Updated 02.06.2020 As Per NCC Updated Schedule 02.06.

2020
NCC Shop Drawing Submission Schedule
A - Approved
B - Approved with comments
Status Code
C -Resubmit
D -Reject

NCC NCC
Floor Drawing Type DTF No Submission Submitted BSEC CSEC SMA Status Remarks
date date
Fire Protection (R2) 30-Jun - -
HVAC 1367 - 15-May 21-May - - C NCC Need to Resubmit
Basement HVAC (R1) 30-Jun
Floor
Coordination 30-Jun - -
Final CBP / GA Pending After Comment Received from BSEC for CSD
Electrical (R6) 8-Jun - -
ELV (R6) 8-Jun - -
Water Supply (R4) 12-Jun - -
Sewer ,Waste (R4) 12-Jun - -
Fire Protection (R5) 10-Jun - -
Ground Floor
Fire Detection (R5) 10-Jun - -
HVAC 1367 - 15-May 21-May - - C NCC Need to Resubmit
HVAC (R1) 19-Jun
Coordination 19-Jun - -
Final CBP / GA Pending After Approving CSD
Sewer ,Waste (R1) 16-Jun - -
Fire Protection (R1) 16-Jun - -
Fire Detection (R1) 16-Jun - -
HVAC (R1) 1367 - 15-May 21-May - - C NCC Need to Resubmit
1st Floor
HVAC (R2) 16-Jun
Coordination (R5) 16-Jun - -
CBP (R7) / GA (R8) 1306 - 9-Apr 20-Apr 9-May 14-May
FInal CBP (R7) / GA (R9) Pending
Fire Protection (R1) 26-Jun - -
Fire Detection (R1) 26-Jun - -
HVAC 1367 - 15-May 21-May - - C NCC Need to Resubmit
HVAC (R1) 26-Jun
2nd Floor Generator (R2) 26-Jun - -
Coordination (R4) 26-Jun - -
As Built CBP/GA Signed H/C Signed H/C Confirm Ok
GA (R4) 873 6-Jan - 17-Jan 20-Jan
Final CBP / GA (R5) Pending After Generator Room SD Approval
HVAC 1367 - 15-May 21-May - - C NCC Need to Resubmit
HVAC (R1) 16-Jun
3rd Floor
As Built CBP/GA - - - Signed H/C Signed H/C Confirm Ok
Final CBP / GA Pending
HVAC 1367 - 15-May 21-May - - C NCC Need to Resubmit
HVAC (R1) 16-Jun
4th Floor
CBP (R7) / GA (R8) 1308 5-Mar 9-Apr 20-Apr 9-May 14-May
CBP (R8) / GA (R9)
HVAC N/A - -
5th Floor CBP (R7) / GA (R8) 1309 5-Mar 9-Apr 20-Apr 7-May 14-May
CBP (R8) / GA (R9)
HVAC N/A - - NCC Need to Resubmit
GA (R5) - Block Wall 865 - 6-Jan - 20-Jan 16-Jan
6th Floor
CBP (R5) 995 29-Jan 30-Jan 10-Feb 3-Feb 2-Mar
CBP (R8) / GA (R6)
HVAC N/A - - NCC Need to Resubmit
Coordination 3-Jul - -
7th Floor
CBP (R8) / GA (R8) 1310 - 9-Apr 20-Apr 15-May 17-May
CBP (R9) / GA (R9) Pending
HVAC 1367 - 15-May 21-May - - C NCC Need to Resubmit
HVAC (R1) 13-Jun - -
Need to clarify with BSEC regarding ceiling
7M Floor Coordination Pending - -
coordination and light fitting locations
CBP / GA (R5) 1311 - 9-Apr 20-Apr 7-May 15-May
CBP / GA (R6) Pending
HVAC 1367 - 15-May 21-May - - C NCC Need to Resubmit
HVAC (R1) 4-Jun - -
8th Floor Coordination (R1) 4-Jun - -
CBP / GA (R5) 1313 - 9-Apr 20-Apr 7-May 17-May
CBP / GA (R6) Pending
Sewer ,Waste (R2) 11-Jul - -
HVAC 1367 15-May 21-May - - C NCC Need to Resubmit
HVAC (R1) 11-Jul - -
9th Floor Coordination (R1) 11-Jul - -
CBP / GA (R4) 1041 5-Feb 6-Feb 17-Feb 17-Feb 10-Feb
GA (R5) 1151 19-Feb 19-Feb - 21-Feb 2-Mar NCC Can Issue Hard Copy for final Signature
Sewer ,Waste (R2) 15-Jul - -
HVAC 1367 - 15-May 21-May - - C NCC Need to Resubmit
HVAC (R1) 15-Jul - -
10th Floor
Coordination (R1) 15-Jul - -
CBP / GA (R3) 1042 - 6-Feb 17-Feb 17-Feb 14-Feb
GA (R4) 1152 19-Feb 19-Feb - 20-Feb 3-Feb NCC Can Issue Hard Copy for final Signature

