Document Number: Rev.

Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 1 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES

ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

REQUEST FOR QUOTATION


ENVIRONMENTAL REGULATORY APPROVAL RELATED
SERVICES

Document Class: External / Internal








Digitally signed by Nur 
Digitally signed by Nur
Ghazali Safie
 Aslina Abdul Rahman 

 Aslina Abdul Rahman 2021.12.16



Date: 2021.12.16 Date: 2021.12.16 14:30:57 14:33:32 +08'00'



14:31:48 +08'00'


 +08'00'


 

IFQ – Issued For Quotation




A 16-Dec-2021 


Umi Azeera 


Nur Aslina Ghazali Safie
 

 

 

Date 
Written By 
Checked By Approved By
Rev STATUS  

DD-MMM-YYYY 


(name & signature) 

 (name & signature) (name & signature)









DOCUMENT REVISIONS












 

This document contains confidential proprietary information belonging to Hi-Essence Cable Sdn Bhd. It shall not be disclosed to any third





parties without Hi-Essence Cable's prior written consent.

Electronic Filename: EPRPP-HE-MIE-HSE-RFQ-0002_A.docx


Document Number: Rev. Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 2 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES

ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

TABLE OF CONTENT
1. INTRODUCTION ....................................................................................................................... 3
2. PURPOSE ................................................................................................................................. 3
3. REFERENCE DOCUMENTS .................................................................................................... 3
4. DEFINTION ............................................................................................................................... 3
5. ABBREVIATION ....................................................................................................................... 3
6. SCOPE OF SERVICES ............................................................................................................. 4
7. PROPOSAL CONTENT ............................................................................................................ 4
8. MEETING .................................................................................................................................. 4
9. SCHEDULE............................................................................................................................... 5
10. PRICE ....................................................................................................................................... 5
APPENDIX 1 .................................................................................................................................... 6
APPENDIX 2 .................................................................................................................................... 7
APPENDIX 3 .................................................................................................................................. 16
APPENDIX 4 .................................................................................................................................. 18
APPENDIX 5 .................................................................................................................................. 20
APPENDIX 6 .................................................................................................................................. 22
APPENDIX 7 .................................................................................................................................. 43

Electronic Filename: EPRPP-HE-MIE-HSE-RFQ-0002_A.docx


Document Number: Rev. Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 3 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES

ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

1. INTRODUCTION
The Owner, Hi Essence Cable Sdn Bhd., desires to build a 50,000 MT/year Wood Pellet and 2.4 MW Power
Plant where the power will be used to power the Wood Pellet Plant. The Owner also desires that the project
to be designed and built on a turnkey basis by a qualified Engineering, Procurement, Construction
Commissioning (EPCC) contractor. A brief description of the plant operation/process is listed below:
1. Pelletizing Plant
2. Gasification Power Plant
MIE Industrial Sdn. Bhd. (hereinafter referred to as “CONTRACTOR”) is appointed by Hi-Essence Cable
Sdn. Bhd. (hereinafter referred to as “COMPANY”) as the EPCC contractor to provide Engineering,
Procurement, Construction and Commissioning scope of work for this new FACILITIES.

2. PURPOSE
The purpose of this document is to provide SUBCONTRACTOR’s scope of work with regards to
environmental regulatory approval related services that specified under Environmental Quality Act, 1974 with
the intention to obtain approval from Department of Environment Malaysia prior to operating. (hereinafter
referred to as WORK).

3. REFERENCE DOCUMENTS
Reference documents and drawings for the project are provided in email.

4. DEFINTION
The definitions and acronyms used in this document have the meaning defined below:

OWNER: means Hi-Essence Cable Sdn Bhd


CONTRACTOR: means MIE Industrial Sdn Bhd
PROJECT: 50,000 MT Energy Pellet & 2.4 MW Advance Renewable Energy
Power Plant
EPCC: Engineering, Procurement, Construction and Commissioning
PACKAGE: means each package of works or supplies forming part or parts of
the PROJECT
SUBCONTRACTOR/VENDOR: means any company which EPCC CONTRACTOR has engaged or
proposes to engage (as the context may require) to undertake any
part of the EPCC CONTRACTOR Services

5. ABBREVIATION
The definitions and acronyms used in this document have the meaning defined below:
AFC : Approved for Construction
DOE : Department of Environment
EPCC : Engineering Procurement Construction & Commissioning
EQA : Environmental Quality Act
MT : Metric Tonne
MW : Mega Watt

Electronic Filename: EPRPP-HE-MIE-HSE-RFQ-0002_A.docx


Document Number: Rev. Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 4 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES

ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

6. SCOPE OF SERVICES
SUBCONTRACTOR is required to provide the following services as a minimum:

i. Consultation on compliance of facility emission with Clean Air Regulations. Potential emission of the
facility is expected from below equipment (but not limited to):
a. Pellet Package
• Stack for powder dryer
• Cyclones
• Dust removal system
b. Gasifier Package
• Stack for woodchip dryer
• Incinerator
• Gas generator exhaust
ii. Communications and liaison with equipment vendor and related authority/parties.
iii. Management and provision of all related written/verbal notification/ submission / permission to DOE
iv. Any other services required / stipulated under Environmental Quality Act, 1974.

7. PROPOSAL CONTENT
SUBCONTRACTOR shall provide the following information in proposal, but not limited to:

i. Execution plan inclusive of DOE air emission criteria for the pollution emission sources.
ii. Proposed schedule
iii. Company previous similar experiences.
iv. Third party shall list the proposed personnel to perform the above scope of work and provide CV’s
of them.
v. List of input document required from EPCC CONTRACTOR for the workshops or studies
vi. Any clarification / qualification/ exclusion by Third party shall be listed clearly and separately.
vii. Manhour charges (to include list of assessment report to be provided).
viii. In-direct work cost.
ix. Estimated duration of WORK.
x. Validity of quotation.
xi. Terms of Payment / Milestones, or Terms & Condition.
xii. Site survey requirement (if applicable)

8. MEETING
The venue for all studies and workshops will be at MIE Office in Puchong, Selangor or via online meeting.
SUBCONTRACTOR shall provide in proposal the list and agenda/procedure of foreseen meetings with the
number of attendees and estimated duration.

