Professional Documents
Culture Documents
SOCIO-ECONOMIC ENVIRONMENT
Due to Proposed expansion project, 2 nos. of local peoples and
outside peoples will get employment during the construction phase
and additional 23 peoples will be employed during the operation
phase. The indirect employment will also be generated by way of
transportation, shopkeepers and other casual employment for many
people. Thus, the proposed Expansion project will have long term-
irreversible positive impact on the employment pattern of the study
area.
ENVIRONMENTAL MANAGEMENT PLAN
FOR CONSTRUCTION PHASE Well maintained vehicles will be used. x
Metalled Road for Vehicle Movement x Well maintained equipment
will be utilized to prevent noise generation. x Local labour will be
hired for the work so that housing arrangement will be avoided.
FOR OPERATIONAL PHASE: They planned all the necessary steps to
control Water Pollution, Air Pollution, noise pollution as well as
Hazardous Waste Pollution.