PROJECT : UPGRADATION OF GAS & CONDENSATE AT SOUTH KUWAIT AREA-II

CONTRACT NO.: 17051790 Date: 19/06/2018

COMPLIANCE STATEMENT REPORT (CSR) FOR Topographical Survey Drawings (KOC REF # 17051790/KC/L/088)

Action
S.NO Comments Reply
Code

COMMENTS

1) Correct the project tittle in the drawings as per contract. A Noted & Updated

Contractor shall check and ensure the correctness of the control The elevations are updated based on K-24 as supplied by Company
2) A
points listed in the drawing as per site condition. (KOC)

Check the listed control points as per conditions given in the


New Control Points will be established as the existing monument
3) clause 8.1 of KOC-C-004. Comply the requriment of clause 7.5 & A
values doesn't match using K-24 proposed Value (128.656)
831 of KOC-C-004.

17051790-E-S-6001 Contractor's survey shall cover all areas / site infromation's as


(Rev A) requried to carry out the HSE studies and new manifold area Noted & New manifold drainage system is surveyed as per the
1 4) A
(Sheet 1/17 to 10/17 & drainage system in accordance with clause 8.1.2.6 of appendix 4D requirements
13/17 to 17/17) to Annexure 7 to Technical Specification.
Contractor shall ensure that the submitted survey drawings are
The Survey drawings are updated based on Clause 7.8 & 8.5 for
5) complied with requirement listed in Clause 7.8 & 8.5 of KOC-C- A
Mapping
004.

Specify the detecting capability (depth of detection) of radio The detection capability is given in Legend under Notes in the
6) A
detection equipment RD8000 locator. drawing.

In the drawings, indicate the area of contaminated soils nearby/


across the proposed route and same to be verified & confirmed by The contaminated soil nearby/across the pipeline route is verified and
7) A
necessary tests as per Appendix-4F to Annexure-7 to the technical indicated in the drawings
Specification.

Page 1 of 5
PROJECT : UPGRADATION OF GAS & CONDENSATE AT SOUTH KUWAIT AREA-II

CONTRACT NO.: 17051790 Date: 19/06/2018

COMPLIANCE STATEMENT REPORT (CSR) FOR Topographical Survey Drawings (KOC REF # 17051790/KC/L/088)

Action
S.NO Comments Reply
Code
Contractor shall show detail of road crossing (asphalt road,gatch
8) road) either in sheet 1/17 of subject drawing or drawing 17051790- A Noted & Updated
E-S-6002
Check the requiremnet of protection for track road crossing
9) nearby GC-04 car parking shed as per condition. Also check the A Width of Road crossings are verified and updated
width of road crossing (point id 2 & 3) as per site condition
In the sheet 1/17, inculde the details of road crossing for the drain
10) A Noted & Updated
line from MF/C1 to burn pit.

Show all missing area of contaminated soil in the sheet 3/17,4/17


17051790-E-S-6001 11) 8/17(around MF/C3 area ), 9/17,10/17,17/17 as per site A Noted & Updated
(Rev A) conditions. Also specify the area of contaminated soil piles in the
1 sheet 6/17, 9/17.
(Sheet 1/17 to 10/17 &
13/17 to 17/17) Check the road type for point id 8,34,48,60,66 as per site
12) A Noted & Updated
condition
Check the presence of pipeway/Flowlines next to point id 13 as
13) A Noted & Updated
per site condition.
In the sheet 7/17, show the survey details for the route of LP-10B
14) & LP-10A inculding details of road crossing and contaminated A Noted & Updated
soil areas.
Show detail of road crossing for the FG & HP line from MF/C3 to
15) GC21 in the sheet 7/17 and drain line from MF/S2 to drain pit in A Noted & Updated
the sheet 9/17

Page 2 of 5
PROJECT : UPGRADATION OF GAS & CONDENSATE AT SOUTH KUWAIT AREA-II

CONTRACT NO.: 17051790 Date: 19/06/2018

COMPLIANCE STATEMENT REPORT (CSR) FOR Topographical Survey Drawings (KOC REF # 17051790/KC/L/088)

Action
S.NO Comments Reply
Code
MF/C2 area shown partially in the two sheets. Contactor shall set
16) the drawing limit to have complete MF/C2 in one sheet for more A Noted & Updated
clarity.

