Professional Documents
Culture Documents
Haya Water is undertaking the construction of the sewage connections and treated water connections for government, residential
and commercial facilities in the state of Seeb and Airport Heights, Oman.
The project will connect 87 governmental, residential, and commercial facilities to receive approximately 21,400 cubic meters/day
of sewage water from these connected units. 63 facilities will also be connected. The treated water network has a capacity of
more than 24,560 m3/day.
It aims at enhancing the capacity of the main sewage station in the state and raising its efficiency to receive larger quantities of
sewage water, to raise the station’s capacity from 62,000 thousand cubic meters per day to 82,000 thousand cubic meters per
day, in addition to linking 63 facilities in the Seeb area with treated water.
Owner
Pre-Qualified
Bidder
Awarded Haya Water
Khalid Al Lawatia, Deputy General Manager
(+968) 24116100/(+968) 93939003
Main Contractor
Pre-Qualified
Bidder
Awarded Hassan Allam Construction
(+20) 2 22659000
Pipeline (kilometer) 17
Latest News
A project to strengthen the sewage and treated water networks in the state of Seeb and Airport Heights
11 Oct 2021
https://premium.meedprojects.com/Projects/Overview/355663 20/02/2022