You are on page 1of 1

CL

25 MM THCK. HIGH STRENGTH


NON SHRINK GROUT

N.G.L DOUBLE TIES @ TOP


50mm SPACING

LENGTH

PROVIDE GRAVEL BEDDING


(G-1) 75mm THK.
F'

T1 T1
T2

DEPTH
'D'

WIDTH
PROVIDE SPACER BLOCK TO MAINTAIN
STANDARD CONCRETE COVER (75mm)
150 THK GRAVEL BEDDING ( CRUSHED
B1 B2
AGGREGATE BASE COURSE) COMPACTED TO
50mm LEAN CONCRETE 95% MDD BASED ON ASTM D-698

3 COLUMN FOOTING & TIE BEAM DETAILS


S-05 SCALE N. T. S.

STRUCTURAL FOUNDATION PAD FOOTING

SIZE REINFORCEMENT
MARK
LENGTH WIDTH DEPTH REINFORCEMENT LONG SPAN REINFORCEMENT SHORT SPAN DIM 'F'
(L) (W) (D) B1 T1 B2 T2

PF 1 2500 mm 2500 mm 700 mm D25-275 D25-275 D25-275 D25-275 1700 mm

PF 2 3500 mm 3500 mm 750 mm D25-250 D25-250 D25-250 D25-250 1750 mm

PF 3 2000 mm 2000 mm 500 mm D25-350 D25-350 D25-350 D25-350 1500 mm

PF 4 3000 mm 3000 mm 700 mm D25-275 D25-275 D25-275 D25-275 1700 mm

PF 5 2000 mm 2000 mm 500 mm D25-350 D25-350 D25-350 D25-350 1500 mm

PF 6 3500 mm 3500 mm 800 mm D16-250 D16-250 D16-250 D16-250 1800 mm

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND LOCAL PROGRAM JOSE J. LALOG III
HIGHWAYS NATIONAL BUILDING PROGRAM ARCHITECT I
A A
BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES KAREN L. MOLANO RAY ANDREW K. MOLANO ISIDRO O. ENCARNACION JOVEL G. MENDOZA
REGIONAL OFFICE NO. IV-A CONSTRUCTION OF DPWH REGION IV-A OFFICE
SECOND FLOOR REFLECTED CEILING PLAN PREPARED:
ENGINEER III ENGINEER IV OFFICER-IN-CHARGE DIRECTOR IV 09 09 09
DPWH REGION IV-A CANLUBANG INTERCHANGE, CANLUBANG INTERCHANGE, BRGY. MAYAPA, CONCURRENT OIC, BUILDINGS UNIT OIC, OFFICE OF THE DIVISION CHIEF ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
CITY OF CALAMBA, LAGUNA EDWIN EDGAR M. BAROLA OFFICE OF THE REGIONAL DIRECTOR PLANNING AND DESIGN DIVISION
BRGY. MAYAPA, CITY OF CALAMBA, LAGUNA ARCHITECT II
DATE: DATE:
DATE: DATE:

You might also like