An Asset Management

Approach for Reliability


OPAL Reactor
David Vittorio
Reactor Manager, OPAL
Overview
▪ Stakeholder Needs – Strategic Planning (NG-T-3.16)
▪ Ageing Management and Asset Management
▪ Reliability Engineering
▪ System Maintenance Strategies
▪ Maintenance Service Delivery
Stakeholder Needs (NG-T-3.16)

Safe, Secure and Reliable


Operation
Ageing and Asset Management

Engineering, operation, and maintenance


Ageing Management
strategy and actions to control within acceptable
(SSG-10) limits the ageing degradation of SSCs

Asset Management The coordinated activity of an organisation to


(ISO 55000) realise value from an asset
Ageing Management Elements (SSG-10)
Management Stages of Lifetime Programmes Interfaces with
System other Areas

1 Responsibilities 1 Design 1 Screening SCCs 1 Maintenance, periodic


testing and
inspection
2 Resource 2 Fabrication and 2 Identification and 2 Periodic safety review
Management Construction Understanding

3 Process 3 Commissioning 3 Minimization 3 Equipment


Implementation qualification

4 Measurement, 4 Operation 4 Detection, Monitoring 4 Reconstitution of the


Assessment and and Trending design basis
Improvement
5 Utilization and 5 Mitigation 5 Configuration
Modifications management

6 Extended Shutdown 6 Continuous 6 Continued safe


Improvement operation

7 Decommissioning 7 Record Keeping 7 Post-service


surveillance and
testing
Asset Management Groups (IAM)
GROUP 1 GROUP 2 GROUP 3 GROUP 4 GROUP 5 GROUP 6
Strategy Planning Asset Life Cycle Delivery Asset information Organisation & Risk & review
Management people
1 Asset management Decision-making 1 Technical standards 1 Asset information 1 Risk assessment &
policy and legislation strategy management
1 Procurement &
2 Asset management 1 Capital investment 2 Asset creation & 2 Asset information supply chain 2 Contingency planning
strategy & objectives decision-making acquisition standards management & resilience analysis
2 Operations & 3 Systems engineering 2 Asset management 3 Sustainable
3 Demand analysis 3 Asset information leadership development
maintenance 4 Configuration systems
decision-making management
3 Organisational 4 Management of
4 Strategic planning 5 Maintenance delivery 4 Data & information structure
3 Lifecycle value change
management
realisation
6 Reliability 4 Organisational 5 Asset performance &
5 Asset management health monitoring
planning 4 Resourcing strategy engineering culture
7 Asset operations 5 Competence 6 Asset management
management system monitoring
5 Shutdowns & outage 8 Resource
strategy management
7 management review,
9 Shutdown & outage audit & assurance
management
10 Fault & incident 8 Asset costing &
response valuation
11 Asset 9 Stakeholder
decommissioning engagement
& disposal
Reliability Engineering
▪ Ownership of SSCs
▪ Knowledge of SSCs Design
▪ Knowledge of ageing
mechanisms
▪ Knowledge of Failure modes
▪ Reliability Centred
Maintenance
Reliability Engineering

WHAT WHEN WHY WHO HOW

▪ Tasks and their interval Specific failure Responsibility How to perform


▪ Fixed Time Tasks type addressed for performing task. Plan, task
▪ Failure Finding Tasks by maintenance maintenance list, materials
tasks tasks and
▪ Condition Monitoring Tasks instructions
System Maintenance Strategy
WHAT WHEN WHY WHO HOW
No Task/Activity CM FT FF Relevant Task Interval1 Function Failure/Purpose Work SAP Plan Integrated
Description Centre8 Support Docs4
1 SCS pumps bearing X Replace main pump 1M To detect bearing faults/wear, imbalance, MECH OMP-600 OMI 0000-011
vibration and motor coupling or impellor faults, looseness, soft-
thermography foot, misalignment in pump or motor that OMP-609
analysis (motor and Replace main pump may eventually result in bearing
pump) impeller failure/seizure.
assembly/bearing
For pumps 2110-AB-001A/B/C,
Replace main coupling 2110-AB-003A/B and 2110-AB-004A/B, the
task is performed at power on the running
pump. Pumps are regularly changed over in
accordance with the power cycle briefing
and HVAC/CNS pump change-overs.
For pumps 2110-AB-002A/B, the task is
performed at shutdown on the running
pump (refer above LTDCL pump run task).
2 SCS internal X Repair, replace or 24M Ultrasonic thickness measurements are CONT OMP-123 OMI 0032-003
pipework inspection recoat pipework taken of Mat Class C piping to trend carbon
by Ultrasonic Testing steel pipe thinning and assist in predicting OPAL-0032-
thickness testing remaining service life of the SCS. DAS-005

Note: SCS corrosion is also monitored


through analysis of SCSWT corrosion
coupons, refer to Maintenance Strategy
OMM 2100-001.
Maintenance Service Delivery
▪ Shared
Responsibility
▪ Maintainers
▪ Operators
▪ Engineers

▪ Condition Monitoring
and Precision
Maintenance
Thank you

Questions