Electronic Filename: EPRPP-HE-MIE-HSE-RFQ-0002_A.docx


Document Number: Rev. Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 5 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES

ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

9. SCHEDULE
SUBCONTRACTOR shall provide a detailed preliminary work schedule. A detailed foreseen organization and
planning of team members working on the PROJECT will also be provided by SUBCONTRACTOR with
identification of specific tasks and time allocated (parallel or sequential works/sub-team, etc).

10. PRICE
SUBCONTRACTOR shall propose a FIXED LUMP SUMP PRICE for the workshops service, based on the
labour cost with man-hours and fixed man-hour rates, and any expenses for providing this service. Also, the
BREAKDOWN PRICE with work duration for each study shall be provided by SUBCONTRACTOR. Any
unclear issues shall be clarified with EPCC CONTRACTOR in bidding stage.
In case the scope of workshops may be added due to scope change, the cost from SUBCONTRACTOR will
be calculated as per fixed man-day rate basis, and also based on the per-diem rate when travelling for work
is necessary. Both the main-day rate and the per-diem rate shall be provided by SUBCONTRACTOR.

Electronic Filename: EPRPP-HE-MIE-HSE-RFQ-0002_A.docx


Document Number: Rev. Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 6 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES
ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

APPENDIX 1
General Plot Plan

Electronic Filename: APPENDIX 1.docx


Digitally signed  Digitally signed


by HAIRI  by Mohd Zharif

MOHAMAD  Imrat


Date:  Date:


2021.11.22  2021.11.22


13:29:05 +08'00'  13:29:47 +08'00'





Document Number: Rev. Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 7 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES
ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

APPENDIX 2
The Proposed 50,000MT/Year Wood Pellet & 2.4 MW
Power Plant at Land Next to Hi Essence Factory

Electronic Filename: APPENDIX 2.docx


REV NO. MIE/BIOMASS/01
PROPOSED 50,000 MT/Year Wood Pellet & 2.4 MW
DATE 12 Nov 2021
Power Plant at Land Next to Hi Essence Factory
PAGE 1 of 8

Energy Pellet &


Advance Renewable Energy
Power Plant
(Hi-Essence Wood Pellet & Power)

PROJECT:
THE PROPOSED 50,000 MT/YEAR Wood Pellet & 2.4 MW Power Plant at Land Next to Hi Essence Factory
REV NO. MIE/BIOMASS/01
PROPOSED 50,000 MT/Year Wood Pellet & 2.4 MW
DATE 12 Nov 2021
Power Plant at Land Next to Hi Essence Factory
PAGE 2 of 8

1. Pelletizing Plant Packaging System

Pelletizing and Cooling


System

Drying System

Crushing System

Chipping System
REV NO. MIE/BIOMASS/01
PROPOSED 50,000 MT/Year Wood Pellet & 2.4 MW
DATE 12 Nov 2021
Power Plant at Land Next to Hi Essence Factory
PAGE 3 of 8

1.1 Project Description


The Owner, Hi Essence Cable Sdn Bhd., desires to build a 50,000 MT/year Wood Pellet and 2.4 MW Power
Plant where the power will be used to power the Wood Pellet Plant. The Owner also desires that the
project to be designed and built on a turnkey basis by a qualified Engineering, Procurement, Construction
Commissioning (EPCC) contractor. A brief description of the plant operation/process is listed below:

1.1.1 Chipping System


The Wood Logs Chipping System is designed with capacity of 20-30MT/h. The Wood Chipper is receiving
wood logs with maximum dimension of 200mm (D) x 3000mm (L) and moisture content of <60 wt% from
Wood Logs Storage Bay via conveyor and chipped into wood chips with typical dimension of 30-50mm.
The wood chips is then conveyed from Wood Chipper to Wood Crushing System via conveyor.

Major equipment involved in this process include the following: -


a. Inlet Belt Conveyor
b. Wood Chipper
c. Output Belt Conveyor

1.1.2 Crushing System


The Wood Chips Crushing System is designed with capacity of 20MT/h. The Wood Crusher is receiving
wood chips from Wood Logs Chipping System and crushed into wood powder with dimension of <8mm
by means of hammer milling action. The wood powder is then conveyed from Wood Crusher to Wood
Powder Drying System via conveyor.

Major equipment involved in this process include the following:


a. Buffer Bin
b. Wood Crusher
c. Cyclone
d. Pneumatic Three-Ways Valve
e. Pulse Dust Collector
f. Draught Fan
g. Air Lock
h. Upper-Level Indicator
i. Wind Box
j. Lower-Level Indicator
k. Air Cannon
l. U-Screw Conveyor

1.1.3 Drying System


The Wood Powder Drying System is designed with capacity of 10MT/h. The Wood Dryer is receiving wood
powder from Wood Powder Crushing System and dried to <15 wt% of moisture content by hot air flow
generated from Hot Stove where dried wood powder is used as fuel for stove. The dried wood powder is
then conveyed from Wood Dryer to Wood Powder Pelletizing and Cooling System via conveyor.
REV NO. MIE/BIOMASS/01
PROPOSED 50,000 MT/Year Wood Pellet & 2.4 MW
DATE 12 Nov 2021
Power Plant at Land Next to Hi Essence Factory
PAGE 4 of 8

Major equipment involved in this process include the following:


a. U-Screw Conveyor
b. Rotary Drum Dyer with Hot Stove
c. Cyclone
d. Draught Fan
e. Air Lock
f. U-Screw Conveyor

1.1.4 Pelletizing and Cooling System


The Wood Powder Pelletizing and Cooling System is designed with capacity of 10MT/h. The Wood
Pelletizer is receiving dried wood powder from Wood Powder Drying System and pelletized into pellet
form with dimension of 6-8mm. The wood pellet is conveyed to Wood Pellet Cooling Unit and cooled by
circulation of ambient air. The cooled wood pellet is then conveyed from Wood Pellet Cooling Unit to
Wood Pellet Packaging System via conveyor.

