You are on page 1of 14

Dof Nankojje village

P-1
LINE OPERATOR:UMEME
MV LENGTH=3.670kM
P-2

t off ex

P-3

Sheet 1
P-4

P-5

P-6

P-7
A
IY M
RE
YE
BA

p
AM

am
sw
DD

34
Start Of Sheet 2
End Of Sheet 1

33

JO P-08
SE
PH
SS
EK
Legend: New overhead line LV New line ABC-3x50+54.6mm 2 LV New wooden pole Air break switch Meter unit MV and LV Stay type 1 (Conventional stay assembly) MV and LV New earthing Control Point Clerk 1880
AT Existing line New transformer New MV wooden pole Load break switch
AW MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960
A
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser Utm Zone 36N
MV and LV Stay type 3 (Flying stay assembly)
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 1 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
SEMAKULA GIPSON
103 52

Y
MAZOYA IVAN KYEYUME

BA
104 MAYANJA PASCAL OWORI

AM
S
98

CI

DD
MAGOMA WASWA 37

AN
AKECHI GETRUDE
Start Of Sheet 3

FR
101 VINCENT
WASWA DAVID End Of Sheet 2

BI
105 49 34

IM
GUUBI CHARLES

O
NAKITYENDE R 36

PS

Start Of Sheet 2
US
NSUBUGA ANTHONY

GI
53

L
WA
97 PHILLIP
N

A
106 BE
35

L
NAKKU T 51 33

KU
NAKIWALA JAME MAZIZIBU
E
H MY

MA
48 LE
C
50 UR

E
100 YA

SS
KAYAGA EDITH CH I
NJA J
EZ
NANYU
NT
MUKASA CONSTANTIN 54 ON IM
EL
107 OJAMBA
LS JO P-08
WASWA DAVID 47 WI P-09 SE
96 TO PH
OJUMA WA 32 SS
31 EK
B
109 AKUMU LILLIAN SE AT
99 S
AW
DI GEOFREY A
MA
YA 30

Sheet 2
KIZZA REGINA 108 K 92 ADIKIMI 46
SA
93 P-10
KA NA
GEOFREY LU
BALABA BATESITA BW
AWORI AM
29 A
MPOORA GEOFREY SP
84 94 MU EC
PHILIP 45 27 KA IO
L ZA
KI AZI
KATENDE ZZ IN
28 MU A
NAMUBIRU EDITH SIMON OCHO MU BI YO NOC
83 FUTURE HOPE NURS. |& PRI. SCH. P-11 BI RU SAM ENT
85 RU TO U
PHILIP ED NN
NANDAWULA SYLIVIA WA Y
95 43 26 RD
44
82
PAUL
86 MUKIIBI DAN
NA
-3 N
DA
PAUL
A
M
RIA 81 P-15 P-12 MU
KU
WU
LA
A M NA NG
NAMUBIRU IMMY ANJ KA U SA
87 NA N K
Dof -2 25 NZ
A
AB
AS
FI
NA
ESTHER
80
P-15 I
89
KIVUMU LIVINGSTONE
IAM
88 MAR -2A P-13
JA
P-18
SSALI VINCENT 20
23
KAN
NAN L 1 -1
90 PAU P-15
ESTHER
OO ZA WINO 22
KAK MA A ANJA
STA FATU A M NANK LU BUKENYA DIRISA
I MARI
BAT Y PETER
WA
RI
ZIB
WE
I MBA I S TANL P-14 RA
KA AS SAL 24
A K JU
91 SUL 2 LI
US
4 ABAS
U RONALD 18
21
SSEBUF 3 20
VICENT ANNET
SEBUFU SS
EM
ZAWEDDE PI
RI
7 RO
5
Dof
P-15
NA
LD
SA
LO
8 6 NG
O
SAM MUTYABA
SEMWOGERELE FRED
P-16
NABASIRYE AGNES
9
TUKAMUHEBWA JOVULET

