You are on page 1of 2

CalCommander v.1.

53 Page 1 of 2 12-Feb-2014 18:23

Heat of Hydration Report

Sample 1 Sample 2 Sample 3 Sample 4


Heat of Hydration, J/g 376.50 302.87 306.89

Mix ID Tuesday
V Lab Friday
V Lab Wednesday
V Lab
Total Mass, g 75.00 75.00 75.00
Cement ID A B C
Cement Content, g 50.00 35.00 35.00
SCM 100% Cement 30% Silica Fume 30% Slag
SCM Content, g 0.00 15.00 15.00
Water Content, g 25.00 25.00 25.00
Water / Cem Mat Ratio 0.50 0.50 0.50
Mix Method Vortex mixer Vortex mixer Vortex mixer
Mix Temperature, degF 73.5 73.5 73.5
Mix Date / Time 04-Feb-2014 16:38 07-Feb-2014 14:14 10-Feb-2014 17:32
Log Duration, hh:mm 200:00 200:00 200:00
Logger S/N A0001-265 A0001-265 A0001-265
Calibration File A0001-265 A0001-265 A0001-265
Calibration Date 13-Sep-2013 13-Sep-2013 13-Sep-2013
CalCommander v.1.53 Page 2 of 2 12-Feb-2014 18:23

Correction Data

Mix ID
Total Mass, g 0.00
Cement ID
Cement Content, g 0.00
Water Content, g 0.00
Water / Cem Mat Ratio NaN
Mixing Method
Mix Temperature, degC 0.0
Mix Date / Time 01-Jan-2000 00:00
Log Duration, hh:mm 00:00
Logger S/N
Calibration File
Calibration Date 31-Dec-1903
Mix Correction, J/g 0.00
Tian Correction Applied FALSE

DISCLAIMER: CalCommander results are only applicable to the samples tested. CalCommander results are only
indicative of concrete performance. Actual concrete tests according to relevant standards and practices are required
to validate any results generated by CalCommander. CalCommander results do not guarantee any concrete
performance whatsoever.

You might also like