COMPLIANCE STATEMENT REPORT (CSR) FOR Topographical Survey Drawings (KOC REF # 17051790/KC/L/088)
Action
S.NO Comments Reply
Code
COMMENTS
1) Correct the project tittle in the drawings as per contract. A Noted & Updated
Contractor shall check and ensure the correctness of the control The elevations are updated based on K-24 as supplied by Company
2) A
points listed in the drawing as per site condition. (KOC)
Specify the detecting capability (depth of detection) of radio The detection capability is given in Legend under Notes in the
6) A
detection equipment RD8000 locator. drawing.
Page 1 of 5
PROJECT : UPGRADATION OF GAS & CONDENSATE AT SOUTH KUWAIT AREA-II
COMPLIANCE STATEMENT REPORT (CSR) FOR Topographical Survey Drawings (KOC REF # 17051790/KC/L/088)
Action
S.NO Comments Reply
Code
Contractor shall show detail of road crossing (asphalt road,gatch
8) road) either in sheet 1/17 of subject drawing or drawing 17051790- A Noted & Updated
E-S-6002
Check the requiremnet of protection for track road crossing
9) nearby GC-04 car parking shed as per condition. Also check the A Width of Road crossings are verified and updated
width of road crossing (point id 2 & 3) as per site condition
In the sheet 1/17, inculde the details of road crossing for the drain
10) A Noted & Updated
line from MF/C1 to burn pit.
Page 2 of 5
PROJECT : UPGRADATION OF GAS & CONDENSATE AT SOUTH KUWAIT AREA-II
COMPLIANCE STATEMENT REPORT (CSR) FOR Topographical Survey Drawings (KOC REF # 17051790/KC/L/088)
Action
S.NO Comments Reply
Code
MF/C2 area shown partially in the two sheets. Contactor shall set
16) the drawing limit to have complete MF/C2 in one sheet for more A Noted & Updated
clarity.
Show missing road crossing detail for the asphalt & gatch road
nearby GC07 & GC08 high security fence in the sheet 9/17 &
18) 17/17 respectively.Also show the missing asphalt road nearby A Noted & Updated
MF/C7L, UG cable before point ID 36, IP Coordinate next to
Gulfspic site office in the sheet 9/17.
17051790-E-S-6001
(Rev A) In the sheet 13/17, show the survey details for the route of FG-
1
(Sheet 1/17 to 10/17 & 19) 29A including details of road crossing and contaminated soil A Noted & Updated
13/17 to 17/17) areas.
In the sheet 15/17, Show the survey details for the route of FG-
20) 29A Including details of road crossing and contaminated soil A Noted & Updated
areas.
Contractor shall clarify that the coordinates given for each point
The co-ordinates of each point Id of road crossing table refers to the
21) ID of road crossing table refers to which line in case of pipeline A
center line of the corridor.
corridor consisting more than one pipeline
Page 3 of 5
PROJECT : UPGRADATION OF GAS & CONDENSATE AT SOUTH KUWAIT AREA-II
COMPLIANCE STATEMENT REPORT (CSR) FOR Topographical Survey Drawings (KOC REF # 17051790/KC/L/088)
Action
S.NO Comments Reply
Code
Contractor shall clarify mark the location of nearby burn pits as
23) per site condition. Draw number of Flowlines in the drawing A Noted & Updated
instead of showing start & end flowline
Contractor shall clarify the OFC line specified in legends of the OFC is nothing but Optical Fibre Cable. However now its updated as
24) A
drawing. Include legend for oily area boundary line. FOC
Contractor shall update the depth of existing underground services Depth of services will be updated based on slit trench report in Profile
25) N
in the drawings based on his slit trenching works. drawings
Page 4 of 5
PROJECT : UPGRADATION OF GAS & CONDENSATE AT SOUTH KUWAIT AREA-II
COMPLIANCE STATEMENT REPORT (CSR) FOR Topographical Survey Drawings (KOC REF # 17051790/KC/L/088)
Action
S.NO Comments Reply
Code
17051790-E-S-6001 Submit the missing survey drawing sheet 11/17 & 12/17 for Rev-A submitted and the comments are updated in Rev-B (17
1 28) A
(Rev A) company review Sheets)
Page 5 of 5