Design, Supply and Installation of Medium Voltage Networks and Last Mile Consumer Connections

CLIENT: REA PROJECT Lot-11 Priority Rural Electrification Works in Central Service and Northwestern Service Territories.
REA-AfDB/WRKS/18-19/00627
CONSULTANT: M&E Associates DISTRICT MUKONO UTM Zone 36N Voltage kV 11
CONTRACTOR: STEG-IS SCHEME Nakawala-kikuuta--Kyegalaso
LV POLE SCHEDULE VILLAGE KYEGALASO TC

Cumulati
No of 9m Angle of Span Normal Short
Pole ID Type of Structure Exi. MV ve Easting Northing Earthing Earthing System
Phases Medium Dev. Ahead Stay Stay
Distance
CIRCUIT A
P-19A 50kVA S/S 0 491352 44981
1 Tee off from Strain 3P 1 21 25 25 491361 44957 2 1 LV 1st P after TRF
2 Suspension (0-5) 3P 1 0 50 75 491395 44920
3 End of 3P / Start of SP (0-60) 3P 1 0 50 125 491428 44882 1 1 LV P Binding
4 Suspension (0-5) SP 1 0 51 176 491462 44844
5 Strain Asembly (60-90) SP 1 84 52 228 491497 44805 2 1 LV P Binding
6 X Intermediate - Intermadiate SP 1 89 21 249 491512 44821 2 1 LV P Binding
7 Terminal SP 1 47 296 491477 44853 1 1 LV P Terminal
6 296 491512 44821
8 Terminal SP 1 47 343 491542 44785 1 1 LV P Terminal
6 343 491512 44821
9 Strain Asembly (60-90) SP 1 87 16 359 491524 44831 2
10 Terminal SP 1 42 401 491495 44862 1 1 LV P Terminal
1 401 491361 44957
11 Suspension (5-30) SP 1 19 18 419 491376 44967 1
12 Tee off from Strain SP 1 18 45 464 491420 44979 2 1 LV P Binding
13 Suspension (0-5) SP 1 0 45 509 491458 45004
14 Suspension (5-30) SP 1 28 48 557 491498 45030 1 1 LV P Binding
15 Terminal SP 1 30 587 491528 45032 1 1 LV P Terminal
12 587 491420 44979
16 Suspension (0-5) SP 1 0 45 632 491459 44958
17 Suspension (0-5) SP 1 0 55 687 491508 44933 1 LV P Binding
18 Tee off from intermediate SP 1 0 49 736 491552 44910 1 1 LV P Binding
19 Suspension (0-5) SP 1 3 47 783 491594 44888
20 Terminal SP 1 39 822 491629 44872 1 1 LV P Terminal
18 822 491552 44910
21 Tee off from intermediate SP 1 62 52 874 491569 44960 1 1 LV P Binding
22 Terminal SP 1 43 917 491539 44990 1 1 LV P Terminal
21 917 491569 44960
23 Strain Asembly (60-90) SP 1 87 47 964 491583 45004 2
24 Terminal SP 1 43 1007 491624 44989 1 1 LV P Terminal

CIRCUIT B
P-19A 50kVA S/S 3P 0 491352 44981
25 Suspension (5-30) 3P 1 23 14 14 491348 44994 1 1 LV 1st P after TRF
26 X Intermediate - Strain 3P 1 76 15 29 491350 45008 2 1 LV P Binding
27 Terminal SP 1 48 77 491398 45015 1 1 LV P Terminal
26 77 491350 45008
28 Tee off from intermediate SP 1 64 16 93 491336 45017 1 1 LV P Binding
MV/P-20 Suspension (5-30) SP 1 17 21 114 491333 44997 1
MV/P-19 Strain Asembly (60-90) SP 1 74 20 134 491337 44977 2 1 Ex MV P Binding
29 Terminal SP 1 27 161 491312 44965 1 1 LV P Terminal
26 161 491350 45008
30 End of 3P / Start of SP (0-60) 3P 1 2 51 212 491357 45059 1
31 Suspension (0-5) SP 1 1 57 269 491367 45115 1 LV P Binding
32 Suspension (5-30) SP 1 5 54 323 491375 45168 1
33 Terminal SP 1 46 369 491387 45212 1 1 LV P Terminal
28 369 491336 45017
34 Suspension (0-5) SP 1 0 51 420 491344 45067
35 Tee off from intermediate SP 1 0 57 477 491354 45124 1 1 LV P Binding
36 Suspension (5-30) SP 1 5 48 525 491362 45171 1
37 Suspension (0-5) SP 1 5 46 571 491373 45216 1 LV P Binding
38 Terminal SP 1 33 604 491384 45247 1 1 LV P Terminal
35 604 491354 45124
39 Strain Asembly (60-90) SP 1 78 42 646 491312 45128 2
40 Suspension (0-5) SP 1 0 42 688 491325 45169 1 LV P Binding
41 Strain Asembly (30-60) SP 1 51 41 729 491338 45208 1
42 Terminal SP 1 38 767 491318 45239 1 1 LV P Terminal