Major equipment involved in this process include the following:


a. Bucket Elevator
b. Upper-Level Indicator
c. Storage Bin
d. Lower-Level Indicator
e. Air Cannon
f. Cyclone
g. Draught Fan
h. Air Lock
i. Anti-Caking Equipment
j. Wood Pelletizer
k. Bucket Elevator
l. Cooling Machine

1.1.5 Packaging System


The Wood Pellet Packaging System is designed with capacity of 10MT/h. The Wood Pellet Packaging Unit
is receiving cooled wood pellet from Wood Pellet Cooling Unit and packed into 800-1000kg Jumbo Bag
before sending to Wood Pellet Storage Warehouse for storage via forklift. The wood pellet in Jumbo Bag
is transferred to Cargo Truck and transported to Port for exporting.

Major equipment involved in this process include the following:


a. Bucket Elevator
b. Vibrating Screener
c. Upper Level Indicator
d. Storage Bin
e. Pneumatic Gate Valve
f. Packaging and Weighing Machine
REV NO. MIE/BIOMASS/01
PROPOSED 50,000 MT/Year Wood Pellet & 2.4 MW
DATE 12 Nov 2021
Power Plant at Land Next to Hi Essence Factory
PAGE 5 of 8

1.1.6 Electronic Control System


Motor Control Centre and Mimic Control Panel are used for the operation and control for the equipment
of Wood Pellet Plant.

1.1.7 Utilities Requirements


Electricity is supplied from Power Plant and pneumatic air is supplied from Air Compressor.
REV NO. MIE/BIOMASS/01
PROPOSED 50,000 MT/Year Wood Pellet & 2.4 MW
DATE 12 Nov 2021
Power Plant at Land Next to Hi Essence Factory
PAGE 6 of 8

2. Gasification Power Plant

Wood Chips Drying


System

Syngas Cooling and


Cleaning System
Gasification System

Power Generation

Waste Treatment
System
REV NO. MIE/BIOMASS/01
PROPOSED 50,000 MT/Year Wood Pellet & 2.4 MW
DATE 12 Nov 2021
Power Plant at Land Next to Hi Essence Factory
PAGE 7 of 8

2.1 Project Description


The Wood Chips Gasification and Power Generation Plant will be built to generate gross 2.4 MW of
electricity supply to Wood Pellet Plant. A brief description of the plant operation/process is listed below:

2.1.1 Wood Chips Drying System


The Wood Chips Drying System is designed with capacity of 2-3MT/h. The Wood Dryer is receiving wood
chips from Wood Chipper and dried to <20 wt% of moisture content by hot air flow generated from Hot
Stove of Wood Dryer or hot exhaust generated from Incinerator and Gas Engine Generator. The dried
wood chips is then conveyed from Wood Dryer to Gasification System via conveyor.

During plant start-up, hot air is generated from the Hot Stove of Wood Dryer by burning the wood chips
as fuel.
During plant normal operation, hot exhaust generated from the Incinerator and Gas Generator is used as
drying medium in order to save the fuel for Hot Stove of Wood Dryer.
The Wood Dryer exhaust is sent to Exhaust Stack.
The Exhaust Stack System is designed to release exhaust from Hot Stove of Wood Dryer, Incinerator
and/or Gas Engine Generator to atmosphere in order to meet Malaysia DOE Emission Standard.

Major equipment involved in this process include the following:


a. Wood Chipper
b. Wood Chips Storage Bin
c. Belt Feeder Magnetic Separator
d. Screening Machine
e. Rotary Drum Dryer with Hot Stove and Exhaust Stack
f. Cyclone Dust Collector
g. Conveyors

2.1.2 Gasification System


The Wood Chip Gasification System is designed to convert 1.2-1.3 MT/h of wood chips with <20 wt% of
moisture content into 3000 Nm3/h of syngas via thermochemical reactions in a Fixed-Bed Gasification
Reactor. Biochar generated from the gasifier as by-product can be sold as fertilizer to obtain extra income.

Major equipment involved in this process include the following:


a. Bucket Elevator
b. Inlet Feed Hoppers
c. Gasifier
d. Ash Discharge Conveyer
e. Ash Discharge Hopper
f. Gasifying Air Preheater
g. Air Blower

2.1.3 Syngas Cooling and Cleaning System


REV NO. MIE/BIOMASS/01
PROPOSED 50,000 MT/Year Wood Pellet & 2.4 MW
DATE 12 Nov 2021
Power Plant at Land Next to Hi Essence Factory
PAGE 8 of 8

The Syngas Cooling and Cleaning System is designed to cool the syngas and remove all solid particulate
(biochar, ashes, etc) and liquid contaminants (tar, condensate, etc) from the syngas before feeding the
syngas to Gas Engine Generator Module for 2.4 MW of power generation.

