of MTRC tunnel (ie. PD3 & PD4),
verticality of pre-drill holes shall be monitored by inclinometer
(method statement refer APPENDIX D). The maximum deviation
from vertical of channel planking in any direction shall be less than 1 to
100.

Step 4: After completion of pre-drilling works, all borehole shall be backfilled


properly.
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK

Method Statement for Pre-drilling Works BD Ref.: 3/3022/19

2.3 Monitoring Check Points around the Site

During pre-drilling works, monitoring check points shall be installed and


readings should be taken according approval drawing attached in Appendix B.

Monitoring Check Points Layout

Monitoring Criteria
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK

Method Statement for Pre-drilling Works BD Ref.: 3/3022/19

3. HEALTH AND SAFETY


3.1 Manpower
- All Personnel will complete the Construction Industry Safety Training
Certificate (Green Card).
- All workers will undergo a safety induction course before the
commencement of works on site.
- Pre-work briefing will be provided before commencement of work.
- The appropriate PPE shall be worn.
- All workers working at height are to be equipped with full-body type safety
harness with suitable lanyards and secure anchorage for the attachment of
safety harnesses.

3.2 Equipment
- The emergency contact list will be displayed near the gate.
- The protection barrier will be provided during the works.
- An effective ventilation system shall be provided to keep the air quality in
the working area at an acceptable level.
- All lifting gear including lifting clamp should be tested and thoroughly
examinated by RPE.
- All machine, equipment and lifting gear shall be checked by site safety
team.
- The design of lifting eye should be certified by Independent Checking
Engineer.
- Spare lifting gears shall be provided to prevent inappropriate equipment
were used.

3.3 Safe Lifting Procedures


- Rigger or Signalman should be fenced off the lifting area and make sure no
one stay inside the lifting zone prior to lifting commence.
- The Plant operator should verify the instruction on lifting operation before
taking action.
- Lifting Clamp or Lifting Eye should be used to lifting circular hollow and
steel reinforcement.
- The Rigger or Signalman should keep well communication with the plant
operator by using walkie-talkie and signal.
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK

Method Statement for Pre-drilling Works BD Ref.: 3/3022/19

- During lifting, in order to prevent the swing of the object, a 3-4m long
tagline shall be attached to the lifting object and controlled by Rigger or
Signalman.
- Prior to lifting operation, the balance conditions shall be checked at about
0.5m above ground.
- Rigger or Signalman must stop the work if any abnormal operation is
observed. Material storage zone should be set up and fenced off. During
lifting operation, only Rigger or Signalman stays inside the storage zone to
help processing lifting.
- A color coding system shall be adopted on all lifting gears such as wire
ropes and slings, etc. The color system is Blue (Jan – Mar), Yellow (Apr –
Jun), Green (Jul – Sep) and Orange (Oct – Dec).

4. ENVIRONMENT PROTECTION
- Sump pit will be set up for each drilling machine to collect the fluid to
pump to settlement tanks prior to discharging to the drainage system for
the standpipe installation.
- All cement bags and grout bags will be placed in the disposal bin on
site.
- Emission generated by mechanical plant shall be monitored and
controlled.
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK

Method Statement for Pre-drilling Works BD Ref.: 3/3022/19

Appendix A -
Pre-drilling Layout Plan
-14.00 ≥ ≥

GLORY RISE BUILDING


NOS. 122~128 CHUN YEUNG STREET
(FOUND ON DRIVEN H-PILE FOUNDATION)

FN-08
FN-09
FN-06

C
D
WING FAT BUILDING

B
NOS. 114~120 CHUN YEUNG STREET
(FOUND ON CONCRETE PILE FOUNDATION)

1 2 3 4 SCAVENGING LANE
13670
(3.0m WIDE) PD1
3670 3400 6600
838480.503 E
L L 816906.112 N
-11.00

E F E
-12.00

.00
00
-13.00

-15
FN-10 C-1 C-14 C-34 FN-10

-14.
C-24 C-40
2600

C-29

E C-2
C-19 C-35 C-42
F F CP-01
2600

FN-10 C-10 FN-10


C-3 C-16 C-31
FOK YING
BUILDING D C-26
NOS. 379~381 C-37
KING'S ROAD C-4 C-43
(FOUND ON
CAISSON C-11 C-21
FOUNDATION) SP1
C-5 C-18 PC-C C-33 C-44
PD2
C-12 2000mm THK. C-38 838487.595 E
(U.S.S.)
-12.00

816908.147 N
C-6 C-45
-13.00
9500

C-13 C-39
A A
21300

-15.00

-16.00
-11.00

10m
FN-05 C-7 C-46 FN-05
-14.00

10m
C-13a C-39a
PROPOSED PRE-DRILL LOCATION

ZONE
TB TB
(PD1 - PD4)

ZONE
(500x2000) (500x2000)