P-17

10

P-18
End Of Sheet 2
11
Start Of Sheet 5
Legend: New overhead line LV New line ABC-3x50+54.6mm 2 LV New wooden pole Air break switch Meter unit MV and LV Stay type 1 (Conventional stay assembly) MV and LV New earthing Control Point Clerk 1880
Existing line New transformer New MV wooden pole Load break switch MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser MV and LV Stay type 3 (Flying stay assembly) Utm Zone 36N
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 2 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
73
AWINO JUSTINE

72

71

70
NABAHIRWA DOMITRIA
MIRAGIRE EMANUEL
69
75

Sheet 3 68
Start Of Sheet 4
End Of Sheet 3

76
74
OW
OR
I
67 79 77 NABATANZI HARIENT
AROM SEBUNYA

65 66 78

L
UE
M AN 64
E
E
IR
RAG
MI

TX:50KVA KAWUTUTU TC 62 63
MIRAGIRE EMANUEL

61 OLWENYI FRANCIS
SEMAKULA GIPSON

60
OLWENYI FRANCIS 42

IANO
UBUGA

59 41
NANTONGO SARAH NS

58
40
122 115
113
KASOZI KAVUMA VICENT 57

EDENYA
112 39
56
OSINDE MOSES
116 114
111 AROM SEBUNYA
55
SSEBUTIMBIRI SAM 38
110 KABASINGA
102 SEMAKULA GIPSON
103 52
MAZOYA IVAN KYEYUME
104 MAYANJA PASCAL OWORI

S
98

CI
MAGOMA WASWA 37
KATONOKO EDWRD

AN
AKECHI GETRUDE
Start Of Sheet 3

FR
101 VINCENT
105 49 WASWA DAVID End Of Sheet 2

N
GUUBI CHARLES

SO
NAKITYENDE R 36
NSUBUGA ANTHONY

P
LV New wooden pole Air break switch MV and LV Stay type 1 (Conventional stay assembly)

GI
Legend: New overhead line LV New line ABC-3x50+54.6mm 2
Meter unit MV and LV New earthing Control Point Clerk 1880
Existing line New transformer New MV wooden pole Load break switch

LA
MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960

KU
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser MV and LV Stay type 3 (Flying stay assembly) Utm Zone 36N

A
EM
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 3 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
SSALI JONATHERN

147
146

145 KYIFUKO JOHN


148

KIYAGA ALOYSIUS
144
NAMUBIRU

143
142
SSEMWOGERE LARWENCE
141

140
MNAMUGENYI MANGADALENA

Start Of Sheet 4
End Of Sheet 3
KATENDE CHARLES OCHERI POSIANO
OKEYA DAMYANO 132
KEJI FLORENCE NDAGIRE COTIDA
138 KIYAGA DAVID
KIYAGA DAVID 133 134
BIYINZIKA AIDAH 136
LUGUDDE 131 135

Sheet 4
139
137

130

129

SSERUNKUMA EDGAR
TX
128 MUSISI MOSES
126

MUGERWA FRED
127 125
NYANFAMBA ROSE

OCHERI POSIANO
124

123

122

LUBOWA EDWARD WEDENYA


KASIMBA SULAIMAN
NAMBI HARRIET 116 114
SSEKIBULE BENARD 118 117
119
120

ATYANYI FLORENCE 121

Legend: New overhead line LV New line ABC-3x50+54.6mm 2 LV New wooden pole Air break switch Meter unit MV and LV Stay type 1 (Conventional stay assembly) MV and LV New earthing Control Point Clerk 1880
Existing line New transformer New MV wooden pole Load break switch MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser MV and LV Stay type 3 (Flying stay assembly) Utm Zone 36N
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 4 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
NAMUSISI BETTY 46 P-18
End Of Sheet 2
43
44
11
Start Of Sheet 5
41 42
38
45
P-19

