You are on page 1of 2

SURFACE PREPARATION PROJECT NAME: BLDG:

AND PAINTING INSPECTION REPORT CUSTOMER NAME: PH NO:


JOB NO: DATE:

Amb. Temperatature Surface Preparation Painting


Painting Specification Cup Brush Required Total DFT
Manufacturer Short Blasting Primer Coat:
Batch Chipping Intermediate Coat:
Color Final Coat:

Part Mark Quantity Cup Brush Short Blasting Chipping Primer Coat Intermediate Final Average Accepted Rejected Remarks

Observation / Comments:
QC Inspector Authorizer Signature