You are on page 1of 1

SEREMBAN ENGINEERING BERHAD

PR006-0
BLASTING & PAINTING RELEASE NOTE
Job No. : 18/01241LLCH,18/01243LLCH Date Received : 11/27/2018
Project : PT SMART TBK Date Delivered : 11/28/2018
Client : Lipico Report No :
PAGE 1 OF 1
ITEMS COVERED BY THIS RELEASE
Sketch Drawing / Attached Remarks
Qty Part Name Paint System
Drawing External / Internal
1 Tank Blasting : Sweep Internal blasting using glass beat on the
Surface m² : 2
blast spot area due to stain

SA 2 1/2 x
x
x
1st Coat :

Colour :

Thickness :

1st Coat :

Colour :

Thickness :

3rd Coat :
Colour :
Thickness :
RELEASE NOTE CHECK-IN
YES NO
1 FINAL VISUAL INSPECTION COMPLETED
2 WELDING SATISFACTORY
3 DIMENSIONAL CHECK OK
4 N.D.T. SATISFACTORY
5 PAINTING COMPLETED
6 ATTACHMENT LISTING PROVIDED(SPECIFY)
REMARKS : RELEASE FOR : Blasting & Painting

Spot blast due to stain (unremovable)

PIC QC STRUCTURE SEB RECEIVED BY :

NAME / SIGNATURE: Lukman NAME / SIGNATURE: NAME / SIGNATURE:


DATE : 16/11/2018 DATE : 16/11/2018 DATE :