OPAL Reactor David Vittorio Reactor Manager, OPAL Overview ▪ Stakeholder Needs – Strategic Planning (NG-T-3.16) ▪ Ageing Management and Asset Management ▪ Reliability Engineering ▪ System Maintenance Strategies ▪ Maintenance Service Delivery Stakeholder Needs (NG-T-3.16)
Safe, Secure and Reliable
Operation Ageing and Asset Management
Engineering, operation, and maintenance
Ageing Management strategy and actions to control within acceptable (SSG-10) limits the ageing degradation of SSCs
Asset Management The coordinated activity of an organisation to
(ISO 55000) realise value from an asset Ageing Management Elements (SSG-10) Management Stages of Lifetime Programmes Interfaces with System other Areas
testing and inspection 2 Resource 2 Fabrication and 2 Identification and 2 Periodic safety review Management Construction Understanding
3 Process 3 Commissioning 3 Minimization 3 Equipment
Implementation qualification
4 Measurement, 4 Operation 4 Detection, Monitoring 4 Reconstitution of the
Assessment and and Trending design basis Improvement 5 Utilization and 5 Mitigation 5 Configuration Modifications management
6 Extended Shutdown 6 Continuous 6 Continued safe
Improvement operation
7 Decommissioning 7 Record Keeping 7 Post-service
surveillance and testing Asset Management Groups (IAM) GROUP 1 GROUP 2 GROUP 3 GROUP 4 GROUP 5 GROUP 6 Strategy Planning Asset Life Cycle Delivery Asset information Organisation & Risk & review Management people 1 Asset management Decision-making 1 Technical standards 1 Asset information 1 Risk assessment & policy and legislation strategy management 1 Procurement & 2 Asset management 1 Capital investment 2 Asset creation & 2 Asset information supply chain 2 Contingency planning strategy & objectives decision-making acquisition standards management & resilience analysis 2 Operations & 3 Systems engineering 2 Asset management 3 Sustainable 3 Demand analysis 3 Asset information leadership development maintenance 4 Configuration systems decision-making management 3 Organisational 4 Management of 4 Strategic planning 5 Maintenance delivery 4 Data & information structure 3 Lifecycle value change management realisation 6 Reliability 4 Organisational 5 Asset performance & 5 Asset management health monitoring planning 4 Resourcing strategy engineering culture 7 Asset operations 5 Competence 6 Asset management management system monitoring 5 Shutdowns & outage 8 Resource strategy management 7 management review, 9 Shutdown & outage audit & assurance management 10 Fault & incident 8 Asset costing & response valuation 11 Asset 9 Stakeholder decommissioning engagement & disposal Reliability Engineering ▪ Ownership of SSCs ▪ Knowledge of SSCs Design ▪ Knowledge of ageing mechanisms ▪ Knowledge of Failure modes ▪ Reliability Centred Maintenance Reliability Engineering
WHAT WHEN WHY WHO HOW
▪ Tasks and their interval Specific failure Responsibility How to perform
▪ Fixed Time Tasks type addressed for performing task. Plan, task ▪ Failure Finding Tasks by maintenance maintenance list, materials tasks tasks and ▪ Condition Monitoring Tasks instructions System Maintenance Strategy WHAT WHEN WHY WHO HOW No Task/Activity CM FT FF Relevant Task Interval1 Function Failure/Purpose Work SAP Plan Integrated Description Centre8 Support Docs4 1 SCS pumps bearing X Replace main pump 1M To detect bearing faults/wear, imbalance, MECH OMP-600 OMI 0000-011 vibration and motor coupling or impellor faults, looseness, soft- thermography foot, misalignment in pump or motor that OMP-609 analysis (motor and Replace main pump may eventually result in bearing pump) impeller failure/seizure. assembly/bearing For pumps 2110-AB-001A/B/C, Replace main coupling 2110-AB-003A/B and 2110-AB-004A/B, the task is performed at power on the running pump. Pumps are regularly changed over in accordance with the power cycle briefing and HVAC/CNS pump change-overs. For pumps 2110-AB-002A/B, the task is performed at shutdown on the running pump (refer above LTDCL pump run task). 2 SCS internal X Repair, replace or 24M Ultrasonic thickness measurements are CONT OMP-123 OMI 0032-003 pipework inspection recoat pipework taken of Mat Class C piping to trend carbon by Ultrasonic Testing steel pipe thinning and assist in predicting OPAL-0032- thickness testing remaining service life of the SCS. DAS-005
Note: SCS corrosion is also monitored
through analysis of SCSWT corrosion coupons, refer to Maintenance Strategy OMM 2100-001. Maintenance Service Delivery ▪ Shared Responsibility ▪ Maintainers ▪ Operators ▪ Engineers
▪ Condition Monitoring and Precision Maintenance Thank you