Major equipment involved in this process include the following:


a. Cyclone
b. Syngas Air Cooler
c. Trim Water Cooler I
d. Electrostatic Precipitator (ESP)
e. Trim Water Cooler II
f. Cooling Tower and Cooling Water Pumps
g. Water Droplet Catcher
h. Gas Flare (Not Required if there is Incinerator)
i. Syngas Buffer Tank
j. Booster Fan

2.1.4 Waste Treatment System


The Waste Treatment System is designed to internally treat all solid and liquid waste such as syngas
condensate and tar by means of incineration in order to meet Malaysia DOE Emission Standard.

Major equipment involved in this process include the following:


a. Condensate Water Pool, Tank and Pump
b. Tar Pool, Tank and Pump
c. Incineration Module

2.1.5 Power Generation System


The Power Generation System is designed to generate gross 2.4 MW of electricity by using Gas Engine
Generator with syngas as combustion fuel.

Major equipment involved in this process include the following:


a. Gas Engine Generator
b. Air Blower
c. Cooling Tower and Cooling Water Pumps

2.1.6 Electronic Control System


Motor Control Centre and Desktop Control Panel are used for the operation and control for the equipment
of Gasification Power Plant.

2.1.7 Utilities Requirements


Electricity is supplied from current TNB during Power Plant startup and from Power Plant itself during
Power Plant normal operation, pneumatic air is supplied from Air Compressor, raw water is supplied
from PAIP and cooling water from Cooling Tower.
Document Number: Rev. Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 16 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES
ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

APPENDIX 3
Process Flow Diagram – Wood Chipping System

Electronic Filename: APPENDIX 3.docx





Tee


Lee Ci 


Soon
Ghazali Safie
2021.12.14 09:24:40

+08'00'

Wei 


Tak



Document Number: Rev. Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 18 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES
ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

APPENDIX 4
Process Flow Diagram – Wood Crushing and Drying
System

Electronic Filename: APPENDIX 4.docx




Lee Ci



Tee Ghazali Safie

2021.12.14



Soon 09:25:39
Wei 


+08'00'
Tak



Document Number: Rev. Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 20 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES
ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

APPENDIX 5
Process Flow Diagram – Wood Pelletizing, Cooling
and Packaging System

Electronic Filename: APPENDIX 5.docx



Tee Ghazali Safie
Lee Ci





2021.12.14



Soon 09:26:22
Wei 


Tak +08'00'



Document Number: Rev. Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 22 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES
ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

APPENDIX 6
Pelletizing Package

Electronic Filename: APPENDIX 6.docx


Document Number: Rev. Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 23 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES
ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

Notes:

Kindly note that the pelletizing plant comes equipped with Pulse Dust Removal System as below.

Electronic Filename: APPENDIX 6-notes.docx


Document Number: Rev. Page

EPRPP-HE-MIE-HSE-RFQ-0002 A 43 / 48
REQUEST FOR QUOTATION OF ENVIRONMENTAL REGULATORY
APPROVAL RELATED SERVICES
ENERGY PELLET & ADVANCE RENEWABLE ENERGY POWER PLANT

APPENDIX 7
Gasifier Package

Electronic Filename: APPENDIX 7.docx


3DUW 'HVLJQ EDVLV

ǃ'HVLJQ DQG SUHSDUDWLRQ EDVLV RI ZDVWH ZDWHU LQFLQHUDWLRQ HTXLSPHQW

*% µ,QWHJUDWHG HPLVVLRQ VWDQGDUG RI DLU SROOXWDQWV¶


*% µ(PLVVLRQ VWDQGDUG RI RGRU SROOXWDQWV¶
µ5HJXODWLRQV RQ WKH DGPLQLVWUDWLRQ RI HQYLURQPHQWDO SURWHFWLRQ RI FRQVWUXFWLRQ SURMHFWV¶ LVVXHG DQG LPSOHPHQWHG E\
WKH 6WDWH &RXQFLO RI WKH SHRSOH
V 5HSXEOLF RI &KLQD LQ 
 7- µ+\JLHQLF VWDQGDUG IRU GHVLJQ RI LQGXVWULDO HQWHUSULVHV¶
 *%M µ&RGH IRU GHVLJQ RI EXLOGLQJ OLJKWQLQJ SURWHFWLRQ¶
 *% µ6WDQGDUG IRU SROOXWLRQ FRQWURO RI JHQHUDO LQGXVWULDO VROLG ZDVWH VWRUDJH DQG GLVSRVDO VLWHV¶
 *%- µ)LUH FRQWURO UHJXODWLRQV RI WKH SHRSOH
V 5HSXEOLF RI &KLQD¶
 *%- µ)LUH SURWHFWLRQ FRGH RI WKH SHRSOH
V 5HSXEOLF RI &KLQD¶
 *%- µ&RGH IRU ILUH SURWHFWLRQ GHVLJQ RI EXLOGLQJV¶
 *% ¶5HJXODWLRQV RI WKH SHRSOH
V 5HSXEOLF RI &KLQD RQ WKH SUHYHQWLRQ DQG FRQWURO RI HQYLURQPHQWDO QRLVH
SROOXWLRQ¶

ǃ:DVWHZDWHU DQG ZDVWH JDV GDWD

7KH ZDVWHZDWHU FRQWDLQLQJ SKHQROLF RUJDQLFV KDV D WUHDWPHQW FDSDFLW\ RI NJ  K DQG LWV YLVFRVLW\ DQG FDORULILF YDOXH
DUH FORVH WR WKDW RI ZDWHU

