Professional Documents
Culture Documents
Let’s understand the evacuation of procedure for workers and visitors in case
of fire, explosion or smoke in the workshop.
Approach the nearest fire alarm and break the glass with help of a hammer.
Press the alarm of the fire button to active it.
After activating the fire alarm starts to make loud sound.
Note:
A person should be aware of the sound of the fire alarm.
Start escaping the workshop to a nearest safe exit.
Note:
Stop working immediately after hearing the alarm and don’t stop to collect
any belongings.
Always follow the emergency exit route plan while trying to escape.
A person should be aware of the exit routes of each flow in case of
emergency.
Follow the exit direction while escaping the floor.
Follow for the instruction of trained personnel in the workshop for the safe
evacuation during emergency.
Note:
Close the door after the last person gets out and notifying other on your way
out.
Always exit in a systematic way for safe evacuation.
Note:
Do not panic and rush through the doors.
Use stairs instead of elevators to exit safely.
Note:
Do not use elevator unless authorize personnel direct you to do so.
Keep exit doors free of obstacles.
Note:
Report any missing or trapped person to authorized emergency personnel.
Move away from the building and got to your evacuation meeting site.
Note:
Do not re-enter the building until authorized emergency personnel direct you
to do so.
Maintenance of tools:
Double ended spanner.
This tool is known as double ended spanner.
It is generally used in automobile industries to loosen or tighten
hut or bolts.
The size of spanner varies so as to fit different sized nuts or bolts.
Note:
The size of spanner is 10-11, 12-13mm and 18-19mm etc.
It consists of two jaws at both ends.
Open end jaw and closed end jaw.
Result: Hence the Evacuation of procedures is completed successfully.