Professional Documents
Culture Documents
The main objectives of this project are to produce a complete set of measured
drawings of heritage building. This project also includes documentation of
important architectural, historical and cultural information of the building to
preserve an accurate record of historic properties that can be used in research
and conservation activities.
INTRODUCTION
1. Title Sheet: This sheet always contains the name of the structure in bold
lettering, a short synopsis of the site’s history, site location maps, a site plan,
and project credits. Sometimes a significant elevation, detail, or perspective
view is presented. A drawing index is essential for large sets.
2. Site Plans. These should show existing site conditions. (Historic conditions
may also be Required.) Site plans should feature plat boundaries, transportation
systems, influential geography (rivers, valleys), and significant site structures
and services. Topography may need to be included, and if botanical materials
(trees, shrubs, plants) are significant, they should be shown and identified by
their Latin and common names.
PLANNING DRAWINGS
• Historic Site Plans. A series of dated site plans may be needed to show
the development
of a building, industrial complex or large civil engineering system.
• Site Sections. These are needed to show the way an industrial site or
bridge was built to adapt to special topographic conditions. Relationships
between buildings or functions at different levels can be displayed this
way.
• Floor Plans. These must show wall materials and openings, floor
configurations and finishes, and significant structural members.
Machinery, transportation routes, piping, line shafting, and the like
should be included. Plans may also trace the flow of a process or product
through a building or site. Cutaway plans may be used in some cases
(such as bridges or other modular structures) in order to show typical
internal or underlying structure.
COURSE OBJECTIVE
COURSE OUTCOME