EPHEN
37 NTALE RICHARD
12

P-20

34 NALUBEGA SAFIIMA 13

OKOTH VALENTINE MONDA HENRY


14
NAMUGOSA BEATRICE
33
NYOMBI SHAIBA
15
EDWARD P-21

Sheet 5
NANYONJO EDISA
15 KAWUKA DENIS
14 16
17
P-31 SSEBANDEKE RICHARD SSEBANDEKE RICHARD

SSEBANDEKE RICHARD
P-22
RU DAVID 18
16
17

Start Of Sheet 6
19

End Of Sheet 5
NAH KISOOKA RICHARD
18
P-30
P-23
21

19 20 MUWANGUZI JIMMY
NYACHO TEREZA

SSEBANDEKE RICHARD

P-29
32
P-24
SALI ABEY SEEKA
BABIRYE FROLENCE 22
31
MUBIRU PATRICK

P-28 23
P-27 24 P-25
P-26 25
NAMUTEBI SPECIOZA

MUBIRU PATRICK
KANYIKE PATRICK
26
27

28

KAYODI PETUA
29

30
SSEBANDEKE RICHARD
Legend: New overhead line LV New line ABC-3x50+54.6mm 2
LV New wooden pole Air break switch Meter unit MV and LV Stay type 1 (Conventional stay assembly) MV and LV New earthing Control Point Clerk 1880
Existing line New transformer New MV wooden pole Load break switch MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser MV and LV Stay type 3 (Flying stay assembly) Utm Zone 36N
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 5 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
78
WAMALA ANTONY OCHIENGE HAMUDAH
79 EPURU JULIUS
NANZIRI EVA 80 MAGENDA LAMEKA
77 81 82
WAMALA ANTONY
KIYAGA DAVID
76
MACUMI JOHN BOSCO 62
WANDA STEVEN
83

84
AWORI TEDDY 75 61
SAMPLIYA ROBINA

74
KATABIRA JOHN

NSANJA SHAFIC
53
Sheet 6 57
ODOI MILTON
60

MAKYALI JULIUS

63
64
LUKYAMUZI DAVIS

65
66
NEZA FRANK

67

EGESA JOHN 59
EKEYA DEO 58 KAVUMA VICENT
52 L A
73 AL
UD 56
SSEMAMBO JOHN AB 55
TOPHER RICHARD KAKWEZI SSERYANGA JONAH GA 54 48
E ATUHAIRE TAKIA
70 T ER 40 47
72 A KA KATEREGA ABUDALLA BUSULWA MUHAMAD
DEL

MUWONGE LARWENCE
LUGAYIZI LAJAB ORINDA ALEX
WAN

71 MUTESI REEM 51
NAMUSWE FRANCIS NAMUSISI BETTY 46
69 50 NANGOBI HARRIET
UL
PA 44
O
RUG G A 42
43
SE UN 49
CIS

38 41
68 MP 39
N

TH 45
FRA

P-38 P-37A BE
Y

ZA NI
FRE

I KI
EL
ERA

85 BYAKATONDA STEPHEN
O AD
GOD

A L 1 EN YA 37
D

HI LI NTALE RICHARD
N

WEK AT TI
A

B
UMA

U IN
Dof
W

M
87 2 DIM
OJ

P-37 DE 4 NG
O
SAN GRAVE YARD 3 YA KANYAMUHEZA KALOLI
89 88 AN
E
IK
OJAMB

NY
86 RCH KA 34
CHU 36 35
P-36
O JOS

90 P-35
11 OKOTH VALENTINE
MWESIGYE JUSTINE
EPH

P-34
12 33
ARY 5
T
RE

P-33
AC

13 EDWARD
GA

NANYONJO EDISA
IS

P-32
R
MA
Start Of Sheet 7

GA

15
End Of Sheet 6

14
O

AN
UK

MW
JJ

6 P-31
NA

7 MUBIRU DAVID
16
17

Start Of Sheet 6
End Of Sheet 5
8
SSERYANGA JONAH KISOOKA

NABUDUWA AIDAH 18
P-30
9
NABUDUWA AIDAH

WANDA MOSES
10
WANDA MOSES
TX:50KVA KALAGI TC 19 20
21
MUWANGUZI JIMMY
NYACHO TEREZA

Legend: New overhead line LV New line ABC-3x50+54.6mm 2 LV New wooden pole Air break switch Meter unit MV and LV Stay type 1 (Conventional stay assembly) MV and LV New earthing Control Point Clerk 1880
Existing line New transformer New MV wooden pole Load break switch MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser MV and LV Stay type 3 (Flying stay assembly) Utm Zone 36N
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 6 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
MWESIGYE JUSTINE NSUBUGA EDWARD

