Architect BBS 7-Jul-20 J1-SCT-RFI-A11-E0206 GSTB-1.1 P2-Primer Application & Body Coat for Epoxy Slab 8.2 Primer Application/8.3 Filler Coat/Texture

Architect BBS 10-Jul-20 J1-SCT-RFI-A00-E0687 Shelter Pump of WT System-Epoxy Primer Application & Filler Coat/Texture for Gutter 8.2 Primer Application/8.3 Filler Coat/Texture

Architect BBS 17-Jul-20 J1-SCT-RFI-A00-E0694 CTEB- Painting Work for Wall (Out Side) 8.1 Surface Preparation/8.2 Primer Application/8.3 Filler Coat/Tetxture/8.4 Top Co

Architect BBS 5-Aug-20 J1-SCT-RFI-A21-E0269 PB.2.1 CPP Electrical Building-Ground Floor-Plastering & Render 7.1 Surface preparation,Marking & Bead Installation, 7.2 Plaster Application (1. T

Architect BBS 8-Aug-20 J1-SCT-RFI-A00-E0728 Admin Building-Surface Preparation for Roof Water Proofing 12.1 Surface Preparation

Architect BBS 8-Aug-20 J1-SCT-RFI-A00-E0732 BSDG Roof Top-Surface Preparation 12.1 Surface Preparation

Architect BBS 13-Aug-20 J1-SCT-RFI-A21-E0275 PB.2.1 CPP Electrical Building Ground Floor-Plastering & Render (Indoor) 7.1 Surface preparation,Marking & Bead Installation, 7.2 Plaster Application (1. T

Architect BBS 18-Aug-20 J1-SCT-RFI-A00-E0745 Shelter Pump of WT System-Epoxy Top Coat for Gutter 8.4 Top Coat (-Final Visual Condition/DFT)

Architect BBS 19-Aug-20 J1-SCT-RFI-A00-E0714-R1 MEB 3rd Floor FACADE (South Side) Visual Painting External Final Inspection 8.4 Top Coat (-Final Visual Condition/DFT)

Architect BBS 23-Aug-20 J1-SCT-RFI-A00-E0754-R1 CTEB- Apron GL# 1-4/A- Lean Concrete 3.1 Excavation Area, 2.1 Inspection for Formwork/ Pre-pouring, 2.2 Concrete Deliv

Architect BBS 27-Aug-20 J1-SCT-RFI-A00-E0761 MEB Façade 1st Floor (South Side) -External Painting-Primer Application, Body Coat & Final Coat8.2 Primer Application/Filler Coat Texture/8.3 Filler Coat/Texture/ 8.4 Top Coat (F

Architect BBS 31-Aug-20 J1-SCT-RFI-A21-E0288 GSTB-2.1 F4-Parapet Wall -Skirting 3.4 Form skirting and surface inspection and repair (if applicable)

Architect BBS 31-Aug-20 J1-SCT-RFI-A21-E0289 GSTB-2.1 P2-Slab-Surface Preparation for Epoxy 8.1 Surface Preparation