Specify clearly kind of bund such as dumped soil, contaminated


17) A Noted & Updated
sand piles,berm,etc, Wherever bund indicated in the drawings.

Show missing road crossing detail for the asphalt & gatch road
nearby GC07 & GC08 high security fence in the sheet 9/17 &
18) 17/17 respectively.Also show the missing asphalt road nearby A Noted & Updated
MF/C7L, UG cable before point ID 36, IP Coordinate next to
Gulfspic site office in the sheet 9/17.
17051790-E-S-6001
(Rev A) In the sheet 13/17, show the survey details for the route of FG-
1
(Sheet 1/17 to 10/17 & 19) 29A including details of road crossing and contaminated soil A Noted & Updated
13/17 to 17/17) areas.

In the sheet 15/17, Show the survey details for the route of FG-
20) 29A Including details of road crossing and contaminated soil A Noted & Updated
areas.

Contractor shall clarify that the coordinates given for each point
The co-ordinates of each point Id of road crossing table refers to the
21) ID of road crossing table refers to which line in case of pipeline A
center line of the corridor.
corridor consisting more than one pipeline

In case of existing pipeline berm,contaminated piles, dumped soil,


22) specify the same clearly in the drawing instead of stating bund as A Noted & Updated
common.

Page 3 of 5
PROJECT : UPGRADATION OF GAS & CONDENSATE AT SOUTH KUWAIT AREA-II

CONTRACT NO.: 17051790 Date: 19/06/2018

COMPLIANCE STATEMENT REPORT (CSR) FOR Topographical Survey Drawings (KOC REF # 17051790/KC/L/088)

Action
S.NO Comments Reply
Code
Contractor shall clarify mark the location of nearby burn pits as
23) per site condition. Draw number of Flowlines in the drawing A Noted & Updated
instead of showing start & end flowline

Contractor shall clarify the OFC line specified in legends of the OFC is nothing but Optical Fibre Cable. However now its updated as
24) A
drawing. Include legend for oily area boundary line. FOC

Contractor shall update the depth of existing underground services Depth of services will be updated based on slit trench report in Profile
25) N
in the drawings based on his slit trenching works. drawings

17051790-E-S-6001 Contractor shall either update subject drawing or submit separate


(Rev A) survey drawing with following details.
1
(Sheet 1/17 to 10/17 & i) Route survey for pipeline/piping from pig trap to tie-in
13/17 to 17/17) location ( GC's/BS's)
i) Noted & will submit a separate drawings for Tie-Ins
ii) Survey layout plan for Access road from new manifold
ii) Noted, will submit a separate drawing along with Civil drawings.
26) to nearby existing road A
iii) These details will be covered in Civil (Manifold Layout Drawings)
iii) Site Grading details for New manifold locations &
iv) Noted, will include in access road for New manifold drawings.
surrounding areas in compliance with clause 7.2 of KOC-C-004 in
order to design the drainage arrangement & to fix finished grade
level for new manifold areas.
iv) Drain line route from pig trap to burn pits wherever missing.

Submit the survey report as per clause 12.1.1 of Technical


27) A Noted & Survey report enclosed
specification & 10.3 of KOC-C-004.

Page 4 of 5
PROJECT : UPGRADATION OF GAS & CONDENSATE AT SOUTH KUWAIT AREA-II

CONTRACT NO.: 17051790 Date: 19/06/2018

COMPLIANCE STATEMENT REPORT (CSR) FOR Topographical Survey Drawings (KOC REF # 17051790/KC/L/088)

Action
S.NO Comments Reply
Code

17051790-E-S-6001 Submit the missing survey drawing sheet 11/17 & 12/17 for Rev-A submitted and the comments are updated in Rev-B (17
1 28) A
(Rev A) company review Sheets)

ACTION CODES: A - CONCUR; B - CLARIFICATION PROVIDED; N - NON-CONCUR