103
102

OKOYA EZRA NAIGAGA BETTY


KIWANUKA SAM
100 99
OKOTH PATRICK
101
97 MIBURO JOSEPH
98

OKOTH JOHN MARTIN

96

95

94

Sheet 7

EY
ER
PET
93

MU
OKU
91 89

90

92
AKOTI MARY

Start Of Sheet 7
End Of Sheet 6
Legend: New overhead line LV New line ABC-3x50+54.6mm 2 LV New wooden pole Air break switch Meter unit MV and LV Stay type 1 (Conventional stay assembly) MV and LV New earthing Control Point Clerk 1880
Existing line New transformer New MV wooden pole Load break switch MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser MV and LV Stay type 3 (Flying stay assembly) Utm Zone 36N
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 7 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
Dof Nankojje village
P-1
LINE OPERATOR:UMEME
MV LENGTH=3.670kM
P-2

t off ex

P-3

Sheet 1
P-4

P-5

P-6

P-7
A
IY M
RE
YE
BA

p
AM

am
sw
DD

34
Start Of Sheet 2
End Of Sheet 1

33

JO P-08
SE
PH
SS
EK
Legend: New overhead line LV New line ABC-3x50+54.6mm 2 LV New wooden pole Air break switch Meter unit MV and LV Stay type 1 (Conventional stay assembly) MV and LV New earthing Control Point Clerk 1880
AT Existing line New transformer New MV wooden pole Load break switch
AW MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960
A
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser Utm Zone 36N
MV and LV Stay type 3 (Flying stay assembly)
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 1 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
SEMAKULA GIPSON
103 52

Y
MAZOYA IVAN KYEYUME

BA
104 MAYANJA PASCAL OWORI

AM
S
98

CI

DD
MAGOMA WASWA 37

AN
AKECHI GETRUDE
Start Of Sheet 3

FR
101 VINCENT
WASWA DAVID End Of Sheet 2

BI
105 49 34

IM
GUUBI CHARLES

O
NAKITYENDE R 36

PS

Start Of Sheet 2
US
NSUBUGA ANTHONY

GI
53

L
WA
97 PHILLIP
N

A
106 BE
35

L
NAKKU T 51 33

KU
NAKIWALA JAME MAZIZIBU
E
H MY

MA
48 LE
C
50 UR

E
100 YA

SS
KAYAGA EDITH CH I
NJA J
EZ
NANYU
NT
MUKASA CONSTANTIN 54 ON IM
EL
107 OJAMBA
LS JO P-08
WASWA DAVID 47 WI P-09 SE
96 TO PH
OJUMA WA 32 SS
31 EK
B
109 AKUMU LILLIAN SE AT
99 S
AW
DI GEOFREY A
MA
YA 30

