(Technical Department)
1 VIP Villas
Activities on site not yet in progress
A‐47 (T1C1 Tunnel) Red Marking to submit PB0 QA / QC 13/08/2018
(tiling & ceiling)
drawings to be forwarded to
A‐94 (T1C1 Tunnel) Issued for Approval JLA 13/08/2018
subcontractor for affected items
Issued for Approval (PB0)
E‐48 (T2C2 Tunnel) JLA 13/08/2018
(WF‐009493)
Issued for Approval (PB0)
G‐110 (T3C1) JLA 13/08/2018
(WF‐009493)
Activities on site not yet in progress
D‐21 (T3C1 Tunnel) Red Marking to submit PB0 QA / QC 13/08/2018
(tiling & ceiling)
E‐40 (T3C1 Tunnel) Red Marking to submit PB0 QA / QC 13/08/2018
Activities on site not yet in progress
H‐11 (T3C2M) Red Marking to submit PB0 QA / QC 13/08/2018
(tiling & ceiling)
Activities on site not yet in progress
D‐52 (T3C2 Tunnel) Red Marking to submit PB0 QA / QC 13/08/2018
(tiling & ceiling)
Red Marking and levels from site to
2 External Works As‐Built Plans Site team 13/08/2018
prepare the drawings
3 As‐Built Villa Site Plans
ASME requires confirmation on their
response to ASME's email on 06‐aug‐
Precinct K,J,C KBR 09/08/2018 points highlighted as per KBR's
18
comments
as per ASME site survey is done,
Precinct A as‐built drawings submittal ASME 19/08/2018 drawings will be submitted this
week
Precinct H site preparation ATC (site team) 19/08/2018 site will be ready on 15‐Aug‐2018
to determine the level difference of
the villa plot and the landscape area received landscape levels from Mr.
7 H‐63 External Level TD 09/08/2018
to know whether to make retaining Jerbi
wall or not. TD to propose levels.