6/3/2020 @ SIMAKVIN DC
NCC NCC
Floor Drawing Type DTF No Submission Submitted BSEC CSEC SMA Status Remarks
date date
Sewer ,Waste (R2) 18-Jul - -
Fire Detection (R1) 18-Jul - -
HVAC (R2) 1367 - 15-May 21-May - - C NCC Need to Resubmit
11th Floor HVAC (R3) 18-Jul - -
Coordination (R1) 18-Jul - -
CBP / GA (R2) 1000 30-Jan 30-Jan 10-Feb 3-Feb 18-Feb
Final GA (R3) 1153 19-Feb 19-Feb - 20-Feb 2-Mar NCC Can Issue Hard Copy for final Signature
Sewer ,Waste (R1) 24-Jul - -
Fire Detection (R1) 24-Jul - -
HVAC (R2) 1367 - 15-May 21-May - - C NCC Need to Resubmit
12th Floor HVAC (R3) 24-Jul - -
Coordination 24-Jul - -
CBP (R2) / GA (R3) 1312 - 9-Apr 20-Apr 7-May 5-May
CBP (R2) / GA (R4) Pending
Water Supply (R2) 29-Jul - -
Sewer ,Waste (R2) 29-Jul - -
HVAC (R2) 1367 - 15-May 21-May - - C NCC Need to Resubmit
13th Floor HVAC (R3) 29-Jul - -
Coordination 29-Jul - -
CBP / GA (R2) 1230 2-Mar 2-Mar 14-Mar 9-May 16-Mar
CBP / GA (R3) Pending
HVAC (R2) 1367 - 15-May 21-May - - C NCC Need to Resubmit
HVAC (R3) 31-Jul - -
14th Floor Coordination 31-Jul - -
CBP / GA (R1) 1231 2-Mar 2-Mar 14-Mar 9-May 16-Mar
CBP / GA (R2)
HVAC (R2) 1343 - 1-May 21-May - - C NCC Need to Resubmit
HVAC (R3) 3-Jul
Conduit Coordination 5-Jun - -
15th Floor
Coordination 3-Jul - -
CBP / GA (R0) 1060 10-Feb 10-Feb 2-Mar 24-Feb 5-Mar
CBP / GA (R1) 1381 - 22-May 26-May 2-Jun Pending
HVAC (R2) 1343 - 1-May 21-May - - C NCC Need to Resubmit
HVAC (R3) 3-Jul - -
Conduit Coordination 8-Jun - -
16th Floor
Coordination 9-Jul - -
CBP / GA (R0) 1088 10-Feb 13-Feb 2-Mar 24-Feb 5-Mar
CBP / GA (R1) Pending
HVAC (R2) 1343 - 1-May 21-May - - C NCC Need to Resubmit
HVAC (R3) 3-Jul - -
Conduit Coordination 12-Jun - -
17th Floor
Coordination 15-Jul - -
CBP / GA (R0) 1100 13-Feb 14-Feb 2-Mar 24-Feb 5-Mar
CBP / GA (R1) Pending
HVAC (R2) 1343 - 1-May 21-May - - C NCC Need to Resubmit
HVAC (R3) 3-Jul - -
Conduit Coordination 17-Jun - -
18th Floor
Coordination 24-Jul - -
CBP / GA (R0) 1340 24-Apr 25-Apr 21-May 7-May 27-Apr
CBP / GA (R1) Pending
Electrical (R1) 22-Jun - -
ELV (R1) 22-Jun - -
Water Supply 25-Jun - -
Sewer ,Waste 25-Jun - -
Fire Protection (R1) 1374 - 20-May 26-May - - C
NCC Need to Resubmit
Fire Detection (R1) 1374 - 20-May 26-May - - C
19th Floor Fire Protection (R2) 30-Jun
Fire Detection (R2) 30-Jun
HVAC 20-Jul - -
Conduit Coordination 20-Jul - -
Coordination 20-Jul - -
CBP / GA (R0) 1383 23-May 25-May 26-May Pending Pending
Final CBP / GA
Electrical Pending - -
ELV Pending - -
Water Supply Pending - -
Sewer ,Waste Pending - -
Fire Protection 1111 15-Feb 17-Feb 24-Feb - - B
Roof Floor Fire Detection 1111 15-Feb 17-Feb 24-Feb - - B
HVAC Pending - -
Conduit Coordination Pending - -
Coordination Pending - -
CBP / GA (R0) 25-May Pending
Final CBP / GA
Electrical Pending - -
ELV Pending - -
Water Supply Pending - -
Sewer ,Waste Pending - -
Fire Protection Pending - -
LMR Floor Fire Detection Pending - -
HVAC Pending - -
Conduit Coordination Pending - -
Coordination Pending - -
CBP / GA (R0) 27-May Pending
Final CBP / GA

6/3/2020 @ SIMAKVIN DC
NCC NCC
Floor Drawing Type DTF No Submission Submitted BSEC CSEC SMA Status Remarks
date date

Lightning Protection Pending

Building Elevation (R0) 1368 - 16-May Pending 2-Jun Pending


Building Section (R0) 1373 - 20-May 21-May 22-May 27-May

Wall & Floor Finish (R0) 1375 20-May 21-May - - Pending


8th Floor
Lobby Ceiling (R0) 1381 21-May 22-May - - Pending
MockUp