Sheet 2
KIZZA REGINA 108 K 92 ADIKIMI 46
SA
93 P-10
KA NA
GEOFREY LU
BALABA BATESITA BW
AWORI AM
29 A
MPOORA GEOFREY SP
84 94 MU EC
PHILIP 45 27 KA IO
L ZA
KI AZI
KATENDE ZZ IN
28 MU A
NAMUBIRU EDITH SIMON OCHO MU BI YO NOC
83 FUTURE HOPE NURS. |& PRI. SCH. P-11 BI RU SAM ENT
85 RU TO U
PHILIP ED NN
NANDAWULA SYLIVIA WA Y
95 43 26 RD
44
82
PAUL
86 MUKIIBI DAN
NA
-3 N
DA
PAUL
A
M
RIA 81 P-15 P-12 MU
KU
WU
LA
A M NA NG
NAMUBIRU IMMY ANJ KA U SA
87 NA N K
Dof -2 25 NZ
A
AB
AS
FI
NA
ESTHER
80
P-15 I
89
KIVUMU LIVINGSTONE
IAM
88 MAR -2A P-13
JA
P-18
SSALI VINCENT 20
23
KAN
NAN L 1 -1
90 PAU P-15
ESTHER
OO ZA WINO 22
KAK MA A ANJA
STA FATU A M NANK LU BUKENYA DIRISA
I MARI
BAT Y PETER
WA
RI
ZIB
WE
I MBA I S TANL P-14 RA
KA AS SAL 24
A K JU
91 SUL 2 LI
US
4 ABAS
U RONALD 18
21
SSEBUF 3 20
VICENT ANNET
SEBUFU SS
EM
ZAWEDDE PI
RI
7 RO
5
Dof
P-15
NA
LD
SA
LO
8 6 NG
O
SAM MUTYABA
SEMWOGERELE FRED
P-16
NABASIRYE AGNES
9
TUKAMUHEBWA JOVULET

P-17

10

P-18
End Of Sheet 2
11
Start Of Sheet 5
Legend: New overhead line LV New line ABC-3x50+54.6mm 2 LV New wooden pole Air break switch Meter unit MV and LV Stay type 1 (Conventional stay assembly) MV and LV New earthing Control Point Clerk 1880
Existing line New transformer New MV wooden pole Load break switch MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser MV and LV Stay type 3 (Flying stay assembly) Utm Zone 36N
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 2 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
73
AWINO JUSTINE

72

71

70
NABAHIRWA DOMITRIA
MIRAGIRE EMANUEL
69
75

Sheet 3 68
Start Of Sheet 4
End Of Sheet 3

76
74
OW
OR
I
67 79 77 NABATANZI HARIENT
AROM SEBUNYA

65 66 78

L
UE
M AN 64
E
E
IR
RAG
MI

TX:50KVA KAWUTUTU TC 62 63
MIRAGIRE EMANUEL

61 OLWENYI FRANCIS
SEMAKULA GIPSON

60
OLWENYI FRANCIS 42

IANO
UBUGA

59 41
NANTONGO SARAH NS

58
40
122 115
113
KASOZI KAVUMA VICENT 57

EDENYA
112 39
56
OSINDE MOSES
116 114
111 AROM SEBUNYA
55
SSEBUTIMBIRI SAM 38
110 KABASINGA
102 SEMAKULA GIPSON
103 52
MAZOYA IVAN KYEYUME
104 MAYANJA PASCAL OWORI

S
98

CI
MAGOMA WASWA 37
KATONOKO EDWRD

AN
AKECHI GETRUDE
Start Of Sheet 3

FR
101 VINCENT
105 49 WASWA DAVID End Of Sheet 2

N
GUUBI CHARLES

SO
NAKITYENDE R 36
NSUBUGA ANTHONY

P
LV New wooden pole Air break switch MV and LV Stay type 1 (Conventional stay assembly)

GI
Legend: New overhead line LV New line ABC-3x50+54.6mm 2
Meter unit MV and LV New earthing Control Point Clerk 1880
Existing line New transformer New MV wooden pole Load break switch

LA
MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960

KU
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser MV and LV Stay type 3 (Flying stay assembly) Utm Zone 36N

A
EM
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 3 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
SSALI JONATHERN

147
146

145 KYIFUKO JOHN


148

KIYAGA ALOYSIUS
144
NAMUBIRU

143
142
SSEMWOGERE LARWENCE
141

140
MNAMUGENYI MANGADALENA

Start Of Sheet 4
End Of Sheet 3
KATENDE CHARLES OCHERI POSIANO
OKEYA DAMYANO 132
KEJI FLORENCE NDAGIRE COTIDA
138 KIYAGA DAVID
KIYAGA DAVID 133 134
BIYINZIKA AIDAH 136
LUGUDDE 131 135