ǃ'HVLJQ EDVLV˖
 )XUQDFH W\SH KRUL]RQWDO IXUQDFH ERG\ FRPEXVWLRQ FKDPEHU
 ,QFLQHUDWLRQ FDSDFLW\ ZDVWHZDWHU NJ  K ELRPDVV JDV QP  K 7DU NJ SHU KRXU
 ,JQLWLRQ PRGH DXWRPDWLF LJQLWLRQ
 )XHO XVHG ELRPDVV JDV FDORULILF YDOXH NFDO  1P
 )HHGLQJ PRGH DXWRPDWLF LQMHFWLRQ RI OLTXLG DQG DXWRPDWLF LQMHFWLRQ RI ZDVWH JDV
 $VK UHPRYDO PHWKRG 0DQXDO D VPDOO DPRXQW RI DVK VKDOO EH FKHFNHG DQG UHPRYHG ZKHQ WKH ERLOHU LV VKXW GRZQ
 3UHVVXUH LQ WKH IXUQDFH QHJDWLYH SUHVVXUH GHVLJQ QR FRXQWHU ILUH   a  3D
 'HVLJQ FDORULILF YDOXH ZDVWH ZDWHU FDORULILF YDOXH DFFRUGLQJ WR WKH FDORULILF YDOXH RI ZDWHU &DORULILF YDOXH RI ELRPDVV
JDV NFDO  P
 :DVWH JDV WUHDWPHQW PHWKRG KLJK WHPSHUDWXUH DLU MHW YRUWH[ FRPEXVWLRQ  ** KHDW H[FKDQJHU
 ,QFLQHUDWLRQ WHPSHUDWXUH WKH FRPEXVWLRQ FKDPEHU WHPSHUDWXUH LV FRQWUROOHG DW  ć a  ć DQG WKH IOXH JDV
UHVLGHQFH WLPH LV QRW OHVV WKDQ  VHFRQGV 7KH PDLQ RUJDQLF PDWWHU LQ ZDVWHZDWHU LV WUHH SKHQROV
 )OXH JDV HPLVVLRQ VKDOO EH LQ DFFRUGDQFH ZLWK *% µ,QWHJUDWHG HPLVVLRQ VWDQGDUG RI DLU SROOXWDQWV¶
 )ORRU DUHD RI HTXLSPHQW PHWHUV î  PHWHUV
 7KH HTXLSPHQW LV GHVLJQHG WR RSHUDWH FRQWLQXRXVO\ DQG LQWHUPLWWHQWO\ ,W LV UHFRPPHQGHG WKDW WKH VLQJOH RSHUDWLRQ
WLPH VKDOO QRW EH OHVV WKDQ  KRXUV

ǃ6DIHW\ LQGH[
 7KH LQFLQHUDWRU LV HTXLSSHG ZLWK VDIHW\ SURWHFWLRQ GHYLFH :KHQ WKH LJQLWLRQ LV DEQRUPDO DIWHU WKH EXUQHU LV VWDUWHG LW
FDQ VDIHO\ DQG DXWRPDWLFDOO\ FXW RII WKH IXHO VXSSO\ DQG VWRS WKH HTXLSPHQW
 %HIRUH VWRSSLQJ RSHUDWLRQ WKH GHYLFH GHWHFWV WKH FRPEXVWLRQ FKDPEHU FRROLQJ SURJUDP VR WKDW ZKHQ WKH
FRPEXVWLRQ FKDPEHU WHPSHUDWXUH GURSV WR WKH VHW WHPSHUDWXUH WKH LQFLQHUDWRU VWRSV DOO RSHUDWLRQ
 7KHUH LV D FRQQHFWLRQ SURWHFWLRQ GHYLFH EHWZHHQ WKH FRQWURO FDELQHW DQG HDFK FRQWURO HTXLSPHQW WR DYRLG OHDNDJH
:KHQ WKH UHODWLYH KXPLGLW\ LV  WKH LQVXODWLRQ UHVLVWDQFH RI WKH HOHFWULFDO FLUFXLW LV QRW OHVV WKDQ  0ȍ DQG WKHUH LV
D JURXQGLQJ ZLUH WR WUDQVPLW WKH OHDNDJH SRZHU VXSSO\ 7KH ZLULQJ LV SURWHFWHG E\ PHWDO KRVH
 7KH HTXLSPHQW OHDYHV WKH IDFWRU\ DIWHU EHLQJ YHULILHG E\ WKH WHFKQLFDO GHSDUWPHQW 7KH LQVWDOODWLRQ RI DX[LOLDU\ JDV
FLUFXLW DQG IOXH JDV FLUFXLW LV YHU\ ILUP DQG WKHUH LV QR OHDNDJH DIWHU SUHVVXUH WHVW
 (OHFWULFDO FRQWURO V\VWHP
 3RZHU LQGLFDWLRQ DQG VZLWFK RI LQFLQHUDWRU GHYLFH
 3UHVVXUH ORVV DODUP RI VSUD\ SLSHOLQH
 $EQRUPDO SUHVVXUH ORVV DODUP RI ZDVWH ZDWHU SLSHOLQH
 5HVLGXDO EXUQLQJ WLPLQJ GHYLFH WR HQVXUH WKDW WKHUH LV QR UHVLGXDO IODPPDEOH JDV DQG RUJDQLF PDWWHU LQ WKH
IXUQDFH DQG WKH RSHUDWLRQ LV VDIH DQG UHOLDEOH
 2YHUORDG SURWHFWLRQ GHYLFH WR SURWHFW WKH PRWRU IURP RYHUORDG
 7HPSHUDWXUH FRQWUROOHG FRPEXVWLRQ
 +LJK DQG ORZ WHPSHUDWXUH FRQWURO LQWHUORFNLQJ


3DUW 'HYLFH RYHUYLHZ
ǃ&RPSRVLWLRQ RI LQFLQHUDWRU
+RUL]RQWDO IXUQDFH ERG\ VSOLW EXUQHU ** KHDW H[FKDQJHU ZDWHU VHDOLQJ WDQN SLSH VFUHHQ IODPH DUUHVWHU ELRPDVV
JDV SLSH V\VWHP IDQ DQG DLU VXSSO\ V\VWHP LQVWUXPHQW FRQWURO V\VWHP WHVW SODWIRUP DQG SLSH GLVWULEXWLRQ FRQQHFWLRQ
EHQG ZDVWH ZDWHU LQMHFWLRQ V\VWHP ZDVWH ZDWHU SUHVVXUH SXPS

