Material Status in RCJ Project
11 Square & Octagonal Steel Box ABK (RACO) Code 1 we sent letter to PD
ABK Code 1 we sent letter to PD
12 Pull/Junction Boxes
ALFAREED Stars Code 1 we sent letter to PD
13 Cable Trays Power Solution Code 1 we sent letter to PD
1 of 26
ELECTRICAL Materials DIV.16 - RCJ
Material Status in RCJ Project
2 of 26
ELECTRICAL Materials DIV.16 - RCJ
Material Status in RCJ Project
3 of 26
ELECTRICAL Materials DIV.16 - RCJ
Material Status in RCJ Project
4 of 26
Non Approved Material in RCJ Project - Electrical
# Material # Supplier's Name Action Code Status of TS Remarks
9 Lighting Fixtures,indoor & Outdoor 1 National Lighting Code 3 Under review We send type I & IE on 29/12/2020 , also outdoor
lighting fixtures was sent to the site.
5 of 26
Non Approved Material in RCJ Project - Electrical
# Material # Supplier's Name Action Code Status of TS Remarks
12 2 HBS - Under review They will send by this week , UPS TS for data and
comm. Racks & Data network TS.
13 UPS for data network 1 HBS - Preparing sub Preparing as per RC Requierments
14 TV System 1 HBS - Preparing sub
1 HBS - Preparing Sub Supplier working on it
15 Puplic Address 2
3
1 HBS - Preparing Sub Supplier working on it
16 Access Control 2
3
1 HBS - Bodet - Preparing Sub the supplier will revise the TS as per RC requierments
17 Master Clock System
3
1 HBS - Preparing Sub Supplier working on it
18 IP CCTV System 2
3
1 HBS - Preparing Sub prepare the revised
19 Fire Alarm System 2
3
20 Low Current Cables for MATV 1 SAUDI Media (FRACARRO) At Site Hold by FTCO will be submitted along with the submittal of the MATV
6 of 26
Pending Materials At site
# Description Supplier / Manufacturer Code TS Status Remarks
preparing REV02 and will update as soon as receive feedback from supplier
1 Under Floor Trunking ABK - MK Code 2 Preparing Resub.
ABK - GE Code 2 Preparing Resub. supplier delayed much time to submit Rev0, already approved by EMAFCO ABB
6 Structure Cabling System HBS Code 3 At Site the TS is at site and the sample board too
7 Fire Alarm System HBS Code 2 At Site as per log sheet, not submitted yet however we sent at site since 18/5/2021
8 Data network HBS Code 2 Hold RC team will prepare a new design, the HAUWAI sytem is approved
9 Ligthing Fixtures NATIONAL Lighting At Site the site is deal direct with the supplier
Low Current System - TS Status
# Description Supplier Status
1 UPS for data network HBS Preparing sub
2 TV system HBS Preparing sub
3 Puplic Address HBS Preparing sub
4 Access Control HBS At Site
5 Master Clock System HBS Preparing Sub
6 IP CCTV System HBS At Site
LV Panel Boards TS
# Panel Type Supplier Status
1 ACB EMAFCO At Site
2 MSB EMAFCO At Site
3 DP EMAFCO Preparing Sub
4 MDP EMAFCO Preparing Sub
5 SLP EMAFCO Preparing Sub
6 TEB EMAFCO Preparing Sub
7 PP EMAFCO Preparing Sub
em - TS Status
Remarks
g Fixtures TS
Remarks
Follow comments
Follow comments
Follow comments
Follow comments
Follow comments
Follow comments
g Fixtures TS
Remarks
oards TS
Remarks
MADINAH HAJJ CITY - PACKAGE 1
ELECTRICAL MATERIAL READY FOR MANUFACTURING
Discipline: ELECTRICAL Date: October 17, 2016
S. Item Description Supplier's Name Material Status Status for Manufacturing
No.