PC-A PC-B
A-4 2000mm THK. 2000mm THK. B-4
C (U.S.S.) (U.S.S.)
A-3 TB B-3
(500x2000)
A-2 B-2
-10.
4655

A-5 B-5
00
3m AWAY

-17.00
MTRC TUNNEL TUNNEL

A-1 B-1 HENAN ELECTRIC


MTRC

DEVELOPMENT BUILDING

PD3
-9.00

PD4
NOS. 387~389 KING'S ROAD
-11.00

-12.00

-13.00

-14.00

-15.00

B
-16.00

(FOUND ON DRIVEN H-PILE


FOUNDATION)
1945

PD4
UP TRACK

838490.956 E
816899.394 N

PD3
838481.129 E
EXISTING RAILWAY
KING'S ROAD 816897.212 N
TRACK TUNNEL
TUNNEL MTRC TUNNEL
MTRC DOWN TRACK

L
3m AWAY

FN-09
FN-06

D
B

KENITH HO & ASSOCIATES LIMITED


何家傑工程顧問有限公司
ROOM 808, 8/F, KIMBERLAND CENTER, NO.55 WING HONG STREET,
CHEUNG SHA WAN, KOWLOON, HONG KONG
TEL: (852) 2882 2246 FAX: (852) 2822 8851 E-MAIL: general@khal.com.hk
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK

Method Statement for Pre-drilling Works BD Ref.: 3/3022/19

Appendix B -
Monitoring Check Points Layout Plan around
the Site
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK

Method Statement for Pre-drilling Works BD Ref.: 3/3022/19

Appendix C -
Plant Catalogue
Proposed Redevelopment at
Nos. 383-385 King’s Road, North Point, HK

Method Statement for Pre-drilling Works BD Ref.: 3/3022/19

Appendix D -
Method Statement for Verticality Check by
Inclinometer
DATASHEET

NEW Portable MEMS Inclinometer


Direct from site connection
send data live via FTP, email or API

• MEMS Digital probe & carry case


• Lightweight robust cable & reel
• Bluetooth communication
• Android Smart Device readout
• Intuitive android app
• Connectivity via FTP, API, email
• 360° EMC protection throughout
Portable MEMS Inclinometer

Overview

APPLICATIONS
Dams & embankments

Retaining walls & deep excavations

Slopes & embankments

Tunnels & shafts

Bridges

Ground improvement

USED TO MONITOR
Lateral displacement of soil or rock

Lateral displacement of diaphragm walls

Lateral displacement of retaining walls


The Geosense Portable Inclinometer system utilises modern
Lateral displacement of dam cores
communication and Smart devices to enable the tilt data generated
by the probe to be managed, stored and transferred directly from Downstream face of rock filled dams
site via FTP, API, email or other communication platforms.
Settlement & heave under tanks
The system comprises a slimline detachable probe, a lightweight
robust elongation-resistant cable, lightweight reel with Bluetooth
communication to the smart android readout device, with a FEATURES
user-friendly app, plus storage and carry cases for all components.
Direct from-site live data transfer
The probe is fitted with industry standard MEMS biaxial sensors
together with a signal conditioning board allowing the calibration Fast stable readings
factors to be stored within the probe. A digital output signal via the
reel is sent to the Smart android device where it is converted to Robust MEMS sensor
engineering units. High accuracy
The double Kevlar® reinforced cable and depth markers have
Auto & manual reading options
been designed and tested with weight up to 40 kg to ensure their
long-term stability. Android-based operating system
To ensure data is not compromised by electro-magnetic Probes and reels are interchangeable
interference and thus become inaccurate, even on noisy sites, the
system has been designed and fitted with full 360 degree EMC Bluetooth connection - auto mating of device & reel
protection within the probe, cable and reel and is fully tested in
Kevlar® reinforced cable with swaged cable marks
accordance with CE and FCC requirements.
IP68 (20 bar) rated

www.geosense.co.uk MEMS
Portable MEMS Inclinometer

Specifications

RANGE
Full Scale Range1 ±30° from vertical

PROBE
Sensor type Biaxial MEMS

Sensor accuracy2 ±0.004° (±13.5 arc sec, ±0.07 mm/m) ±0.0125% FS

Sensor resolution 0.0005° (2 arc sec, 0.01 mm/m) 0.0017% FS

Sensor repeatability ±0.002° (±7.2 arc sec, ±0.037 mm/m) ±0.007% FS

Output signal RS-485 Digital BUS

Output unit Sine of angle

Probe gauge length 500mm

Probe diameter 25mm

Probe length 680mm

Probe length (including connector) 800mm

Probe weight 1.32kg

Enclosure rating IP68 (24 bar)

Materials 316 stainless steel,

Probe carry case dimensions 725 x 200 x 105mm

Probe carry case weight 5.6kg

CABLE
Diameter 7.5mm

Weight 5.8kg/100m

Minimum break load 400kgf

Restraining member Double Kevlar reinforcement

Jacket Polyurethane

Depth markers Every 500mm

Lengths 30,50,75,100,150m (other available on request)