ǃ3URFHVV GHVFULSWLRQ

%ORFN IORZ GLDJUDP

%RRVWHU SXPS DQG GHOLYHU\


%LRPDVV JDV :DVWHZDWHU SLSHOLQH

$LU FRPSUHVVRU $WRPL]HU

+RUL]RQWDO %LRPDVV *DV %XUQHU


:DWHU VHDO WDQN %XUQHU LQFLQHUDWRU

&RPEXVWLRQ PDFKLQH R[\JHQ ** +HDW


VXSSOHPHQW IDQ H[FKDQJHU 3UHKHDWLQJ DLU

'U\LQJ NLOQ
:KHQ WKH WHPSHUDWXUH LQ WKH IXUQDFH ULVHV WR WKH VHW YDOXH RI  a  ć WKH VROHQRLG YDOYH RQ WKH ZDVWH ZDWHU
SLSHOLQH RSHQVWKH ZDVWH ZDWHU LV SUHVVXUL]HG E\ WKH SXPS
LW LV WUDQVSRUWHG WR WKH VSUD\ JXQ WKURXJK WKH SLSHOLQH DQG DXWRPDWLFDOO\ LQMHFWHG LQWR WKH FRPEXVWLRQ FKDPEHU RI WKH
IXUQDFH ERG\ 7KH ZDVWH ZDWHU LV EXUQHG DW KLJK WHPSHUDWXUH E\ WKH ELRPDVV JDV LQMHFWHG LQWR WKH EXUQHU $FFRUGLQJ WR
WKH SULQFLSOH RI FRPEXVWLRQ 7 WHPSHUDWXUH WLPH DQG YRUWH[  LW LV IXOO\ R[LGL]HG S\URO\]HG DQG EXUQHG LQ WKH
FRPEXVWLRQ FKDPEHU RI WKH IXUQDFH ERG\  a  ć  DQG WKH UHPRYDO UDWH RI RUJDQLF FRPEXVWLRQ GDPDJH LV PRUH
WKDQ 
7KH LQFLQHUDWLRQ WHPSHUDWXUH LV DERXW  a  ć DQG WKH KLJKWHPSHUDWXUH IOXH JDV HQWHUV WKH ** KHDW H[FKDQJHU
WR UHGXFH WKH WHPSHUDWXUH WR DERXW  a  ć ZKLOH SUHKHDWLQJ WKH R[\JHQ VXSSOHPHQW DLU WR DERXW  a  ć
VR DV WR UHFRYHU WKH KHDW HQHUJ\ DQG VDYH WKH IXHO UHTXLUHG IRU ZDVWH ZDWHU LQFLQHUDWLRQ 7KH FRROHG IOXH JDV LV VHQW WR
WKH GU\LQJ IXUQDFH

ǃ(TXLSPHQW GHVFULSWLRQ
˄˅:DVWH ZDWHU LQFLQHUDWRU ERG\
˅7DQJHQWLDO DWRPL]DWLRQ GHYLFH  LQWHUQDO PL[HG WZR IOXLG DWRPL]HU LV DGRSWHG ,WV PL[LQJ GHJUHH DWRPL]DWLRQ
HIIHFW FRPEXVWLRQ VSHHG DQG HIILFLHQF\ DUH H[FHOOHQW DQG WKH H[FHVV DLU FRHIILFLHQW LV RQO\  WLPHV ZKLFK ZLOO
VLJQLILFDQWO\ UHGXFH WKH IXHO FRQVXPSWLRQ IRU KHDWLQJ DLU 7KH DWRPL]HU
V QR]]OH KDV D ODUJH FDOLEHU DQG LW KDV ORZ
UHTXLUHPHQW IRU WKH YLVFRVLW\ DQG LPSXULW\ FRQWHQW RI WKH DWRPL]HU ,W LV QRW HDV\ WR FORJ 7KH ORZ SUHVVXUH VSUD\
PHWKRG LV VDIHU WKDQ WKH KLJKSUHVVXUH VSUD\ JXQ W\SH LV QRW HDV\ WR ZHDU DQG LV QRW HDV\ WR PDOIXQFWLRQ DQG KDV
JRRG FRPEXVWLRQ HIIHFW
˅+LJK VDIHW\  LW KDV WKH IXQFWLRQ RI QR LJQLWLRQ ZLWKRXW GLVFKDUJLQJ H[SORVLYH JDV EHIRUH VWDUWXS WR SUHYHQW JDV
H[SORVLRQ D UHVLGXDO FRPEXVWLRQ WLPLQJ GHYLFH LV GHVLJQHG WR HQVXUH WKDW WKHUH LV QR UHVLGXDO H[SORVLYH JDV LQ WKH
IXUQDFH 7KH EXUQHU LV HTXLSSHG ZLWK SKRWRVHQVLWLYH WXEH GHWHFWLRQ ,Q FDVH RI IODPHRXW RU LJQLWLRQ IDLOXUH WKH RLO FLUFXLW
ZLOO EH FXW RII TXLFNO\ DQG DXWRPDWLFDOO\ ZKLFK LV VDIH DQG UHOLDEOH ,Q DGGLWLRQ WKH DWRPL]DWLRQ SUHVVXUL]DWLRQ V\VWHP LV
LQWHUORFNHG ZLWK WKH WHPSHUDWXUH ,Q FDVH RI KLJK WHPSHUDWXUH RU DEQRUPDOLW\ WKH ZDVWHZDWHU VXSSO\ ZLOO EH VWRSSHG
LPPHGLDWHO\ 7KH DODUP V\VWHP LV FRPSOHWH DQG WKH ZKROH RSHUDWLRQ V\VWHP RSHUDWHV XQGHU WKH PRQLWRULQJ RI WKH
LQVWUXPHQW
˅/RZ RSHUDWLRQ FRVW  KHDW UHFRYHU\ PDNHV WKH HTXLSPHQW VLPSOLILHG WKH FRVW UHGXFHG DQG HDV\ WR PDLQWDLQ
˅7KH UHIUDFWRU\ PDWHULDOV VHOHFWHG IRU WKH XSSHU SDUW RI WKH IXUQDFH DQG WKH FRQH FRPEXVWLRQ KHDG RI WKH ZDVWH