Sheet 4
139
137

130

129

SSERUNKUMA EDGAR
TX
128 MUSISI MOSES
126

MUGERWA FRED
127 125
NYANFAMBA ROSE

OCHERI POSIANO
124

123

122

LUBOWA EDWARD WEDENYA


KASIMBA SULAIMAN
NAMBI HARRIET 116 114
SSEKIBULE BENARD 118 117
119
120

ATYANYI FLORENCE 121

Legend: New overhead line LV New line ABC-3x50+54.6mm 2 LV New wooden pole Air break switch Meter unit MV and LV Stay type 1 (Conventional stay assembly) MV and LV New earthing Control Point Clerk 1880
Existing line New transformer New MV wooden pole Load break switch MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser MV and LV Stay type 3 (Flying stay assembly) Utm Zone 36N
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 4 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
NAMUSISI BETTY 46 P-18
End Of Sheet 2
43
44
11
Start Of Sheet 5
41 42
38
45
P-19

EPHEN
37 NTALE RICHARD
12

P-20

34 NALUBEGA SAFIIMA 13

OKOTH VALENTINE MONDA HENRY


14
NAMUGOSA BEATRICE
33
NYOMBI SHAIBA
15
EDWARD P-21

Sheet 5
NANYONJO EDISA
15 KAWUKA DENIS
14 16
17
P-31 SSEBANDEKE RICHARD SSEBANDEKE RICHARD

SSEBANDEKE RICHARD
P-22
RU DAVID 18
16
17

Start Of Sheet 6
19

End Of Sheet 5
NAH KISOOKA RICHARD
18
P-30
P-23
21

19 20 MUWANGUZI JIMMY
NYACHO TEREZA

SSEBANDEKE RICHARD

P-29
32
P-24
SALI ABEY SEEKA
BABIRYE FROLENCE 22
31
MUBIRU PATRICK

P-28 23
P-27 24 P-25
P-26 25
NAMUTEBI SPECIOZA

MUBIRU PATRICK
KANYIKE PATRICK
26
27

28

KAYODI PETUA
29

30
SSEBANDEKE RICHARD
Legend: New overhead line LV New line ABC-3x50+54.6mm 2
LV New wooden pole Air break switch Meter unit MV and LV Stay type 1 (Conventional stay assembly) MV and LV New earthing Control Point Clerk 1880
Existing line New transformer New MV wooden pole Load break switch MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser MV and LV Stay type 3 (Flying stay assembly) Utm Zone 36N
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 5 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
78
WAMALA ANTONY OCHIENGE HAMUDAH
79 EPURU JULIUS
NANZIRI EVA 80 MAGENDA LAMEKA
77 81 82
WAMALA ANTONY
KIYAGA DAVID
76
MACUMI JOHN BOSCO 62
WANDA STEVEN
83

84
AWORI TEDDY 75 61
SAMPLIYA ROBINA

74
KATABIRA JOHN

NSANJA SHAFIC
53
Sheet 6 57
ODOI MILTON
60

MAKYALI JULIUS

63
64
LUKYAMUZI DAVIS

65
66
NEZA FRANK

67

EGESA JOHN 59
EKEYA DEO 58 KAVUMA VICENT
52 L A
73 AL
UD 56
SSEMAMBO JOHN AB 55
TOPHER RICHARD KAKWEZI SSERYANGA JONAH GA 54 48
E ATUHAIRE TAKIA
70 T ER 40 47
72 A KA KATEREGA ABUDALLA BUSULWA MUHAMAD
DEL