Connector Piston & face seal with robust stainless steel alignment keyway (30 bar rated)
1
Other ranges available on request

www.geosense.co.uk
Portable MEMS Inclinometer

Specifications

CABLE REEL & CARRY BAG


Communication Bluetooth low energy

Enclosure rating IP65

Power supply Ni-MH 12V 1000mAh rechargeable batteries

Operating time Minimum 15 hours continuous

Material Polycarbonate

30 to 50m cable diameter 310mm

75 to 100m cable diameter 380mm

30m cable weight 5.92kg (including carry case)

50m cable weight 7.2kg (including carry case)

75m cable weight 9.5kg (including carry case)

100m cable weight 10.85kg (including carry case)

SYSTEM
Total system accuracy ± 3mm/30m (within 3° from vertical)

Total system repeatability ± 1mm/30m

Cat S41 readout unit mm

Readout data export CSV (Sine alpha & mm)

Operating temperature -40 to +85°C

COMPLIANCE
CE Directives EMC 2014/30/EU Industrial, RED 2014/53/EU,

RoHS 2 2011/65/EU

FCC certification Part 15

www.geosense.co.uk
Portable MEMS Inclinometer

IncloPRO App

The IncloPRO app allows the user to take readings, visualise various plots
and send data form site via FTP, API, email etc.

Wizard guides you through Step-by-step guide to ensure Auto mode provides handsfree
setting up sites & boreholes. correct survey methodology is automated data recording
carried out. which ensures consistency &
quality of surveys.

Checksum, cumulative Quick data check available Borehole location can be set
displacement, incremental during the survey to highlight using GPS coordinates.
displacement, mean deviation any problems.
& absolute position graphs can
all be viewed.

www.geosense.co.uk
CAT® S41 Smartphone

Overview

APPLICATIONS
On-site data collection

Compatible with several systems and dataloggers

FEATURES

Rugged design for use in extreme environments

5,000mAh battery and battery share

44 days stand-by-time

32GB flash storage

Data speed: Downlink 300Mbps; Uplink 50Mbps

Corning® Gorilla® Glass screens

MIL SPEC 810G and IP68 certified

Dust-proof and drop-proof


The CAT® S41 smartphone is used as a handheld readout to
configure and collect data using a purpose-designed app. BATTERY1
Designed for use in challenging environments, the S41 has a Type: Non removable Lithium Ion
long-lasting battery and provides a high-level user interface and Capacity: 5000mAh, Pump Express 2.0
industry-leading memory plus wireless communication options
for ease of use and reliability. Talk Time: Up to 38 hours (3G)

CAT® phones are built to Military Defence Specification MIL SPEC Stand-By Time: Up to 44 days
810G and are IP68 water and dust resistant. The scratch-resistant
DATA SPEED2
screen has been drop-proof tested onto concrete from up to 1.8
metres. It’s also tough enough to handle thermal shocks and salt Maximum Downlink Data Rate: 300Mbps
mist spray.
Data Speed (Maximum Uplink Data Rate): 50Mbps
It has a 5,000mAh battery to give you up to 38 hours talk-time and
MEMORY3
44 days stand-by-time. You can even use it as a power bank for
other mobiles with the Battery Share feature. ROM Flash: 32GB

RAM: 3GB

Extended Storage: microSD™ (up to 2TB)

NETWORK4
4G compatible, user SIM dependent
1
Battery: Times (talk time, standby time, and more) are based on
3G and are subject to network and phone usage.
2
Data Speed: Upload and download speeds also depend on the
mobile operator.
3
Memory: Available storage is less due to phone software.
4
Network: Bands in regions may be different, depending on the
mobile operator and your location.

www.geosense.co.uk
CAT® S41 Smartphone

Specifications

DISPLAY
Display Type: Super Bright 5” Display – FHD (1920 x 1080) IPS, auto switch support and wet finger/glove-on working technology**

Display Cover: Corning® Gorilla® Glass 5

CAMERA
Main/Rear: 13MP autofocus with PDAF, LED flash

Front: 8MP fixed focus

CONNECTIVITY
Audio Jack: 3.5mm

Bluetooth: 4.1

NFC: Yes (Android Pay™)

Wi-Fi: 802.11 b/g/n (2.4 & 5GHz)

USB: micro-USB 2.0, USB-OTG

SIM Type: Nano SIM, dual and single SIM variants

GPS: GLONASS, GPS, aGPS, Beidou (variant dependent)

PROCESSOR
Processor Type: MTK P20 MT6757 Octacore 2.3GHz

Platform/OS: Google Android™ Oreo

RUGGED
IP Rating: IP68 Certified

Waterproof: Up to 2m for 60 mins

Dust Proof: Dust Resistant

Drop Test: Up to 1.8m

Military Standard: MIL-SPEC 810G, Shock and Drop, Operating Temp: -25°C to +55°C, Category 4 vibration

SIZE
Size: 152 x 75 x 12.85mm

Weight: 218g

** We cannot guarantee that all gloves will work with this feature. A stylus is supplied for use in wet weather conditions.

www.geosense.co.uk
Geosense Ltd, Nova House, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND, England

www.geosense.co.uk e sales@geosense.co.uk t +44(0)1359 270457

Geosense® is a registered trademark


Specifications may change without prior notice V1.0 02/2020