MV SWITCHGEAR AL FANAR APPROVED
METERING RING MAIN UNIT AL FANAR APPROVED INITIAL APPROVAL - SEC DATA REQUIRED
SECONDARY UNIT SUBSTATION Al FANAR APPROVED INITIAL APPROVAL - SUBJECT TO SEC APPROVAL
WIRING DEVICES -
POWER SOCKET OUTLETS AND AL FANAR (CONTACTUM) APPROVED BOQ AS PER SITE REQUIREMENTS
LIGHTING WITCHES
WIRING DEVICES - ABDULKARIM (HONEYWELL) APPROVED BOQ AS PER SITE REQUIREMENTS
TYPE R15
WIRING DEVICES -
INDUSTRIAL SOCKET OUTLETS ELECTRIC HOUSE (LEGRAND) APPROVED BOQ AS PER SITE REQUIREMENTS
TYPE R41 & R45
WIRING DEVICES - INITIAL APPROVAL - APPROVED MODULE FROM
TELECOMMUNICATION OUTLET AL FANAR (CONTACTUM) APPROVED APPROVED STRUCTURED CABLING
(FACE PLATES & FRAMES ONLY)
MAGNETIC MICRO SWITCH ABDULKARIM (HONEYWELL) APPROVED BOQ AS PER SITE REQUIREMENTS
FLOOR BOXES AND ACCESSORIES ABDULKARIM (MK) APPROVED INITIAL APPROVAL - SUBJECT TO THE NEXT
REPLY TO COMMENTS & SAMPLE
TT1 - LANDSCAPE LIGHTING POLE INITIAL APPROVAL - SUBJECT TO CALCULATION
AND FIXTURE AL NASSER APPROVED AND SAMPLE APPROVAL
STREET LIGHTING POLES AND
LUMINAIRES AL BABTAIN APPROVED INITIAL APPROVAL - SAMPLE APPROVAL
PRECAST CONCRETE MANHOLE SULB AL JAZEERA APPROVED INITIAL APPROVAL - SUBJECT TO SAMPLE
AND HAND HOLE
LOW CURRENT CABLES -
FIBER OPTIC CABLE FOR MV MEFC APPROVED INITIAL APPROVAL - SUBJECT TO SEC APPROVAL
NETWORK
14 of 26
MADINAH HAJJ CITY - PACKAGE 1
ELECTRICAL MATERIAL READY FOR MANUFACTURING
Discipline: ELECTRICAL Date: October 17, 2016
S. LOW CURRENT CABLES -
Item Description Supplier's Name Material Status Status for Manufacturing
No. FIRE ALARM CABLES
CONTROL LINK (NORDEN) APPROVED BOQ AS PER SITE REQUIREMENTS
LOW CURRENT CABLES - RASA (BELDEN) APPROVED BOQ AS PER SITE REQUIREMENTS
LIGHTING CONTROL
APPROVED
UNDER REVIEW
NOT APPROVED
NO SUPPLIER
15 of 26
MATERIAL SUBMITTAL STATUS REPORT - PACKAGE 2
Discipline: ELECTRICAL Date: October 17, 2016
S. Supplier
Item Description Supplier's Name L.O.I Date Material Status Remarks
No. No.
2 METERING RING MAIN UNIT 1 AL FANAR 16-NOV-15 APPROVED
1 ELSEWEDY APPROVED
1 KONE APPROVED
8 ELEVATORS 2
16 of 26
MATERIAL SUBMITTAL STATUS REPORT - PACKAGE 2
Discipline: ELECTRICAL Date: October 17, 2016
S. Supplier
10 MOTOR
No.
CONTROL
Item
STARTERS (MCC)
CENTER &
Description
No.
Supplier's Name L.O.I Date Material Status Remarks
17 of 26
MATERIAL SUBMITTAL STATUS REPORT - PACKAGE 2
Discipline: ELECTRICAL Date: October 17, 2016
S. Supplier
Item Description Supplier's Name L.O.I Date Material Status Remarks
No. No.