MUWONGE LARWENCE
LUGAYIZI LAJAB ORINDA ALEX
WAN

71 MUTESI REEM 51
NAMUSWE FRANCIS NAMUSISI BETTY 46
69 50 NANGOBI HARRIET
UL
PA 44
O
RUG G A 42
43
SE UN 49
CIS

38 41
68 MP 39
N

TH 45
FRA

P-38 P-37A BE
Y

ZA NI
FRE

I KI
EL
ERA

85 BYAKATONDA STEPHEN
O AD
GOD

A L 1 EN YA 37
D

HI LI NTALE RICHARD
N

WEK AT TI
A

B
UMA

U IN
Dof
W

M
87 2 DIM
OJ

P-37 DE 4 NG
O
SAN GRAVE YARD 3 YA KANYAMUHEZA KALOLI
89 88 AN
E
IK
OJAMB

NY
86 RCH KA 34
CHU 36 35
P-36
O JOS

90 P-35
11 OKOTH VALENTINE
MWESIGYE JUSTINE
EPH

P-34
12 33
ARY 5
T
RE

P-33
AC

13 EDWARD
GA

NANYONJO EDISA
IS

P-32
R
MA
Start Of Sheet 7

GA

15
End Of Sheet 6

14
O

AN
UK

MW
JJ

6 P-31
NA

7 MUBIRU DAVID
16
17

Start Of Sheet 6
End Of Sheet 5
8
SSERYANGA JONAH KISOOKA

NABUDUWA AIDAH 18
P-30
9
NABUDUWA AIDAH

WANDA MOSES
10
WANDA MOSES
TX:50KVA KALAGI TC 19 20
21
MUWANGUZI JIMMY
NYACHO TEREZA

Legend: New overhead line LV New line ABC-3x50+54.6mm 2 LV New wooden pole Air break switch Meter unit MV and LV Stay type 1 (Conventional stay assembly) MV and LV New earthing Control Point Clerk 1880
Existing line New transformer New MV wooden pole Load break switch MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser MV and LV Stay type 3 (Flying stay assembly) Utm Zone 36N
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 6 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda
MWESIGYE JUSTINE NSUBUGA EDWARD

103
102

OKOYA EZRA NAIGAGA BETTY


KIWANUKA SAM
100 99
OKOTH PATRICK
101
97 MIBURO JOSEPH
98

OKOTH JOHN MARTIN

96

95

94

Sheet 7

EY
ER
PET
93

MU
OKU
91 89

90

92
AKOTI MARY

Start Of Sheet 7
End Of Sheet 6
Legend: New overhead line LV New line ABC-3x50+54.6mm 2 LV New wooden pole Air break switch Meter unit MV and LV Stay type 1 (Conventional stay assembly) MV and LV New earthing Control Point Clerk 1880
Existing line New transformer New MV wooden pole Load break switch MV and LV Stay type 2 (Short stay assembly) Building Roads Arc 1960
Existing Tx Drop out fuses LV New line ABC-1x50+54.6mm 2
Existing wooden pole Auto recloser MV and LV Stay type 3 (Flying stay assembly) Utm Zone 36N
CLIENT PROJECT TITLE: CONTRACTOR
CONSULTANT APPROVAL NAME SIGN DATE
RURAL ELECTRIFICATION AGENCY SCHEME: PLANT, DESIGN, SUPPLY, AND INSTALLATION OF MEDIUM VOLTAGE SURVEYED BY : Yiga M Majwala & Kayanja E DATE:NOV 2021
PLOT 10 WINDSOR LOOP DRAWN BY : Yiga M Majwala & Kitaka H DATE:NOV 2021
2nd FLOOR HOUSE OF HOPE Additional Kalagi-Kawututu NETWORKS AND LAST MILE CONSUMER CONNECTIONS UNDER UREAP
P.O.BOX 7317 CHECKED BY :
Kampala, Uganda. LOT 11: PRIORITY RURAL ELECTRIFICATION WORKS IN CENTRAL SERVICE STEG
INTERNATIONAL APPROVED BY :
AND NORTH WESTERN SERVICE TERRITORIES (KASSANDA, KYANKWANZI, SERVICES SCALE: 1:2500 STATUS:
DISTRICT : MUKONO DISTRICT LUWERO, MUBENDE, MUKONO, NAKASEKE, WAKISO, NAKASONGOLA, Ark House-office 1B
PLOT 52-Kanjokya Street
As Pegged Mv & Lv Lines SHEET NO: 7 OF 7
PAPPER SIZE:A3
MASINDI, AND KIRYANDONGO DISTRICTS) Kamwokya 1- Kampala-Uganda

You might also like