ZDWHU IXUQDFH DUH KLJK WHPSHUDWXUH DQG FRUURVLRQ UHVLVWDQW
˅1R VHFRQGDU\ SROOXWLRQ  WKH PXOWLVWDJH DLU VXSSO\ V\VWHP FDQ UHGXFH WKH 12[ GLVFKDUJHG GXULQJ WKH
FRPEXVWLRQ SURFHVV ZKLFK LV WKH EHVW WHFKQRORJ\ WR UHGXFH 12[ SROOXWLRQ LQ WKH FXUUHQW ZDVWHZDWHU FRPEXVWLRQ
WHFKQRORJ\
˅7KH SLSHOLQH DUHD LQFOXGHV VWDLQOHVV VWHHO JDV WUDQVPLVVLRQ SLSHOLQH ZDVWH ZDWHU WUDQVPLVVLRQ SLSHOLQH DQG DLU
SUHVVXUH SLSHOLQH ,W LV HTXLSSHG ZLWK ILOWHU ZDWHU VHDO WDQN WUDQVPLVVLRQ SXPS SUHVVXUH UHGXFLQJ YDOYH SUHVVXUH
GHWHFWRU DQG WUDQVPLVVLRQ FLUFXLW 7KH ZDVWH ZDWHU SLSHOLQH LV PDGH RI FDUERQ VWHHO ZLWK JRRG TXDOLW\ DQG ORQJ VHUYLFH
OLIH RI GRXEOH FLUFXLW V\VWHP
˅$WRPL]DWLRQ V\VWHP LV LQFLQHUDWRU WHFKQRORJ\ *XDQ -LDQ WKLV V\VWHP LV GHVLJQHG E\ DWRPL]DWLRQ WHFKQRORJ\
DEURDG &RPSUHVVHG DLU LV DGMXVWHG WR FRQVWDQW SUHVVXUH $WRPL]HU DQG ZDVWHZDWHU DUH PL[HG LQWR IRDP HYHQO\ :KHQ
DWRPL]HG IURP WKH QHEXOL]HU WKH V\VWHP LV GLVSHUVHG LQWR VPDOO GURSOHWV GXH WR SUHVVXUH UHOHDVH 7KH SDUWLFOH VL]H LV
EHORZ  PLFURQV ZKLFK LV  RI WKH DWRPL]HU SDUWLFOH VL]H RI RWKHU QHEXOL]HU 7KH WRWDO VSHFLILF VXUIDFH DUHD RI
FRPEXVWLRQ LV JUHDWO\ LQFUHDVHG WKH FRPEXVWLRQ VSHHG LV DFFHOHUDWHG WKH HIIHFWLYH UHVLGHQFH WLPH UHTXLUHG IRU WKH IXOO
FRPEXVWLRQ RI RUJDQLF PDWWHU LQ ZDVWHZDWHU LV UHGXFHG DQG WKH IXHO FRQVXPSWLRQ LV UHGXFHG $ ORRS V\VWHP LV
GHVLJQHG WR HQVXUH WKDW WKH IRJ SDUWLFOHV DUH LQ D FRQVWDQW VWDWH ZLWK IDVW JDVLILFDWLRQ VSHHG DQG JRRG FRPEXVWLRQ
HIIHFW
˅%LRPDVV JDV EXUQHU LV FRPSRVHG RI VROHQRLG YDOYH JURXS IDQ DQG EXUQHU HOHFWURQLF DXWRPDWLF LJQLWHU HWF
LPSRUWHG SDUWV DUH VHOHFWHG ZLWK ORQJ FRQWLQXRXV RSHUDWLRQ WLPH DQG JRRG HIIHFW 7KH R[\JHQ VXSSO\ FDQ EH
DXWRPDWLFDOO\ DGMXVWHG DFFRUGLQJ WR WKH FRPEXVWLRQ VLWXDWLRQ LQ WKH IXUQDFH UHGXFLQJ WKH IXHO FRQVXPSWLRQ RI KHDWHG
DLU
˅7KH DLU VXSSO\ V\VWHP LV GHOLYHUHG LQWR WKH EHOORZV E\ D ORZQRLVH KLJKSUHVVXUH IDQ DQG WKH DLU LV VXSSOLHG
LQWR WKH FRPEXVWLRQ FKDPEHU RI WKH IXUQDFH ERG\ LQ PXOWLSOH VHFWLRQV WKURXJK D VSHFLDO DLU QR]]OH WR LQFUHDVH WKH
DPRXQW RI DLU UHTXLUHG IRU FRPEXVWLRQ DQG WKH GDPDJH WR RUJDQLF VXEVWDQFHV FDQ UHDFK PRUH WKDQ 
˄˅** +HDW H[FKDQJHU
7KH KHDW H[FKDQJHU LV XVHG IRU KHDW H[FKDQJH EHWZHHQ JDV DQG DLU DQG WKH KRW IOXH JDV LV XVHG WR SUHKHDW WKH
R[\JHQ PDNHXS DLU VR DV WR UHF\FOH SDUW RI WKH KHDW UHGXFH WKH IXHO JDV FRQVXPSWLRQ LQ WKH IXUQDFH DQG UHGXFH WKH
RSHUDWLRQ FRVW
˄˅2SHUDWLRQ FRQWURO ER[
2XWGRRU UDLQSURRI W\SH HTXLSSHG ZLWK
ķ 3RZHU LQGLFDWLRQ DQG VZLWFK RI LQFLQHUDWRU GHYLFH
ĸ :DWHU FXWRII DODUP GHYLFH DQG DXWRPDWLFDOO\ VWRS RSHUDWLRQ WR SURWHFW WKH HTXLSPHQW
Ĺ 5HVLGXDO EXUQLQJ WLPLQJ GHYLFH WR HQVXUH WKDW WKHUH LV QR UHVLGXDO IODPPDEOH JDV DQG RUJDQLF PDWWHU LQ WKH IXUQDFH
DQG WKH RSHUDWLRQ LV VDIH DQG UHOLDEOH
ĺ 2YHUORDG SURWHFWLRQ GHYLFH WR SURWHFW WKH PRWRU IURP RYHUORDG
Ļ 7HPSHUDWXUH FRQWUROOHG FRPEXVWLRQ