EMAIL CONSULTANT COMMENTS - NO DATE
1 L&T 5-APR-16 NOT APPROVED SUPPLIER NOT SUBMITTING
13 SYNCHRONIZATION PANEL 2
18 of 26
MATERIAL SUBMITTAL STATUS REPORT - PACKAGE 2
Discipline: ELECTRICAL Date: October 17, 2016
S. Supplier
Item Description Supplier's Name L.O.I Date Material Status Remarks
No. No.
EMAIL CONSULTANT COMMENTS - NO DATE
1 L&T 5-APR-16 NOT APPROVED SUPPLIER NOT SUBMITTING
16 FEEDER PILLAR 2
19 CENTRAL
LIGHTS
BATTERY SYSTEM & EXIT 2
19 of 26
MATERIAL SUBMITTAL STATUS REPORT - PACKAGE 2
Discipline: ELECTRICAL Date: October 17, 2016
S. SYSTEM & EXIT Supplier
19 CENTRAL
No. LIGHTS
BATTERY
Item Description
No.
Supplier's Name L.O.I Date Material Status Remarks
20 DISCONNECT SWICTHES 2
1 ELECTRIC HOUSE (LEGRAND) 23-DEC-15 APPROVED APPROVED: TYPE R31, 32, R41 & R45
20 of 26
MATERIAL SUBMITTAL STATUS REPORT - PACKAGE 2
Discipline: ELECTRICAL Date: October 17, 2016
S. Supplier
Item Description Supplier's Name L.O.I Date Material Status Remarks
No. No.
1 ELECTRIC HOUSE (LEGRAND) N/A NOT IN THE LEGRAND PRODUCT RANGE
21 of 26
MATERIAL SUBMITTAL STATUS REPORT - PACKAGE 2
Discipline: ELECTRICAL Date: October 17, 2016
S. Supplier
Item Description Supplier's Name L.O.I Date Material Status Remarks
No. No.
1
29 DATA COMMUNICATION 2
EQUIPMENTS
30 IP BASED TELEPHONY 2
22 of 26
MATERIAL SUBMITTAL STATUS REPORT - PACKAGE 2
Discipline: ELECTRICAL Date: October 17, 2016
S. Supplier
Item Description Supplier's Name L.O.I Date Material Status Remarks
No. No.
1 INMAA TECHNOLOGIES (BOUYER) 04-OCT-16 NOT APPROVED UNDER PREPARATION - 13-OCT-16
35 CLOCK SYSTEM 2
23 of 26
MATERIAL SUBMITTAL STATUS REPORT - PACKAGE 2
Discipline: ELECTRICAL Date: October 17, 2016
S. Supplier
Item Description
38 ROOM MANAGEMENT SYSTEM Supplier's Name L.O.I Date Material Status Remarks
No. No.
3
1 BTC (HONEYWELL) AS PER ENGR. UMAR NOT APPROVED CONSULTANT COMMENTS - NO DATE
24-MAY-16
40 IP CCTV SYSTEM 2
24 of 26
MATERIAL SUBMITTAL STATUS REPORT - PACKAGE 2
Discipline: ELECTRICAL Date: October 17, 2016
S. Supplier
ItemSYSTEM
43 FIRE ALARM Description Supplier's Name L.O.I Date Material Status Remarks
No. No.
3
25 of 26
MATERIAL SUBMITTAL STATUS REPORT - PACKAGE 2
Discipline: ELECTRICAL Date: October 17, 2016
S. Supplier
Item Description Supplier's Name L.O.I Date Material Status Remarks
No. No.
1 CONTROL LINK (NORDEN) EMAIL NOT APPROVED UNDER PREPARATION - THURSDAY, 13-OCT-16
44 LOW CURRENT CABLES - 2 AL RAJHI TELECOM (BT CABLES) EMAIL NOT APPROVED UNDER PREPARATION - NO DATE
FIRE ALARM CABLES
1 CONTROL LINK (NORDEN) EMAIL NOT APPROVED UNDER PREPARATION - THURSDAY, 13-OCT-16
APPROVED 13
UNDER REVIEW 1
NOT APPROVED 18
NO SUPPLIER 8