3DUW 0HFKDQLFDO VSHFLILFDWLRQV
)XUQDFH ERG\ RQH VHW
7\SH KRUL]RQWDO ZDVWH OLTXLG IXUQDFH
0DWHULDO DQG WKLFNQHVV TEPP  PP KLJK WHPSHUDWXUH UHIUDFWRU\ KLJK WHPSHUDWXUH  ć RYHUDOO
GLPHQVLRQ „  î PP
,QFLQHUDWLRQ FDSDFLW\ ZDVWHZDWHU NJ  K
)XUQDFH YROXPH P IXUQDFH ORDG JUHDWHU WKDQ  NFDO  P K
** +HDW H[FKDQJHU RQH VHW
0DWHULDO KHDW H[FKDQJH VXUIDFH PDWHULDO 686 KHDW H[FKDQJH DUHD  a P
)OXH JDV LQOHW WHPSHUDWXUH  ć IOXH JDV RXWOHW WHPSHUDWXUH a  ć DLU LQOHW WHPSHUDWXUH  ć
$LU RXWOHW WHPSHUDWXUH  a  ć
:DWHU VHDO WDQN RQH VHW
)RUP +RUL]RQWDO
0DWHULDO 4  DQWLFRUURVLRQ
2YHUDOO GLPHQVLRQ ̛ PP PP
6SOLW W\SH EXUQHU RQH VHW
2XWSXW UDQJH  NFDO
%LRPDVV JDV FRQVXPSWLRQ P  K
FRQWURO PRGH ODUJH DQG VPDOO ILUHV
0RWRU SRZHU NZ
2[\JHQ VXSSOHPHQW IDQ RQH VHW
$LU YROXPH  P  K
:LQG SUHVVXUH 3D
0RWRU NZ
2[\JHQ VXSSOHPHQW IDQ RQH VHW
$LU YROXPH  P  K
:LQG SUHVVXUH 3D
0RWRU NZ
:DVWH ZDWHU DWRPL]LQJ DQG VSUD\LQJ GHYLFH RQH VHW
7\SH LQWHUQDO WDQJHQWLDO K\EULG
1R]]OH PDWHULDO 66
%DUUHO PDWHULDO 66
$WRPL]DWLRQ DPRXQW NJ  K PD[
(OHFWULFDO FRQWURO ER[ RQH VHW
3RZHU VXSSO\ DQG VZLWFK RI LQFLQHUDWRU GHYLFH
:DWHU FXWRII DODUP GHYLFH
5HVLGXDO EXUQLQJ WLPLQJ GHYLFH
,QFLQHUDWLRQ WHPSHUDWXUH FRQWURO V\VWHP
2YHUORDG SURWHFWLRQ GHYLFH (OHFWULFDO
+LJK DQG ORZ WHPSHUDWXUH FRQWURO LQWHUORFNLQJ GHYLFH
9ROWDJH FXUUHQW DQG WHPSHUDWXUH GLVSOD\ LQVWUXPHQW
:DVWH ZDWHU SLSHV RQH VHW
3LSHOLQH SODWIRUP PP î  PP
3LSHOLQH VWDLQOHVV VWHHO EDOO YDOYH GXSOH[ ILOWHU FKHFN YDOYH VROHQRLG YDOYH VWDLQOHVV VWHHO SLSHOLQH VWDLQOHVV VWHHO
IODQJH DQG PHWDO KRVH
:DVWH ZDWHU SXPS˄2QH IRU XVH DQG RQH IRU VWDQGE\˅WZR VHWV
)ORZ W  K
/LIW  a P
3RZHU NZ
&RPSUHVV DLU SLSHV RQH VHW
,QFOXGLQJ EDOO YDOYH ILOWHU SUHVVXUH UHGXFLQJ YDOYH FKHFN YDOYH IODQJH SLSHOLQH DQG PHWDO KRVH
%LRPDVV JDV SLSHV RQH VHW
7KH RZQHU LV UHVSRQVLEOH IRU FRQQHFWLQJ WR WKH ZDWHU VHDOHG WDQN LQ WKH FRPEXVWLRQ DUHD
7KHUPRFRXSOH 7ZR 3FV
0RGHO . 'LYLVLRQ
6SHFLILFDWLRQ  a  ć
0DWHULDO 686
$LU FRPSUHVVRU RQH VHW
*DV VXSSO\ PPLQ
$LU SUHVVXUH 03D
0RWRU SRZHU NZ
:DVWH ZDWHU VWRUDJH WDQN RQH VHW